ML19317E675

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1975
ML19317E675
Person / Time
Site: Oconee 
Issue date: 10/08/1975
From: Sharpe R
DUKE POWER CO.
To:
Shared Package
ML19317E668 List:
References
NUDOCS 7912180839
Download: ML19317E675 (3)


Text

_ _ _ _ _ _ _ _

~.

UNIT Oconst Unit 1 DATE 10-8-75 DOCKET NO. 50-269 PREPARED BY R. O. Sharoe OPERATING STATUS 1.

REPORTING PERIOD: September 1 THROUGH September 30. 1975 GROSS HOURS IN REPORTING PERIOD:

720.0 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY) s Mond Year to Date Cumulathe 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 720.0 4795.6 14596.1

(

6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 720.0 4543.0 12797.3 0.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERcdLL ENERGY GENERATED (MWH)1841182 10793414 29030924 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 631790 3766930

_10085630 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 602457 3562584 9515603 12.

REACTOR SERVICE FACTOR 100.0 73.2 75.4 13.

REACTOR AVAILABILITY FACTOR 100.0 70.0 67.3 14.

UNIT SERVICE FACTOR 100.0 69.4 66.1 15.

UNIT AVAILA31LITY FACTOR 100.0 69.4 66.2 16.

UNIT CAPACITY FACTOR (Using Net 96.1 62.4 56.4 Capability) 17.

UNIT CAPACITY FACTOR (Uring Design Mwe) 94.3 61.3 55.4 18.

UNIT FORCED OUTAGE RATE 28.4 18.8 19.

SHUTDOWNS SCHEDLI.ED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling, February 1976 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT' X 100 IIOURS IN REPORTING PERIOD REACTOR AVAllABILI1Y FACTOR = HOURS REACTOR UAS AVAllaliLE TO OPERATE X 100 110URS IN REPORTING PERIO9 UNIT SERVICE TACTon

= HoliPS CD:ERATOR ON LINE X 100 HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 1100RS LTNTT WAS AVAll AULE TO GENERATE X 100 HOURS IN REPokTING PERIOD UNIT CAPACITY FACTOR

= **ET ELECTRICAL POWER GENERATED

[N.it. Capability or Design (Mpy-ng)]2,'18 UX ll0Uly REP 6t.Tbb p

PERIOD

,e U.L UNIT FORCED 00 TACE RATE e FORCED OUTAGE HOURS HEIRS GENEfdTi5Ii DN IJNE + FORCED O'UTAGE HOURS

DdCKET NO. 50-269_

~

Oconee Unit 1 UNIT SHUTDOWNS UNIT NAMii p gyg; 10-8-75 REPORT MONTil September 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 1

(1) REASON (2) METilOD A -EQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.

2-MANUAL C-RFI l:LLING SCRAM D-htGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPLRATIONAL ERROR (EXPLAIN) 11 -OlllLR (EXPLAIN)

SUMMARY

No outages this month.

DOCKET NO.

50-269 UNIT oconee Unit 1 DATE 10/8/75 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWE!', LEVEL DAY (MWe-net)

DAY (MWe-net) 1 842 17 8_4.3 2

841 18 841 843 3

795 19 840 835 20 4

843 837 21 5

845 827 22 6

846 833 23 7

845 830 24 8

844 825 25 g

845

~ 831 26 10 844 832 27 11 846 827 28 12 847 830 29 13 845 833 30 14 833 31 15 836 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.