ML19317E658

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Sept 1975
ML19317E658
Person / Time
Site: Oconee  
Issue date: 10/08/1975
From: Parker W
DUKE POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19317E668 List:
References
NUDOCS 7912180834
Download: ML19317E658 (2)


Text

y.c::Tf:Ls; m& (Toa C:t.W LOOR PREP!a/ ner) -

i NRC DISThiEUTION F_OR PART 50 DOCKET MATERI AL (TEMPORARY FORM)

CONTROL NO:

inric FILE: WICI:L'l REMT TE E I

FROM: Duke Power Co.

DATE OF DOC D ATE R EC'D LTR TWX RPT OTHER Charlotte William 0., N.C. Parker 10-8-75 10-10-75 XXX TO:

ORIG CC OTHER SENT AEC PDR

^^^

XXX SENT LOCAL PDR NRC 1 Sjsned l 0_

CLASS ; UNCLASS l PROPINFO INPUT NO CYS REC'D DOCKET NO:

_yX 1

5WlO!270/287 DESCRIPT!ON:

ENCLOSURES:

Ltr tu.ns the folicuin ;:

1:m hly Ec;>crt for September 1975 Fl:nt L Cor ou.nt Operability 0 'V;ilm ilb:-

Thit.sey.rc t ::s be used it pr :pr.rini, Grav Z.

cct D i,v Plans & Op.rctions.

RJi. ten 01 CO'IES "CC'II:

1 PLANT NAME: Oconee ge K 3 FOR ACTlON/iNFORMAllON SAB 10-10.-75 BUTLER (L)

SCHWENCER (L) ZlEMANN (L)

REG AN (E)

W/ Copim W/ Copies W/ Copict W/ Copss LE AR h(cit?M' AUTT 9B"7'DW/ Con CLARK (L)

STOLZ (L)

DICKER (E)

W/ Cooies W/ Cepies W/ Copics PAR R (L)

V/sSSALLO (L)

KN!GHTON (E)

SPELS W/ Copias W/ Copies W/ Copier W/ Copies DO Nn? EEMOVE

  • ~

KN!EL (L)

AURPLE (L)

YOUNGr.LOOD (E),,.1 Irc /y:

W/ Copies W/ Copies W/ Cop:cs W 4 Copies INTE 6Nhl DISTkiSUTION

[G R LD TECH REVIEW DENTON LIC ASST A/T IND.

NHCPuh SCHROEDER GHIMES R. DIGGS (L)

BRAITlIAN

~

f OGC, HOOM P 506A MACCARY GAMMILL H. GE ARIN (L)

SALTZMAN GOSSICK/ STAFF KNIGHT K ASTNE R E. GOULDOURNE (L)

MELTZ CASE PAWLiCKl BALLARD P. KREUTZER (E)

GIAMBUSSO SHAO SPANGLER J. LEE (L)

PLANS BOYD STELLO M. r.;"r, 7.c;.% (L)

CDONALD MOOHE (L)-

HOUSTON ENVIRO S. REED (El CH APM AN -

DEYOUNG (L)

NOVAK MULLER M. SERVtCE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER y S. SHEPPARD (L)

E. COUPE

~GOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETEPSON P. CO L LINS TEDEFCn YOUNGBLOOD H. SM:TH (L)

HARTFIELD (2)

DENISE J. COLL n:S REGAN S. TEETS (L)

KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)

EISENHUT Fil F & REGION (2)

BENAROYA V. WILSON (L)

WIGGINTON VOLLMER H A H LESS R. INGRAM (L)

STEELE ILDURO/5 (r)

EXTERNAL DISTR!DUTION pl - LOCAL PDR. _Walhalla(1)d)S.C.(10) - N ATION AL LABS._-

1 - PDR. SAN /LA/NY 1 - TIC (ABEHNATHY)

- f1 -- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB f 1 - ASLB.

1 - CONSULTANTS 1 - G. ULRIKSON. ORN L 1 -- Newton Anderson NEWM AR K/B LUM E/AG B ABt AN 1 -- AGMED (RUTH GUSSMAN)

- ACRS HOLDING /SENT Rm B-127 GT 1 - J. D. RUNKLE'S. Rrn E 201 GT e 1912180t h [

i 2%

s..

DUKE POWER CO>fPANY Powza Beturwo 422 SocTn Cituacu STareT, CHAaWTTE. N. C 28242 R %l[

wiw au c.=* u ca.aa.

October 8, 1975 e,

@ct Pat ** DEN-T EWi

  • E A 704 s, c.

p.x,:. c,.,

' a-,e,-40s3 T.(A'.

/

Director

[.s-ecce

'Q Office of Management Information j 'p 0CT101975.*-(;3:1;i and Program Control 7

p, U. S. Nuclear Regulatory Commission Washington, D. C.

20555

(";

Mll n.e s.-w

.a tamt M Re: Oconee Nuclear Station "c ' -

/

Docket Nos. 50-269, -270, -287 N. *,#, a \\ s9

-o t

w

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of September, 1975.

Ve truly yours, A

/

~

.y William O. Parker, Jr.

ROS:ge

!~7 O

/h, S

<.:g7 Attachment

'0 1 78 /

  • 0 cc:

Mr. Norman C. Moseley

( '.

z'i thJ,*:;&%,

s A'

'g fU' i

10828

.