ML19317E650

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1974
ML19317E650
Person / Time
Site: Oconee  
Issue date: 09/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E641 List:
References
NUDOCS 7912180830
Download: ML19317E650 (3)


Text

. _ - _

7 UNIT Oc r m Unit 2 DATE September 10, 1974 OPERATING STATUS 1.

FEPORTING PERIOD: August 1 TO August 31. 1974 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTliORIZED POWER LEVEL }f4t 2568

}fde-NET 3.

POWER LEVEL TO WilICll RESTRICTED (IF ANY):

~None 4.

REASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE

}DNTl!

YR-TO-DATE TO DATE 5.

HOURS REACTOR WAS CRITICAL 11.0 1275.6 1933.0 6.

Il0URS GENERATOR ON-LINE 9.9 1138.4 1651.6 7.

GROSS TilERMAL POWER GENERATED (MWH) 10320 1876332 2479303 8.

GROSS ELECTRICAL POWER GENERATED (if411) 3312 645358 821668 9.

NET ELECTRICAL POWER GENERATED (MWil)

N/A 10.

REACTOR AVAILABILITY FACTOR (1)

N/A 11.

PLANT AVAILABILITY FACTOR (2)

N/A 12.

PLANT CAPACITY FACTOR (3)

N/A 13.

FORCED Ol/TAGE RATE (4)

N/A 14.

SilUTDOWNS SCllEDULED TO BEGIN IN NEXT 6 MONTilS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SliUTDOWN AT END OF REPORT PERIOD. ESTDtATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT'ON) REPORT THE FOLLOWING:

DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION COMMERCIAL OPERATION 10/1/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAL

  • 100 GROSS HOURS IN REFORTING PERIOD (2) PLANT AVAILABILITY FACTOR = 110URS GENERATOR ON-LINE
  • 100 GROSS Il0URS IN REPORTING PERIOD (3) ' PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
  • GROSS tl01;RS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OUTAGE !!OURS
  • 100

~

7URS GENERATOR ON-LINE + FORCCD OUTAGE HOURS 7 9121sof30

m

'N j

_e UNIT ocone, Unit 3 DATE Sentesbar 10.' 1974

' ~.

OPERATING STATUS 1.

REPORTING PERIOD:

August 1 TO August 31, 1974 GROSS I!OURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTliORIZED POWER LEVEL }!Wt 2568 MWe-NET 3.

POWER LEVEL TO WillCll PESTRICTED (IF ANY):

  • None 4.

REASONS FOR RESTRICTIONS (IF ANY):

TIIIS CUFPJLATIVE lONTl!

YR-TO-DATE TO DATE 5.

Il0URS REACTOR WAS CRITICAL N/A 6.

Il0URS GENERATOR ON-LINE N/A 7.

GROSS Ti!ERNAL POWER GENERATED (MWil)

N/A 8.

CROSS ELECTRICAL POWER GENERATED (MWil) N/A 9.

NET ELECTRICAL POWER GENERATED (MWil)

N/A 10.

REACTOR AL\\ILABILITY FACTOR (1)

N/A 11.

PLANT AVAILABILITY FACTOR (2)

N/A 12.

PLANT CAPACITY FACTOR (3)

N/A 13.

FORCED OtfrAGE RATE (4)

N/A 14.

S!!UTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTllS (STATE TYPE, DATE AND DURATION OF EAClf):

15.

IF SlIUTDOWN AT END OF REPORT PERIOD, ESTII ATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO COFDIERCIAL OPERATION) REPORT TliE FOLLOWING:

DATE LAST DATE REASON FOR FORECAST ACIIIEVED DIFFERENCE INITIAL CRITICALITY 9/5/74 INITIAL ELECTRICAL 9/11/74 F0WER GENERATION COFDIERCIAL OPERATION '

11/1/74 (1) REACTOR AVAILABILITY FACTOR = I!OURS REACTOR WAS CRITICAL

  • 100 GROSS liOURS IN REPORTING PERIOD l

(2) PLA![f AVAILABILITY FACTOR = _l10URS CENERATOR ON-LINE

  • 100 GROSS liOURS IN REPORTING PERIOD (3) PLANT-CAPACITY FACTOR = Ng ELECTRICAL _ POWER CENERATED _,

CURRENTLY LICENEED POWER LEVEL

  • GROSS 10URS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OUTAGE UGURS
  • 100

~~

'~~liUURS GENERATOR ON-LINE + FORCED OUTAGE Il0URS'