. _ - _ ._-

7 .%

UNIT Oc r m Unit 2 DATE September 10, 1974 OPERATING STATUS

1. FEPORTING PERIOD: August 1 TO August 31. 1974 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTliORIZED POWER LEVEL }f4t 2568 }fde-NET
3. POWER LEVEL TO WilICll RESTRICTED (IF ANY):
  • ~None
4. REASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE

}DNTl! YR-TO-DATE TO DATE

5. HOURS REACTOR WAS CRITICAL 11.0 1275.6 1933.0
6. Il0URS GENERATOR ON-LINE 9.9 1138.4 1651.6
7. GROSS TilERMAL POWER GENERATED (MWH) 10320 1876332 2479303
8. GROSS ELECTRICAL POWER GENERATED (if411) 3312 645358 821668
9. NET ELECTRICAL POWER GENERATED (MWil) N/A
10. REACTOR AVAILABILITY FACTOR (1) N/A
11. PLANT AVAILABILITY FACTOR (2) N/A
12. PLANT CAPACITY FACTOR (3) N/A
13. FORCED Ol/TAGE RATE (4) N/A
14. SilUTDOWNS SCllEDULED TO BEGIN IN NEXT 6 MONTilS (STATE TYPE, DATE AND DURATION OF EACH):
15. IF SliUTDOWN AT END OF REPORT PERIOD. ESTDtATED DATE OF STARTUP:
16. PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT'ON) REPORT THE FOLLOWING:

DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION COMMERCIAL OPERATION 10/1/74

, (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAL *100 GROSS HOURS IN REFORTING PERIOD (2) PLANT AVAILABILITY FACTOR = 110URS GENERATOR ON-LINE *100 GROSS Il0URS IN REPORTING PERIOD (3) ' PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL

  • GROSS tl01;RS IN REPORTING PERIO (4) FORCED~ OUTAGE RATE = FORCED OUTAGE !!OURS
  • 100 .. 1 7URS GENERATOR ON-LINE + FORCCD OUTAGE HOURS l 7 9121sof30 l

m 'N j _e .

.. .. UNIT ocone , Unit 3 DATE Sentesbar 10.' 1974 '

'~.

OPERATING STATUS

1. REPORTING PERIOD: August 1 TO August 31, 1974 GROSS I!OURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTliORIZED POWER LEVEL }!Wt 2568 MWe-NET
3. POWER LEVEL TO WillCll PESTRICTED (IF ANY):
  • None
4. REASONS FOR RESTRICTIONS (IF ANY):

TIIIS CUFPJLATIVE lONTl! YR-TO-DATE TO DATE

5. Il0URS REACTOR WAS CRITICAL N/A
6. Il0URS GENERATOR ON-LINE N/A
7. GROSS Ti!ERNAL POWER GENERATED (MWil) N/A
8. CROSS ELECTRICAL POWER GENERATED (MWil) N/A
9. NET ELECTRICAL POWER GENERATED (MWil) N/A
10. REACTOR AL\ILABILITY FACTOR (1) N/A
11. PLANT AVAILABILITY FACTOR (2) N/A
12. PLANT CAPACITY FACTOR (3) N/A
13. FORCED OtfrAGE RATE (4) N/A
14. S!!UTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTllS (STATE TYPE, DATE AND DURATION OF EAClf):
15. IF SlIUTDOWN AT END OF REPORT PERIOD, ESTII ATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO COFDIERCIAL OPERATION) REPORT TliE FOLLOWING:

DATE LAST DATE REASON FOR FORECAST ACIIIEVED DIFFERENCE INITIAL CRITICALITY 9/5/74 INITIAL ELECTRICAL 9/11/74 F0WER GENERATION COFDIERCIAL OPERATION ' 11/1/74 (1) REACTOR AVAILABILITY FACTOR = I!OURS REACTOR WAS CRITICAL *100 GROSS liOURS IN REPORTING PERIOD l (2) PLA![f AVAILABILITY FACTOR = _l10URS CENERATOR ON-LINE *100 GROSS liOURS IN REPORTING PERIOD (3) PLANT- CAPACITY FACTOR = Ng ELECTRICAL _ POWER CENERATED _ , , . _ _ ___ ___

CURRENTLY LICENEED POWER LEVEL

  • GROSS 10URS IN REPORTING PERIO (4) FORCED~~OUTAGE RATE = FORCED OUTAGE UGURS
  • 100 .

'~~liUURS GENERATOR ON-LINE + FORCED OUTAGE Il0URS'

._