7 UNIT Oc r m Unit 2 DATE September 10, 1974 OPERATING STATUS 1.
FEPORTING PERIOD: August 1 TO August 31. 1974 GROSS HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTliORIZED POWER LEVEL }f4t 2568
}fde-NET 3.
POWER LEVEL TO WilICll RESTRICTED (IF ANY):
~None 4.
REASONS FOR RESTRICTIONS (IF ANY):
THIS CUMULATIVE
}DNTl!
YR-TO-DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL 11.0 1275.6 1933.0 6.
Il0URS GENERATOR ON-LINE 9.9 1138.4 1651.6 7.
GROSS TilERMAL POWER GENERATED (MWH) 10320 1876332 2479303 8.
GROSS ELECTRICAL POWER GENERATED (if411) 3312 645358 821668 9.
NET ELECTRICAL POWER GENERATED (MWil)
N/A 10.
REACTOR AVAILABILITY FACTOR (1)
N/A 11.
PLANT AVAILABILITY FACTOR (2)
N/A 12.
PLANT CAPACITY FACTOR (3)
N/A 13.
FORCED Ol/TAGE RATE (4)
N/A 14.
SilUTDOWNS SCllEDULED TO BEGIN IN NEXT 6 MONTilS (STATE TYPE, DATE AND DURATION OF EACH):
15.
IF SliUTDOWN AT END OF REPORT PERIOD. ESTDtATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT'ON) REPORT THE FOLLOWING:
DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION COMMERCIAL OPERATION 10/1/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAL
- 100 GROSS HOURS IN REFORTING PERIOD (2) PLANT AVAILABILITY FACTOR = 110URS GENERATOR ON-LINE
- 100 GROSS Il0URS IN REPORTING PERIOD (3) ' PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
- GROSS tl01;RS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OUTAGE !!OURS
- 100
~
7URS GENERATOR ON-LINE + FORCCD OUTAGE HOURS 7 9121sof30
m
'N j
_e UNIT ocone, Unit 3 DATE Sentesbar 10.' 1974
' ~.
OPERATING STATUS 1.
REPORTING PERIOD:
August 1 TO August 31, 1974 GROSS I!OURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTliORIZED POWER LEVEL }!Wt 2568 MWe-NET 3.
POWER LEVEL TO WillCll PESTRICTED (IF ANY):
- None 4.
REASONS FOR RESTRICTIONS (IF ANY):
TIIIS CUFPJLATIVE lONTl!
YR-TO-DATE TO DATE 5.
Il0URS REACTOR WAS CRITICAL N/A 6.
Il0URS GENERATOR ON-LINE N/A 7.
GROSS Ti!ERNAL POWER GENERATED (MWil)
N/A 8.
CROSS ELECTRICAL POWER GENERATED (MWil) N/A 9.
NET ELECTRICAL POWER GENERATED (MWil)
N/A 10.
REACTOR AL\\ILABILITY FACTOR (1)
N/A 11.
PLANT AVAILABILITY FACTOR (2)
N/A 12.
PLANT CAPACITY FACTOR (3)
N/A 13.
FORCED OtfrAGE RATE (4)
N/A 14.
S!!UTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTllS (STATE TYPE, DATE AND DURATION OF EAClf):
15.
IF SlIUTDOWN AT END OF REPORT PERIOD, ESTII ATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO COFDIERCIAL OPERATION) REPORT TliE FOLLOWING:
DATE LAST DATE REASON FOR FORECAST ACIIIEVED DIFFERENCE INITIAL CRITICALITY 9/5/74 INITIAL ELECTRICAL 9/11/74 F0WER GENERATION COFDIERCIAL OPERATION '
11/1/74 (1) REACTOR AVAILABILITY FACTOR = I!OURS REACTOR WAS CRITICAL
- 100 GROSS liOURS IN REPORTING PERIOD l
(2) PLA![f AVAILABILITY FACTOR = _l10URS CENERATOR ON-LINE
- 100 GROSS liOURS IN REPORTING PERIOD (3) PLANT-CAPACITY FACTOR = Ng ELECTRICAL _ POWER CENERATED _,
CURRENTLY LICENEED POWER LEVEL
- GROSS 10URS IN REPORTING PERIO (4) FORCED OUTAGE RATE = FORCED OUTAGE UGURS
- 100
~~
'~~liUURS GENERATOR ON-LINE + FORCED OUTAGE Il0URS'
._