UNIT Oconta Unit 1

'pV DATE 7/8/77 DOCKET NO. 50-269 PREPARED BY J. W. Simmons OPERATING' STATUS

1. REPORTING PERIOD: June 1 .

THROUGH June 30, 1977 GROSS HOURS IN REPORTING PERIOD: 720.00

2. CURRENTLY AUTHORIZED POWER t.EVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 860
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 718.32 2980.28 25096.08 .
6. - -

REACTOR RESERVE SHUTDOWN HOURS

7. HOURS GENERATOR ON-LINE 707.11 2933.78 22897.77
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH) 1768565 7136811 53522522
10. GROSS ELECTRICAL ENERGY GENERATED 602090 2454150 18577580 (MWH)
11. NET ELECTRICAL ENERGY GENERATED 573889 2327328 17559861 (MWH)
12. REACTOR SERVICE FACTOR 99.77 68.62 72.31
13. REACTOR AVAIIABILITY FACTOR 100.00 70.56 68.54
14. UNIT SERVICE FACTOR 98.21 67.55 65.98
15. UNIT AVAILABILITY FACTOR 98.21 67.55 66.07
16. UNIT CAPACITY FACTOR (Using Net 92.68 62.31 58.84 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 89.86 60.41 57.05
18. UNIT FORCED OUTAGE RATE 1.79 32.45 19.95
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - July 30 - 6 weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAT. X 100 110URS IN REPORTING PERIOD REACTOR AVAILtBILI1Y FACTOR = Hol!FS RFACTOR WAS AVAILiril.E TO OPERATE X 100 110URS IN RLFORTING PERIOD UNIT SERVICE TACT 0" = HOITS CT2 ERAT 09. ON !.TNE HOURS IN REPORIING PERIOD '

UNIT AVAIL \BILITY FAC~0R = 110C!1S UNTT WAf \VAll A31.E TO GENEPATE X 100 HOURS IN REPuh't 150 t'ERIOD UNIT CAPACITY FACTOR = NET ELECTRICAL PohER GTNERATED __ y ,g (Wt C.ipatillity or Design (Mwe-Nd).1 X I!OURS LN REPt h riNC PERIOD UNIT FORCD OUTACE RATE < FORCrn OUTAGE IIoli!:S X 100 IRS HOURS GENEPaTOR 7912180 ON I.INE + TORCED C 9

DOCKET NO. 50-269

' IJNIT oconee Unit 1 DATE 7/8/77 AVERAGE DAILY UNIT POWER LEVEL MONTH June, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-nes) DAY (MWe-net) 763 853 1 17 765 853 2 18 767 3 3 19 793 850 4 3 5 21 6 271 22 848 370 851 7 23 02 851 8 24 9 804 25 850 846 847 10 26 848 847 853 852 12 28 853 851 13 3 14 853 30 850 15 852 31 855 16 DAILY UNIT POWER LEVEL FOR\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe net for each day in the reporting month.

Compute to the nearest wriole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrie.11 rating of tne unit. there may be ..t easions when the daily average power level exceeds the 1002 line (or the restricted power lesel hne). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l

DdCKET NO. 50-269 Oconee Unit 1 UNIT SHUTDOWNS UNIT NAMii 7/8/77 DATli ._._

RiiPORT MONTil June. 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS T 11 77-06-06 F 12.16 11 3 Turbine shaft oil pump trip caused by technician error.

12 77-06-06 F .73 A 3 Turbine trip. Investigation could show no reason for trip.

(1) REASON (2) METHO'.'

A -EQUIPMENT l- ALLURE (EXPLAIN) 1-MANUAL B- MAIPfT. OR TEST. 2-MANUAL C- REI'ULLING SCRAM ,

D-REGULATORY RESTRICTION 3-AUTOMATIC -

E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION 4-Other F- ADMINISTR ATIVE G-OPERATIONAL ERROR (EXPLAIN)

II-0TilLR (EXPLAIN)

SUMMARY

No major outage this month.

_ - _ _ - -_