ML19317E607
| ML19317E607 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/10/1974 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317E602 | List: |
| References | |
| NUDOCS 7912180807 | |
| Download: ML19317E607 (1) | |
Text
'
UNIT oconee Unit 2 V
DATg June 10, 1974
.s.
OPERATING STATUS 1.
REPORTING PERIOD:
May 1 TO May 31, 1974 GROSS HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL MWt MWe-NET 3.
POWER LEVEL 10 k"dICH RESTRICTED (IF ANY):
None 4.
REASONS FOR RESTRICTIONS (IF ANY): Oconce Unit 2 is currently in power esenlation testing and is not conunercially operable. Items 9-13 are not applicable.
THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL 197.1 282.7 940.12 6.
IOURS GENERATOR ON-LINE 152.6 216.6 729.8 7.
GROSS THERMAL POWER GENERATED (MWH) 204002 310425 913396 8.
GROSS ELECTRICAL POWER GENERATED (MWH) 66598 99598 275908 9.
NET ELECTRICAL POWER GENERATED (MWH)
- 10. REACTOR AVAILABILITY FACTOR (1)
- 11. PLANT AVAILABILITY FACTOR (2) 12.
PLANT CAPACITY FACTOR (3) 13.
FORCED OUTAGE RATE (4) 16 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
15.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO COMMERCL1L OPERATION) REPORT THE FOLLOWING:
~*
~X DATE LA5T DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION 7/10/74 CO:CiERCIAL OPERATION (1) REACTOR AVAILABILITY 7 ACTOR = I!OURS REACTOR WAS CRITICAL
- 100 CROSS HOURS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = IMURS GENERATOR ON-LINE
- 100 GRGSS HOURS 1:i REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL P0WER GENERATED CURRE:JTLY LICENS5 P6sER LEVEi7 DROSS 10URS IN REPORiiNG PERIOt
~
(4) FORCED OUTAGE RATE = FORCED GL"" AGE I!OURS
- 100
~
~
HOURS CENERATOR ON-LINE + FORCED OUTAGE HOURS
~
3912180
.