Monthly Operating Rept for May 1974
ML19317E607
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E602 List:
References
NUDOCS 7912180807
Download: ML19317E607 (1)


Text

'

UNIT oconee Unit 2 V DATg June 10, 1974

.s..

OPERATING STATUS ..',

1. REPORTING PERIOD: May 1 TO May 31, 1974 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL MWt MWe-NET
3. POWER LEVEL 10 k"dICH RESTRICTED (IF ANY): None
4. REASONS FOR RESTRICTIONS (IF ANY): Oconce Unit 2 is currently in power esenlation testing and is not conunercially operable. Items 9-13 are not applicable.

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE

5. HOURS REACTOR WAS CRITICAL 197.1 282.7 940.12
6. IOURS GENERATOR ON-LINE 152.6 216.6 729.8
7. GROSS THERMAL POWER GENERATED (MWH) 204002 310425 913396
8. GROSS ELECTRICAL POWER GENERATED (MWH) 66598 99598 275908
9. NET ELECTRICAL POWER GENERATED (MWH)
10. REACTOR AVAILABILITY FACTOR (1)
11. PLANT AVAILABILITY FACTOR (2) _
12. PLANT CAPACITY FACTOR (3) __
13. FORCED OUTAGE RATE (4) 16 SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND -

DURATION OF EACH):

15. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
16. PLANTS IN TEST STATUS (PRIOR TO COMMERCL1L OPERATION) REPORT THE FOLLOWING:

~*

~X DATE LA5T DATE REASON FOR FORECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION CO:CiERCIAL OPERATION 7/10/74 (1) REACTOR AVAILABILITY 7 ACTOR = I!OURS REACTOR WAS CRITICAL *100 CROSS HOURS IN REPORTING PERIOD -

(2) PLANT AVAILABILITY FACTOR = IMURS GENERATOR ON-LINE *100 GRGSS HOURS 1:i REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL P0WER GENERATED ~

CURRE:JTLY LICENS5 P6sER LEVEi7 DROSS 10URS IN REPORiiNG PERIOt

~

(4) FORCED OUTAGE RATE = FORCED GL"" AGE I!OURS

~

  • 100 HOURS CENERATOR ON-LINE + FORCED OUTAGE HOURS

~

3912180

.