Monthly Operating Rept for May 1974
ML19317E605
Person / Time
Site: Oconee 
Issue date: 06/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E602 List:
References
NUDOCS 7912180805
Download: ML19317E605 (3)


Text

_ _ _ _.. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

m s'

UNIT Oconee Unit 1 DATE June 10, 1974 c

0 P E R A T I'N G STATUS

.i 1.

REPORTING PERIOD:

May l' TO May 31, 1974 GROSS 10URS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTIDRIZED POWER LEVEL MWt 2568 MWe-NET 871 3.

POWER LEVEL 10 WHICH RESTRICTED (IF ANY):

4.

KEASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.

EDURS REACTOR WAS CRITICAL 24.5 2356.5 6720.4

6. "10URS GENERATOR ON-LINE 23.31 2286.1 5275.2 7.

GROSS THERMAL POWER GENERATED (MWH) 59931 5266537 11277418 8.

GROSS ELECTRICAL POWER GENERATED (MWH) 20260 1845392 3933980 9.

NET ELECTRICAL POWER GENERATED (MWH) 15523 1744489 3703567 3.3 65.8 87'.5 10.

REACTOR AVAILABILITY FACIOR (1) 11.

PLANT A7AILABII.ITY FACTOR (2) 3.1 63.1 68.7 2.4 55.3 55.4

12. PLANT CAPACITY FACTOR (3) 6.7 8.0 13.

IVRCED OUTAGE RATE (4) 14.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SHUTDOL AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE IVLLOWING:

DATE LAST DATE REASON FOR PURECAST ACHIEVED DIFFERENCE IAITIAL CRITICALITY l

INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL

  • 100 GROSS 10URS IN REPORTING PERIOD (2) PLANT AVAILABILITY FACTOR = 180URS GENERATOR ON-LINE
  • 100 GR0SS HOURS IN REPORTING PERIOD (3) PLANT. CAPACITY FACTOR = NET ELECTRICAL POWER CENERATED DURRENTLY IICENSED'KMER'LTVEL* GROSS HOURS IN REPORTING PERIOi

~

-(4) FORCED OUTAGE RATF. = ZORCED OUTAGE 10b.'."

  • 100

~~

~

NURS GENERATOR ON-LINE + FGRCED OUTAGE HOURS 7912180[C k

m

+.)

e

.i UNIT Oconee Unit 1 DATE June 10, 1974 DA i L' 5 ANT POWER OUTPUT MONTH Hay, 1974 DAY AVERAGE DAllt NWe-net DAY AVERAGE DAILY MWe-net 1

19,331 22

- 69 2

-498 23

- 72 3

-237 24

- 31 4

-138 25

-132 5

-126 26

-133 6

-121

-140 27 -

7

-102 28

-145 8

- 78

-I44 29 9

-104

-143 30 10

-101

-159 33 11

-103 12

-108

-104 13 1

l 14

-108

-101 15 16

-100

-101 j7 18

- 99 t

i f

19

- 73 20

- 71 67 21

--m

7

,g.

7,..

?":ARY :

l' NIT NNLE

'Oconee Unit 1 DATE June 10, 1974 CO'IPLETED BY REPORT MO: int May, 1974 FLANT S 11 U T D O W N S a

(~f TYPE MET:iOD OF F-FORCED DURATION SilUTTING DOW A

DATE S-SCHEDULED (110URS)

REASON (1)

Tile REACTOR (2)

CO:EiENTS 4

7 740502 S

720.7 I

B A

9 9

f~ i (1) REASON:

',(2) 1

!iEU103:

A-EQUIP?IENT FATLURE (EXPI.AIN)

A-ll!J'JAL B-!!All:T. OR TEST B-1*2KAL PCRKI C-REFUEL.ING C

.8 JTO'L\\ TIC SCRMI D-REGULATORY RESTRICTION E-OPE:L\\ TOR TRAINIllG N;D LICENSE EXXIINATIO;1 F-ADIII!ilSTRATIVE G-OPERATIO:lAL ERROR (EXPLAIN) n B

t e

o e