p' UNIT Oconne Unit 3 L
DATE 03/09/76 DOCKET NO.
50-287 PREPARED BY E.
D.
R1 aken n OPERATING STATUS 1.
REPORTING PERIOD:
Februarv 1 THRGUGH February 29. 1976 GROSS HOURS IN REPORTING PERIOD:
696.00 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
871 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
NONE 4.
REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative 5.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 544.6 1271.6 8416.9 6.
REACTOR RESERVE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 543.0 1260.5 8209.2 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED (MWH) 1134700 2884171 18802221 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 392830 993570 6438484 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 375429 950354 6128788 12.
REACTOR SERVICE FACTOR 78.3 88.4 79.5 13.
REACTOR AVAI1 ABILITY FACTOR 78.0 87.9 82.1 14.
UNIT SERVICE FACTOR 78.0 87.5 77.6 15.
UNIT AVAILABILITY FACTOR 78.0 87.5 77.6 16.
UNIT CAPACITY FACTOR (Using Net 61.9 75.8 66.5 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 60.8 74.4
- 65.3 18.
UNIT FORCED OUTAGE RATE 22.0 12.5 11.5 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPCRT PERIOD, ESTIMATED DATE OF STARTUP:
K'iAC'.ox SERVICE FACTOR = HOURS REACTOR MAS CRITICAI,X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = HOURS REACTOR UAS_AVAIIAlil.E TO OPERATE X 100 110URS IN REFORTING PERIOD UNIT SERVICE FACTOR
= HOUPS GENERATOR ON 1,1NE g
HOURS IN REPORTINJ PERIOD UNIT AVAIIABILITY FACTOR = 110URS UNTT WAS AVAIT At!.E TO GENERATE X 100
+
HOURS IN REPORTING PERIOD
= NET ELECTRICAL POWER GENERATh 91 b } 8,0 7 UNIT CAPACITY FACTOR
[NetCapabilityorDesign(Mwe-Nety.1XI!OURSINRth. Tid.C0 s.
PERIOD UNIT FORCED OUTAGE RATE =- FonCFD OUTAGE HOURS X 100 HOURS GENEPaTOR ON 1.INE + FORCED OUTAGE HOURS
~
DOCKET NO.
50-287 UNIT oconee Unit 3 DATE 03/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH Februnrv 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 736 17 625 2
844 18 624 624 847 19 3
4 845 20 622 5
845 21 617 6
834 22 618 7
837 23 346 8
755 24 9
639 25 10 639 26 11 632 27 12 611 28 13 629 29 14 630 30 15 630 31 16 630 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily averne power level exceeds the 100'7c line (or the restricted power lesel line). In such cases. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
DdCKET NO. 50-287 UNIT SHUTDOWNS UNIT NAMl! Oconee Unit 3 DATI: 03/09/76 REPORT MONTil February 1976 TYPE METtiOD OF F FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS s
3 760223 F
153 A
1 Reactor shutdown for replacement of reactor coolant pump senis.
1 1
(I) REASON (2) METilOD A E QUIPMENT I AILURE (EXPLAIN) 1-MANUAL B - M AINT. OR TEST.
2-M ANUAL C-REI ULLING SCR AM D-RIGtf LA10RY RESTRICTION 3 - AlflOM A TIC E-OPER ATOR TRAINING AND SCR AM l.lCENSE EXAMINATION F-A DMINIS1 R ATIVE G-OPLR ATION AL I:R ROR ILXPt AIN)
II-OlllL R (EXPLAIN) 4
SUMMARY
Unit was base-loaded during the month.