Monthly Operating Rept for Feb 1976
ML19317E520
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/09/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19275B601 List:
References
NUDOCS 7912180754
Download: ML19317E520 (3)


Text

_ __.

p' UNIT Oconne Unit 3 L DATE 03/09/76 DOCKET NO. 50-287 PREPARED BY E. D. R1 aken n OPERATING STATUS _

1. REPORTING PERIOD: Februarv 1 THRGUGH February 29. 1976 ___

GROSS HOURS IN REPORTING PERIOD: 696.00

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) NONE
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL _

544.6 1271.6 8416.9

6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 543.0 1260.5 8209.2
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWH) 1134700 2884171 18802221
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392830 993570 6438484
11. NET ELECTRICAL ENERGY GENERATED (MWH) 375429 950354 6128788
12. REACTOR SERVICE FACTOR 78.3 88.4 79.5
13. REACTOR AVAI1 ABILITY FACTOR 78.0 87.9 82.1
14. UNIT SERVICE FACTOR 78.0 87.5 77.6
15. UNIT AVAILABILITY FACTOR 78.0 87.5 77.6
16. UNIT CAPACITY FACTOR (Using Net 61.9 75.8 66.5 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 60.8 74.4 *65.3
18. UNIT FORCED OUTAGE RATE 22.0 12.5 11.5
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPCRT PERIOD, ESTIMATED DATE OF STARTUP:

K'iAC'.ox SERVICE FACTOR = HOURS REACTOR MAS CRITICAI,X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILITY FACTOR = HOURS REACTOR UAS_AVAIIAlil.E TO OPERATE X 100 110URS IN REFORTING PERIOD UNIT SERVICE FACTOR = HOUPS GENERATOR ON 1,1NE ,

g HOURS IN REPORTINJ PERIOD

+

UNIT AVAIIABILITY FACTOR = 110URS UNTT WAS AVAIT At!.E TO GENERATE X 100 HOURS IN REPORTING PERIOD UNIT CAPACITY FACTOR

= NET ELECTRICAL POWER GENERATh 91 b } 8,0 7 s.

[NetCapabilityorDesign(Mwe-Nety.1XI!OURSINRth. Tid.C0 PERIOD UNIT FORCED OUTAGE RATE =- FonCFD OUTAGE HOURS X 100 HOURS GENEPaTOR ON 1.INE + FORCED OUTAGE HOURS

~

DOCKET NO. 50-287 UNIT oconee Unit 3 DATE 03/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH Februnrv 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

736 17 625 1

844 18 624 2

847 19 624 3

845 20 622 4

845 21 617 5

834 22 618 6

837 23 346 7

8 755 24 9 639 25 10 639 26 11 632 27 12 611 28 -

13 629 29 14 630 30 15 630 31 16 630 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily averne power level exceeds the 100'7c line (or the restricted power lesel line). In such cases. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

DdCKET NO. 50-287 . .

UNIT SHUTDOWNS UNIT NAMl! Oconee Unit 3 DATI: 03/09/76 REPORT MONTil February 1976 TYPE METtiOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS s

3 760223 F 153 A 1 Reactor shutdown for replacement of reactor coolant pump senis.

1 1

(I) REASON (2) METilOD A E QUIPMENT I AILURE (EXPLAIN) 1-MANUAL B - M AINT. OR TEST. 2-M ANUAL C- REI ULLING SCR AM D-RIGtf LA10RY RESTRICTION 3 - AlflOM A TIC E-OPER ATOR TRAINING AND SCR AM l.lCENSE EXAMINATION F- A DMINIS1 R ATIVE G- OPLR ATION AL I:R ROR ILXPt AIN)

II-OlllL R (EXPLAIN) 4

SUMMARY

Unit was base-loaded during the month.