Monthly Operating Rept for Feb 1976
ML19317E519
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/09/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19275B601 List:
References
NUDOCS 7912180753
Download: ML19317E519 (3)


Text

i UNIT Oconee Unie 2 DATE 03/09/76

)

DOCKET NO.

50-270 1

PREPARED BY E. D. Blakeman OPERATING STATUS 1.

REPORTING PERIOD:

February 1 THROUGH February 29, 1976 GROSS HOURS IN REPORTING PERIOD:

696.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

NONE 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 466.2 1202.1 9761.2 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERAT3R ON-LIN' 454.8 1172.3 9451.7 8.

UNIT Id. SERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)1085524 2868883 22541311 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 367500 975440 7675996 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 347852 928697 7283848 12.

REACTOR SERVICE FACTOR 67.0 83.5 75.5 13.

REACTOR AVAIIABILITY FACTOR 65.3 82.0 73.7 14.

UNIT SERVICE FACTOR 65.3 81.4 73.1 15.

UNIT AVAILABILITY FACTOR 65.3 81.4 73.1 i

16.

UNIT CAPACITY FACTOR (Using Net 57.4 74.0 64.6 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 56.3 72.7 63.5 18.

UNIT FORCED OUTAGE RATE 34.7 18.6 24.3 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - May 3, 1976 - 5 weeks 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAL X 100 110URS IN REPORTING PERIOD REACTOR AVAIIABILI'lY FACTOR = HOURS REACTOR WAS AVAIIAfiLE TO OPERATE X 100 110URS IN RITORTING PERIOD UNIT SERVICE TACTOR

= HotTS CENERATOR ON LINE X 300 HOURS 1h REPORTING PERIOD UNIT AVAILABILITY FACTOR = UOURS UNIT WAS AVA11 ADLE TO CENERATE X 100 HOURS IN REPokTING PERIOD 3912180 &

= NET ELECTRICAL POWER GENERATED UNIT CAPACITY FACTOR (Net Capability or Design (Mwe-Kct)) X 1100RS IN RC1'to.T* Nb PERIOD UNIT FORCED OUTACE RATE r FonCED OUTAGE HOURS X 100 HOURS GENEPATOR ON I.TNE + FORCED OUTAGE HOURS

~-

, -,. ~..

DOCKET NO. 50-270 UNIT oconee Unit 2 03/09/76 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH February 1976 AVERAGE DAILY POWER LEVEL AVERAG3 DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 841 17 2

840 18 840 19 3

4 841 20 5

841 21 6

839 22 7

840 23 "51 8

836 24 701

~

9 834 25 767 10 835 26 788 11 836 27 41 12 835 28 13 786 29 639 14 m

30 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electricai rating of the unit. there may be occa2 ions when the daily av: rage power level exceeds the 1007c line (or the restricted power lesel line). In such c.ises, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 03/09/76 DATE REPORT MONTil February 1976 TYPE METHOD Of F FORCED DURATION SHUTTING DOWN NO.

OnTE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 3

760214 F

201.08 A

1 Reactor shutdown for replacement of reactor coolant pump seals and a control rod drive stator.

4 760227 F

40.12 A

1 Replaced control rod drive stator.

(1) REASON (2) METilOD A EQUIPMENT l-ALLURE IEXPLAIN) 1 -M ANilAL B-MAINT. OR TEST.

2-M ANUAL l

C-RLI'ULLING SCR AM D-RtGULAlORY RESTRICTION 1-A UTOM ATIC i

L-OPFR ATOR TRAINING AND SCRAM LICI NSE EXAMINA110N i

F-ADMINIS1 R AllVE G-OPE R ATION Al. I:R ROR (i.XPL AIN) 11 -OillLR ILXPl.AIN) s

SUMMARY

Unit was base-loaded during the month, i.