ML19317E474

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1975
ML19317E474
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/07/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19317E469 List:
References
NUDOCS 7912180722
Download: ML19317E474 (3)


Text

- -

-3 UNIT Oconee Unit 2 O)

(

DATE 5/7/75 DOCKET NO.

OPERATING STATUS

1. REPORTING PERIOD: April 1. 1975 TliROUGH Aoril 30. 1975 HOURS IN REPORTING PERIOD: 720 MAX. DEPENDABLE C AP ACITY ( MWe. NET, M
2. CURRENTLY AUTHORIZED POWER LEVEL (MWthi None
3. LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (IF ANYt t MWe NET):
4. REASONS FOR RESTPICTION (IF ANY):

THIS CUMULATIVE REPORTING Pl RIOD YR TO DATE TO DATE 604.8 1644.1 3590.2

5. HOURS REACTOR WAS CRITICAL.

0 0 0

6. REACTOR RESERVE SHUTDOWN HOLRS
7. HOURS GENERATOR ON LINE . .

592.5 _1564.6 3440.0 8.

0 0 0 UNIT RESERVE SHUTDOWN HOURS .

9. GROSS T HERMAL ENERGY GENERATED (MWH) 1397342 3641072 7947969
10. GROSS ELECTRICAL ENERGY GENER ATED (MWH) 482170 1252850 2721826
11. NET ELECTRICAL ENERGY GENERATED gg,g, ,

459202 1183550 2571076 84.0 57.1 63.9

12. REACTOR AVAILABILITY F ACTOR (1) 82.3 54.4 61.3
13. UNIT AVAILABILITY F ACTOR (2) .

73.2 47.2 52.6

14. UNIT CAPACITY F ACTOR (36 . .

UNIT FORCED OUTAGE RATE (4) .

17.7 45.3 38.5 15.

16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIM ATED DATE 01 STARTCP:
18. UNITS IN TEST STATLS (PRIOR TO COMMERCIAL OPERATION) RE PORT THE FOLLOWING:

DATE LAST DkTE FORECAST ACH'IEVED INITIA L CRITICALITY INITIAL ELECTRIC AL POWER GENE RATION COMMERCIAL OPE R ATlON (1) REACTOR AVAILABILITY F ACTOR X 100 O

(2) UNIT AVAILABILITY FACTOR = X l00 S O .

NFT EllT TRIC tL POwF R t;F NE R ATF D

=

(3) UNIT CAPACITY FACTOR MAX. DLPENDABLL CAPAt'lii (Mwe-NET) X HOURS IN REPORTING PLRIOD (4) UNIT FORCED OUTAGE R ATE OLRS 1 TR LINE + FORCED OCT 4GE HOURS

    • 21807??

DOCKET NO. 50-270 UNIT oc nee Unit 2 DATE 5/7/75 AVERAGE DAILY UNIT POWER LEVEL MONTH April, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

465 17 853 1

18 854 2

19 851 3 _.

20 849 4 -

21 845 5 -

22 844 6

495 23 335 7

673 24 842 8

838 25 800 9

846 26 635 10 850 27 635 11 851 28 589 12 850 29 700 13 652 30 645 14 15 852 31 _

tt; '852 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be measions when the daily average power level exceeds the 100'"o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

1 1

DdCKET NO. 50-270 -

UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli _ May 7,1975 RiiPORT MONTil April, 1975 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) R EASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS )

7 750401 F 127.52 A 1 Excessive packing leakage on valves RC-1 and RC-3 (1) REASON (2) METHOD A -EQUIPMENT l ALLURE (EXPLAIN) 1-MANUAL B - M AINT. OR TEST. 2-MANUAL C- RLi'UE LING SCRAM

-/

D-P .GLLATORY RESTRICTION 3-AUTOM ATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION

, F- A DMINIST R ATiVE G-OPERAllONAL ERROR (EXPLAIN)

II-OlllLR (EXPLAIN)

SUMMARY

- -