- 3nte Unit 2 UNIT DATE 11/10/77 DOCKET NO. 50-270.
PREPARED BY J. A. Reavis OPERATING STATUS October 1 October 31, 1977 1.
PIPORTING PERIOD:
THROUGH 745 GROSS HOURS IN REPORTING PERIOD:
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2368 NET CAPABILITY (MWe-Net):
860 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
REASONS FOR RESTRICTION (IF ANY) s Month Year to Date hlathe 5.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 265.9 4.372.7 18,599.7 6.
REACTOR RESERVE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 248.0 4,264.4 18,029.9 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED (MWH)415,194 10,217,804 42,979,066 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 138,. 1 3,459,480 14,615,086 11.
NET ELECTRICAL ENERGY GENERATED 124,827 3,279,017 13,863,140 (MWH) 12.
REACTOR SERVICE FACTOR 35.7 59.9 67.5 13.
REACTOR AVAILABILITY FACTOR 33.3 58.7 65.8 14.
UNIT SERVICE FACTOR 33.3 58.5 65.4 15.
UNIT AVILABILITY FACTOR 33.3 58.5 65.4 16.
UNIT CAPACITY FACTOR (Using Net 19.5 52.3 58.5 Capability) 17.
UNIT CAPACITY FACTOR 18.9 50.7 56.7 (Using Design Mwe) 18.
UNIT FORCED OUTAGE RATE 66.7 17.4 23.6 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
None 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI,X 100 IIOURS IN REPORTING PERIOD REACTOR AVA11ABILI'lY FACTOR = HOURS REACTOR L'AS AVA11ALLE TO OPERATE X 100 ll0URS IN RLFORTING PERIOD UNIT SERVICE TACTOR
= HOPPS CEMERATOR ON LINE X 300 HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = HOURS UNIT k'AS AVATIABLE _TO CENERATE X 100 II 00 HOURS IN REPORTING PER10 91% 17 UNIT CAPACITY FACTOR
= NET ELECTRICAL P0kER GENERATE
[Not Capability or Design (Mwe-Nt L F.1 X 110URS INREP0KTf5b PERIOD UNIT FORCED OUTACE RATE e FORCED OCTAGE HOURS X 100 HOURS GENEPaTOR ON I.INE + FORCED OUTAGE HOURS
50-270 D CKET NO.
UNIT SHUTDOWNS UNil N AMli _Dconee Uni t 7 DATii 11/10/77 REPORT MONTil October.1977 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDU LED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS 10 77/10/0 F
497.00 A
1 Shutdown to investigate indicated tube leik in "2B" steam generator.
(1) REASON (2) METilOD A -EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B-M AINT. OR TEST.
2-MANUAL C-REl~ULLING SCit AM D-REGULA10RY RESTRICTION 3 - A U TOM AllC E-OPER ATOR TRAINING AND SCR AM I
LICENSE EXAMINATION F-ADMINIST R AllVE G-OPI' R ATION A L l' R ROR (I XPI AINI II-OlllLR ILXPLAIN)
SUMMARY
One major outage this month.
50-270 DOCKET NO.
UNIT oconee Unit 2 DATE 11/10/77 AVERAGE DAILY UNIT POWER LEVEL MONTH October,1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 533 1
37 2
516 18 501 3
19 507 4
g 510 5
6 569 22 457 7
g 8
24 9
25 10 26 11 27 12 28 nA 527 13 29 14 30 556 15 31 556 16 DAILY UNIT POWER LEVEL FORM INSTRtR'TIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usins maximum dependable capacity for the net eleeira::! ratmg of the unit. there may be incasions when the daily average power level exceeds the 100'" line (or the restricted power lesel Ime). In such c.ises, the l
average daily unit power output sheet should be footnoted to explain the apparent anomaly.
. - -