._

onsa Unit 1 UNIT DATE 11/10/77 DOCKET NO. 50-269 PREPARED BY J. A. Reavis OPERATING STATUS 1.

REPORTING PERIOD: October i THROUGH October 31, 1977 GROSS HOURS IN REPORTING PERIOD:

745 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

860 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY) hits Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 407.2 4,242.6 26,358.4

~

~

~

6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 327.0 4,104.7 24.068.7 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 445,631 9,325,537 55,711,248 10.

GROSS ELECTRICAL ENERGY GENERATED 123,670 3,189,300 19,312,730 (MWH) 11.

NET ELECTRICAL ENERGY GENERATED 103,632 3,001,103 18,233,636 (MWH) 12.

REACTOR SERVICE FACTOR 54.7 58.2 70.0 13.

REACTOR AVAILABILITY FACTOR 43.9 58.1 66.3 14.

UNIT SERVICE FACTOR 43.9 56.3 63.9 15.

UNIT AVILABILITY FACTOR 43.9 56.3 64.0 16.

UNIT CAPACITY FACTOR (Using Net 16.2 47.8 56.3 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 15.7 46.4 54.6 18.

UNIT FORCED OUTAGE RATE 2.7 25.8 19.2 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

None 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF ST/RTUP:

3EACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA1. X 100 1100RS IN REPORTING PERIOD REACTOR AVAII.ABILI1Y FACTOR = HOURS REACTOR L'AS AVAIIAELE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE TACTOR

= HOUPS CD:ERATOR ON LINE HOURS IN REPORTING PERIOD UNIT AVAI1 ABILITY FACTOR = Il0URS UNIT WAS AVATIABLE TO GENERATE X 100 HOURS IN RErokTING PERIOD UNIT CAPACITY FACTOR - = NET ELECTRICAL POWER GENERATED (Not Capability or Design (We-Net).1 X ll0URS IN REP 0KTfNb.

PERIOD TQte170

. UNIT FORCED OUTAGE RATE - FOPCrD OUTAGE Il0URS HOURS GENEPaTOR ON 1.7NE + FOTtCT.D OurAGE HOURS

50-269 DOCKl'T No.

UNIT SHUTDOWNS UNil NAMii 11/10/77 DATI!

U' REPORT MONTil TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (O THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 15 77/10/0:

S 87.40 B

4 Continuation of outage for steam generato r maintenance.

16 77/10/04 S

236.60 B

4 Outage continued to correct reactor coola it pump sect leakage.

17 77/10/1o S

85.05 B

4 Zero power physics testing 18 77/10/1H F

8.91 A

3 1.oss of "A" feedwater pump caused trip.

(1) REASON (21 MET 1IOD A -EQUIPMENT F ALLURE (EXPLAIN) 1 - M ANilAl B-MAINT. OR TEST.

2-MANUAL C-RLI ULLING SCRAM D-REGULATORY RFSTRICTION 3-Atf TOM ATIC F.-OPER ATOR TRAINING AND SCRAM LICI.NSE EXAMINATION 4-Other F-ADMINIST R AllVE G-OPE R ATION AL I R ROR 11XPLAIN)

Il-Ollll R IL XPLAIN)

SUMMARY

One major outage this month.

0-269 DOCKET NO.

UNIT oconee Unit 1 11-10-77 DATE AVERAGE DAILY UN!T POWER LEVEL MONTH October,1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 37 61 2

18 293 3

19 309 4

20 287 5

21 217 6

22 208 7

23 212 8

y 286 9

25 290 10 26

~

296 11 27 318 12 28 579 13 29 625 14 y

627 15 31 16 DAILY UNir POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may De.seasions when the daily average power level exceeds the 100'i line f or the restricted power lesel kne). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent aramaly.

.