- q UN.
Oconse Unit 2 V
DATE 9/12/ 77 DOCKET NO. 50-270 i
PREPARED BY J. A. Reavis OPERATING STATUS l
1.
REPORTING PERIOD:
January
_ THROUGH August, 1977 GROSS HOURS IN REPORTING PERIOD:
744.00 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
860 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative l
S.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 131.76 3680.43 17907.46 6.
REACTOR RESEP.VE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 80.42 3619.89 17385.43 8.
UNIT RESERVE SHUTDOWN HOURS I
9.
GROSS THERMAL ENERGY GENERATED (MWH)105199 8969716 41730978 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 31190 3038760 14194366 i
11.
NET ELECTRICAL ENERGY GENERATED 4
(MWH) 17514 2891656 13475779 12.
REACTOR SERVICE FACTOR 17.71 63.12 68.58 1
13.
REACTOR AVAILABILITY FACTOR 10.81 62.20 67.01 t
]
14.
UNIT SERVICE FACTOR 10.81 62.08 66.58 15.
UNIT AVILABILITY FACTOR 10.81 62.08 66.58 I
16.
UNIT CAPACITY FACTOR (Using Net 2.74 57.66 60.01 Capability) 17.
UNIT CAPACITY FACTOR j
(Using Design Mwe) 2.65 55.91 58.18' 18.
UNIT FORCED OUTAGE RATE O
2.26 21.52 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICA1. X 100 i
HOURS IN REPORTING PERIOD I
{
REACTOR AVA11ABIL11Y FACTOR = HOURS REACTOR L'AS AVAILAtl.E TO OPERATE X 100 110URS IN RI.y0RTING PERIOD UNIT SERVICE TACTOR
= Hours CrEERATOR ON 1.1NE 0
HOURS IN REPORTING PERIOD UNIT. AVAILABILITY FACTOR = 110URS UNIT _ WAS AVA11ABLE TO CENERATE X 100 HOURS IN REPORTING Pr.R10D 7912170-j UNIT CAPACITY FACTOR
= NET ELECTRICAL P0hER GENERATED
[NitCapabilityorl>csinn(Mwe-Net).1X-Il0URSINREP0KTfMh.
PERIOD UNIT FORCID OUTACE RATE e FORCED OUTAGE 110DR9 X 100 HOURS GENEPATOR ON 1.INE + FORCED OUTAGE HOURS L
D CKET NO.
50-270 Oconee Unit 2 UNIT SHUTDOWNS UNIT NAME 9-12-77 DATI..
REPORT MONTil August, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
DATE S SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS 3
77-08-0 L S
663.58 A
1 Steam Generatcr Maintenance Control rod drive stator failure.
(I) REASON (2) METHOD A -EQUIPMENT F ALLURE (EXPLAIN)
I-MANUAL B-MAINT. OR TEST.
2-MANUAL C-REI L'LLING
~
SCRAM 1
I D-REGULA10RY RESTRICTION 3-A UTOM ATK E-OPERATOR TRAINING AND SCRAM LK ENSE EXAMINAllON 4-Other F-ADMINISTR A TIVE G-OFER ATION AL ERROR (LXPLAIN) li-0 Tile R IEXPLAIN)
MM4 MARY:
One major outage this month.
l DOCKET NO. 50-270 UNIT Oconee Unit 2 DATE 9/12/77 AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 17 2
18 3
19 4
3 5
21 6
22 7
23 8
24 9
25 10 26 11 27 12 28 30 301 13 29 14 30 300 540 15 31 16 DAILY UNrf POWER LEVEL FORM INSTRU('TIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usins maximum dependable capacity for the net electrical ratm; of the unit. there inay be..(casions when the daily average power level exceeds the IUO',7c line tot the restricted power lesel hnet in such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.