ML19317E406
| ML19317E406 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/12/1977 |
| From: | Reavis J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317E402 | List: |
| References | |
| NUDOCS 7912170592 | |
| Download: ML19317E406 (3) | |
Text
/3 UN Ocones Unit 1
.U*
DATE 9/12/77 DOCKET NO.
50-269 PREPARED BY J. A.
Reavis OPERATING STATUS 1.
REPORTING PERIOD:
January THROUGH August, 1977 GROSS HOL'RS IN REPORTING PERIOD:
744.00 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
860 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
PIASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative 5.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 111.13 3835.41 25951.21 6.
REACTOR RESERVE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 110.08 3777.64 23741.63 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED (MWH) 231648 8879906 55265617 10.
GRO.ed ELECTRICAL ENERGY GENERATED (MLH) 79940 3065630 19189060 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 71946 2902166 18134699 12.
REACTOR SERVICE FACTOR 14.94 65.78 71.70 13.
REACTOR AVAILABILITY FACTOR 14.80 67.03 68.05 14.
UNIT SERV 1CE FACTOR 14.80 64.79 65.60 15.
UNIT AVILABILITY FACTOR 14.80 64.79 65.68 16.
UNIT CAPACITY FACTOR (Using Net 11.24 57.87 58.26 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 10.90 56.11 56.49 18.
UNIT FORCED OUTAGE RATE O
27.31 29.41 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
September 23, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI. X 100 HOURS IN REPORTING PERIOD REACTOR AVAILABILI'lY FACTOR = HOURS REACTOR L'AS AVI,ILABLP TO OPERATE Il0URS IN REPORTING PEkl0D UNIT SERVICE FACTOR
= H0lfPS CD:ERATOR ON LINE 00 HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110URS UNIT WAS AVA11AELE TO GENERATE X 100 HOURS IN REPORTING PERIOD UNIT CAPACITY FACTOR
= NET ELECTRICAL POWER GENERATED KTfNb
[f t C. pability or Desir,n w Nt u
UNIT FORCED OUTACE RATE - FORCED OUTAGE Il0URS X 100 HOURS GENERATOR ON 1.INE + FORCED OUTAGE HOURS
DOCKET NO. 50-269 oconee Unit 1 UNIT SHUTDOWNS UNIT NAME 9-12-77 D TE REPORT MONTil _ August, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
DATE S SCHEDULED (HOURS)
REASON (O THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS 14 77-08-05 S
633.92 C
1 Scheduled out for refueling.
(1) REASON (2) MFTIMMJ A -EQUIPMENT & AILURE (EXPLAIN) 1-MANUAL 8 - M AINT. OR TEST.
2-MANUAL I
C-REI'UELING SCR AM D-REGULA10RY RESTRICTION 3-AUTOM ATIC I
E-OPE 3ATOR TRAINING AND SCR AM LICENSE EXAMINAllON 4-Other F-ADMINIST R AllVE G-OPERAllONAL t RROR (EXPLAIN)
II-OillLR (EXPl.AIN)
SUMMARY
Refueling
DOCKET NO. sn vo UNIT oconee Unit 1 DATE 9/12/77 AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 719 17 707 2
18 702 3
19
~
687 4
20 327 5
21 6
22 7
23 8
24 9
25 10 N
11 27 12 28 13 29 14 30 15 31 16 DAILY UNir POWER LEVEL FORM INSTRU(~TIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
Compute to the neaiest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usingi maximum dependable capacity for the net electrical rating ol' the unit. there may be..t easions when the daily average power level exceeds the 1003 line (or the restricted power lesel hoe). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.