ML19317E392

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1976
ML19317E392
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/10/1976
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E388 List:
References
NUDOCS 7912170585
Download: ML19317E392 (3)


Text

. .

m -

. UNIT Oconsa Unit 2 DATE 11/10/76 g DOCKET NO. 50-270 PREPARED BY L. J. Bare OPERATING STATUS

1. REPORTING PERIOD: October 1 THROUGH October 31 1976 GROSS HOURS IN REPORTING PERIOD: 745.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net) : 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 739.4 4691.8 13250.8
6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON-LINE 735.00 4528.0 12807.5
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)l707921 10693873 30366301
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 583800 3597340 10342896
11. NET ELECTRICAL ENERGY GENERATED (MWH) 555838 3455843 9810994
12. REACTOR SERVICE FACTOR 99.2 64.1 70.4
13. REACTOR AVAILABILITY FACTOR 98.7 62.3 68.6
14. UNIT SERVICE FACTOR 98.7 61.9 68.1
15. UNIT AVAILABILITY FACTOR 98.7 61.9 68.1
16. UNIT CAPACITY FACTOR (Using Net 85.7 54.2 59.9 Capability)
17. UNIT CAPACITY FACTOR *

(Using Design Mwe) 84.1 53.2 58.8 ,_

18. UNIT FORCED OUTAGE RATE 1.4 23.8 24.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

l l

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP. i i

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRITICAT. '

Il0URS IN REPORTING PERIOD REACTOR AVAIL \ BILI'lY FACTOR = 1:Ot!RS RP\CTOR k'AS__ AVAIL \Bl.E TO OPERATE X 100 Il0URS IN REPORTING PER10J l

UNIT SERVICE TACTO:: = H01'P9 CE':ERATOR ON LINE l _

X 100 l HOURS IN REPORTING PERIOD UNIT AVAIL \BILITY FACTOR = 1101'RS ltNTT WAS AVAT1.\0LE TO CENERATE X 100 HOURS IN REPuk! LNG PF.R10D )

UNIT CAPACITY FACTOR $a NET ELECTRTCAL P0hi;R GENERATED -V (N. t C.apability or Design (P.we-kt)J X il0Uiu; LN RtPt>ht'd;C' 00 (

2170$(

l UNIT FORC C OUTACE RATE e OP D OUTAGE HOUns 79 l HCliRS GENE:tiTOR ON 1.INE + FORCED Cu RAGE HOURS "

, 3 DOCKET NO. 50-270 UNIT oconee Unit 2 DATE 11/10/76 AVERAGE DAILY UNIT POWER LEVEL October, 1976 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

583 1

824 17 826 18 785 2

6 820 3 39 805 805 4 20 824 5 21 824 22 719 6

820 23 832 7

819 24 832 8

767 25 833 9

- 34 832 10 26 829 11 27 811 28 824 12 466 29 821 13 461 30 823 14 477 31 850 15 184 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be otcasions when the ' daily average power level exceeds the IUO7e line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. S0-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 -

DATl! 11/10/76 REPORT MONTil October, 1976 TYPE METHOD OF F FOttCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS j 13 76-10-1 6 F 10.03 A 1 Low oil level indication on reactor coolant pump motor (1) REASON (2) METHOD A- EQUIPNENT l AILURE (EXPLAIN) 1-MANUAL B- MAINT. OR TEST. 2-MANUAL C- RLi'UE LING SCRAM ,

D-REGULATORY RESTRICTION 3- AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM l.ICENSE EXAMINATION F-ADMINISTRATIVE G-OPLRATION AL ERROR (LXPLAIN)

Il-OlllLR ILXPLAIN)

SUMMARY

No major outages this month.

.