Monthly Operating Rept for Oct 1976
ML19317E391
Person / Time
Site: Oconee 
Issue date: 11/10/1976
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E388 List:
References
NUDOCS 7912170584
Download: ML19317E391 (3)


Text

.

h UNIT Ocon n Unit 1 U

DATE 11/10/76 DOCKET NO. 50-269 PREPARED BY L. J. Bare OPERATING STATUS 1.

REPORTING PERIOD:

October 1 THROUGH October 31, 1976 GROSS HOURS IN REPORTING PERIOD:

745.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Nat) 4.

REASONS FOR RESTRICTION (IF ANY) s Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 726.1 4953.4 21725.5 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 718.6 4681.9 19612.7 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)1768878 11314532 45538674 10.

GROSS ELECTRICAL ENERGY GENERATED (sm) 608270 3941570 15836290 11.

NET ELECTRICAL ENERGY GENERATED 578451 3732253 14970902 (sm) 12.

REACTOR SERVICE FACTOR 97.5 67.7 75.2 13.

REACTOR AVAILABILITY FACTOR 96.5 65.2 69.0 14.

UNIT SERVICE FACTOR 96.5 64.00 67.9 15.

UNIT AVAILABILITY FACTOR 96.5 64.00 68.0 16.

UNIT CAPACITY FACTOR (Using Net 89.1 58.6 59.5 Capability) 17.

UNIT CAPACITY FACTOR 87.5 57.5 58.4*

(Using Design Mwe) 18.

UNIT FORCED OUTAGE RATE 3.6 3.8 14.0 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

Nov aber 13, 1976 REACTOR S EVICE FACTOR = HOURS REACTOR WAS CRITICAT.

, nn

~

HOURS IN REPORTING PERLOD REACTOR AVAILt3ILI1Y FACTOR = Hoi?FS REACTOR WAS AVAII Anl.E 'i0 OPE *UTE 00 Il0URS IN REFORTING PERIOD UNIT SERVICE FACT 0!!

= H0tT9 CD: ERAT 09 CN T.T NE NO HOURS IN REPORIING PERIOD UNIT AVAIL \\3II.ITY FACTOR = liOURS UNTT WAS AVATI AOI.E TO GrNERATE X 100 HOURS IN REPokTING PERIOD UNIT CAPACITY FACTCR

= NE T ELECTRICAI. POhER GT!,T.RATFD LN R: !S t. GL.00

-- Y 1

[N. t C.ipubility or Denia;n (!Ne-Net).1 X !!OUE PERIOD UNIT FORCQ OUTACE RATE = FORCED OUTAGE HOURS 1 40 HOURS GENERATOR ON !.INE FRE Or H

DOCKET NO.30-269 UNIT oconee Unit 1 DATE 11/10/76 AVERAGE DAILY UNIT POWER LEVEL MONTH October. 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 835 839 37 3

2 841 18 Ran 841 843 3

jg 837 842 4

20 840 843 5

21 6

839 22 9An 838 23 840 7

8 R1R 24 841 9

441 25 841 10 26 843

'620 11 27 274 802 829 28 759 12 838 29 832 13 837 833 30 14 329 31 199 15 837 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the iOO'o line (or the restricted power lese! line). In such c.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

DOCKET NO. 50-269 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 1 11/10/76 DATli RIiPORT MONTil October, 1976 TYPE METHOD OF FSORCED DURATION SHUTTING DOWN NO.

DATE S SCilEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS

,)

13 76-10-2:

F 10.51 A

3 Control rod drive power supply malfunction during scheduled test 14 76-10-31 F

15.92 A

1 Repair steam generator tube leaks (1) REASON (2) ME11tOD A -LQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.

2-MANUAL C-RLI'ULLING SCRAM 4

D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAIN!'K; AND SCRAM LICENSE EXAMINATION F-ADMINISTR ATIVE G OPLRAllONAL ERROR (LXPLAIN)

II-OlllLR (EXPLAIN)

SUMMARY

Investigation of steam generator tube leaks in progress at the end of the month.

.