CORRECTED COPY
')
i tiNIT Cconee III
~
.DATE 11/8/74 e.
Lgh.
f D
50-287
.sDOCKET NO-
- ATING STATUS
.L REPL1 TING PERIOD:
October 1, 1974 TilROUGH October 31, 1974 BOLL IN REPORTING PERIOD:
745 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWoo 2568 MAX. DEPENDAHLE CAPACITY IMWe NETi 1 14 WEST POWER LF5'% TO WHICH SPECIFICALL) RESTRICTED (IF ANY) tMWe NET):
%"a 4,
REASONS FOR RESTRICTION (IF ANY):
~
'THIS CUMULATIVE REPORTING P! RIOD YR TO DATi TO DATE 350.58 489.98 489.98 1 HOURS REACTOR WAS CRITICAL.
6.
REACTOR RESERVE SHUTDOWN HOURS N/A 7.
HOURS GENER ATOR ON LIN E...............
284.35 355.65 355.65 1.
UNIT RESERVE SHUTDOWN HOURS...........
N/A 9.
GROSS THERMAL ENERGY CENERATED (MWH)
N/A 30.
GROSS ELECTRICAL ENEtGY CENERATED (MWH)
........!I.
70181-76949 76949 11.
NET ELECTRICAL ENERGY GENERATED N/A C4".'!!)
12' REACTOR AVAILABILITY FACTOR (1)
N/A 13.
UNIT AVAILABILITY F ACTOR (2)
N/A 14 UNIT CAPACITY FACTOR (3)
N/A 15.
UNIT FORCED OUTAGE RATE (4)....
N/A 16.
SHUTDOWNS SC!lEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DURATION OF EACH):
.17.
IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE 01 STARTUP:
- 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLO41SG:
DATE LAST DkTE FORECAST ACH'IEVED
--INITIAL CRITICALITY 9/5/74
' INITIAL ELECTRICAL FOWER GENERATION 9/13[74 12/1/74 COMMERCIAL OPERATION (1)
REACTOR AVAILABILITY FACTOR
- X 100 HOURS IN REPORTING P1 RIOD
~
HOURS GENERATOR ON LINF (2)
UNIT AVAILABILITY FACTOR
=
HOURS IN REPORTISC PI RIOD NET EllTTRIC AL POWFR GFNFR ATFD UNIT CAPACITY FACTOR (3)
MAX. DLl'ENDAULL CAPAlli) tMWe NLT).X HOUR 5 IN RtrORTING PERIOD FORCED OUTAGE IIOURS (4)
UNIT FORCED OUTAGE RATE HOURS GENERATOR ON LihE + FORCFDOUTAGE HOURS l
- tay f.