J Oconee Unit 1 l
p CORRECTEDCOPY 1
UNIT 11/8/74 DATE 50-269 DOCKET NO.
OPERATING STATUS 1.
REPORTING PERIOD:
October 1, 1974 TilROdCH October 31, 1974 HOURS IN REPORTING PERIOD:
745 2.
CURRENTLY AUTHORIZED POWER LLVEL (MWmi 2568 MAX. DEPESDAllLE cal'ACITY t\\twe NET.
871 None 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (IF ANY)IMWe NET):
4.
REASONS FOR RESTRICTION (!F ANY1:
THIS CUMULATIVE REPORTING Pl RIOD YR TO DATE TO D ATE 383.1 5446.6 9800.5 _
S.
HOURS REACTOR WAS CRITICAL.
6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
367.1.
5291.7 8280.8 7.
HOURS GENERATOR ON LINE..
8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (M% H) 690694 12226629 18237510 10.
GROSS ELECTRICAL ENERGY GENER ATED (MWH) 7.'. 37472 4230112 6318700 11.
NET ELECTRICAL LNERGY GENER ATED 209A87 4000606 5939684 (MWH) 51.4 74.7 86.3 12.
REACTOR AVAILABILITY F ACTOR (1)
.5 72.9 13.
UNIT AVAILABILITY F ACTOR (2) 32.3 62.9 60.3 14.
UNIT CAPACITY F ACTOR (3) 19.8 7.0 7.7 IS.
UNIT l'ORCED OUTAGE RATE (4)..
16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DURATION OF EACH):
17.
IF SHUT DOWN AT END OF REPORT PER!OD. ESTIMATED DATE 01 STARTUP:
December 1, 1974 18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) RE PORT TIIE FOLLOwlNG:
DATE LAST 6kTE FORECAST ACH'IEVED INITIAL CRITICALITY INITIAL E LEL'TRICAL POWER GENERATION COMMERCIAL OPl: RATION (1)
REACTOR AVAILABILITY FACTOR =
X 100 X 100 (2)
UNIT AVAILABILITY FACTOR
=
p NET ELIT TRIC AL POWFR GFNFR ATFD
('3)
UNITCAPACITY FACTOR
=
MAX. DLPENDAttLt.L AP.Wif) (MWe SLT) A tIOURh IN RLFOR flNG PLKIOD (4)
UNIT FORCED OUTAGl'. R ATE R
=
M + FORLk D OU T 4GE HOURS 50 0
. -. -