Revised Monthly Operating Rept for Oct 1974
ML19317E349
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/08/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E342 List:
References
NUDOCS 7912170550
Download: ML19317E349 (1)


Text

_ - _

~

J Oconee Unit 1 l

p CORRECTEDCOPY 1

UNIT 11/8/74 DATE 50-269 DOCKET NO.

OPERATING STATUS 1.

REPORTING PERIOD:

October 1, 1974 TilROdCH October 31, 1974 HOURS IN REPORTING PERIOD:

745 2.

CURRENTLY AUTHORIZED POWER LLVEL (MWmi 2568 MAX. DEPESDAllLE cal'ACITY t\\twe NET.

871 None 3.

LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (IF ANY)IMWe NET):

4.

REASONS FOR RESTRICTION (!F ANY1:

THIS CUMULATIVE REPORTING Pl RIOD YR TO DATE TO D ATE 383.1 5446.6 9800.5 _

S.

HOURS REACTOR WAS CRITICAL.

6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

367.1.

5291.7 8280.8 7.

HOURS GENERATOR ON LINE..

8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (M% H) 690694 12226629 18237510 10.

GROSS ELECTRICAL ENERGY GENER ATED (MWH) 7.'. 37472 4230112 6318700 11.

NET ELECTRICAL LNERGY GENER ATED 209A87 4000606 5939684 (MWH) 51.4 74.7 86.3 12.

REACTOR AVAILABILITY F ACTOR (1)

.5 72.9 13.

UNIT AVAILABILITY F ACTOR (2) 32.3 62.9 60.3 14.

UNIT CAPACITY F ACTOR (3) 19.8 7.0 7.7 IS.

UNIT l'ORCED OUTAGE RATE (4)..

16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DURATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PER!OD. ESTIMATED DATE 01 STARTUP:

December 1, 1974 18.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) RE PORT TIIE FOLLOwlNG:

DATE LAST 6kTE FORECAST ACH'IEVED INITIAL CRITICALITY INITIAL E LEL'TRICAL POWER GENERATION COMMERCIAL OPl: RATION (1)

REACTOR AVAILABILITY FACTOR =

X 100 X 100 (2)

UNIT AVAILABILITY FACTOR

=

p NET ELIT TRIC AL POWFR GFNFR ATFD

('3)

UNITCAPACITY FACTOR

=

MAX. DLPENDAttLt.L AP.Wif) (MWe SLT) A tIOURh IN RLFOR flNG PLKIOD (4)

UNIT FORCED OUTAGl'. R ATE R

=

M + FORLk D OU T 4GE HOURS 50 0

. -. -