ML19317E054
| ML19317E054 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/22/1972 |
| From: | Murphy C US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James Keppler US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19317E052 | List: |
| References | |
| NUDOCS 7912110828 | |
| Download: ML19317E054 (1) | |
Text
m --
=
e~
e
~
CONFIRMATION COPt 4
s '"
. UNITED STATES
' S (d ih ATOMIC ENERGY COMMISSION uLuxxxxx m wouCDC x,,
l.
l j
mEcio i. - suit E eia 273 P E AOMi siE E si R E ET. NORT H W EST AT L ANT A GECR3t A 30303 DIRECTORATE OF REGULATORY OPERATIONS September 22, 1972 J. G. Keppler, Chief, Reactor Testing and Operations Branch (2)
Directorate of Regulatory Operations, Headquarters RO INQUIRY REPORT NO. 50-269/72-9 DUKE POWER COMPANY (OCONEE UNIT 1), LICENSE NO. CPPR-33, DOCKET No. 50-269, DESIGN CHANGE - PRESSURIZATION OF FUEL The attached Inquiry Report is forwarded for information.
The licensee has stated that 97 assemblies will be returned to B&W for pressurization starting next week. They will return 2-4 assemblies per day.
The licensee has stated that they do not intend to report this matter.
They do not feel it falls within the scope of 10 CFR 50.55(e).
.w
- C. E. Mur *y Actddg Chief RO:II:CEM Reactor Test and Startup Branch
Enclosure:
RO Inquiry Rpt. No. 50-269/72,
(Murphy)
]
cc w/ enc 1:
J. B. Henderson,.RO
~
RO:HQ (5)
DR Central Files.
i Regulatory Standards (3) j Directorate of Licensing (13) l PDF.
Local PDR
'NSIC
~
DTIE, OR State-j TRANSMITIED VIA MAG CARD 3:59 p.m., kk,.9/22/72-3912110825
. -