Responds to Telcon Re Resolution of Matls Delivery Problems Reported 730425 & 730622.States AEC Position Re Facility Completion
ML19317D561
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/21/1974
From: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
To: Thies A
DUKE POWER CO.
References
NUDOCS 7912060808
Download: ML19317D561 (2)


Text

.

DISTRIBUTION:

l AEgPDR Le al PDR sD6ckets (3)

LWR 2-3 Rdg M2] B74 VAMoore RCDeYon g Docket Nos. 50-269 DEisenhut 50-270 IAPeltier and 50-287 EIGoulbourne ACRS (16)

R0 (3)

{

llWilchins Duke Power Company RWKlecker ATTN Mr. Austin C. Thics ASchwencer Senior Vice President.

Production & Transmission 422 South Church Street P. O. box 2178 Charlotte, N. C.

28201 Centle:nen It is our understanding that because of caterials delivery problems, the high energy-line break redifications, described in your April 25, 1973 report and its June 22, 1973 supplement, have not been cocpleted on Oconce Units 1 and 2.

You have kept us inforned with regard to the status of materials, particularly the acquisition of critical valves for the emergency feedwater bypass piping.

Recently, you informed us by phone that you were abic to requisition two of the required feedvater bypass valves from two of your other plants, indicating that modification to two Oconce plants can now be completed.

The purpose of this letter is to state our position with regard to the cocpletion of the three Oconec Units.

Unit i nodifications should be completed as soon as practical and prior to startup following the next unit shutdown for maintenance.

Unit 2 modifications should be completed prior to startup following the currrat shutdown for pump and internals inspection.

Unit 3 codifications should be completed, as originally scheduled, prior to unit startup which is interpreted to mean prior to proceeding abova 5: full power.

N g

a 6I ll LWR.1 3

.L.:C. Mg.2 3. L: /L s 2.

omer,

$URNAMr>

.I.A.P.e.l.

W....M.. h ncer _.A re--

0 om > c3L.1D...D.4... 3L}\\

DL.3L1l..Dh.

t.

,_. oc... #...,y oc ou.

....g.........,,,,,,,,,,,,,_,,,,...,.,,,

e 7912000

I 2-WAA21 gg Austin C. Thies Please advise us if for some practical reason you cannot comply with this position.

Sincerely, Voss A. Moors, Assistant Director f

for Light Water Reactors, Group 2 Directorate of Licensing ces Williaan L. Porter Duke Power Company 422 South Church Street P. O. Box 2178 Charlotte, N. C.

28201

omer, summaesc >

..L.

DATE >

Fors= AEC-3Le (Rev.9 53) AECM 0240 m

t. eevaeaes=1 eaaa1eae er7eca I#7 8 44-M6 p,;

i