UNITED STATES
ff g[h .
g
g,
NUCLEAR REGULATORY COMMISSION
,g,
,
{ f . 9.([ g
REGloN 11
'
-
"A
E
101 M ARIETTA STREET, N.W.
,D
.-*
b
8
ATLANTA, GEORGI A 30303
e, .
e% .....*'s
SEP 191578
.
.
"
In Reply Refer To:
~ ~'~~'{f$j ' b4,gS;/)
RII:NE
t
8 L1&-1L
y
50-287/78-14
Duke Power Co=pany
ATTN:
Mr. William O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentle =en:
Thank you for your letter Septe=ber 1, 1978, infor=ing us of steps
you have taken to correct the ite= of noncompliance concerning
activities under NP,C Operating License No. DPR-55 brought to your
attention in our letter of August 10, 1978. We vill exa=ine your
corrective actions and plans during subsequent inspections.
-
We appreciate your cooperation with us.
Sincerely,
-y
.
-
Charles E. Murphy, A ief
Reactor Construction and Engineering
Support Branch
cc:
Mr. J. E. S=tth, Station Manager
Oconee Nucicar Plant
-
P. O. Box 1175
Seneca, South Carolina
29678
7911270 T7
J 9
.
- -
.
i
.
-.
A.
DUKE PowEn COMP.OTY
Powro Brit.pixo
i
422 Sorrn Curucu Srnrrr, CilAR1.oTTE, N. C. 2e242
w l .Lt A W O paasta,g R.
40f #et t+0 ta t
'E.Ce=0ht aeta704
s.t.
acco 0 ,o-
272-40 2
i
'
September 1, 1978
1
!
Mr. Janes P. O'Reilly, Director
U. S. Nuclear Regulatory Com=ission
Region II
101 Marietta Stree.t, Suite 3100
l
Atlanta, Georgia 30303
i
Re: R11:NE
50-270/78-14
'
50-287/78-14
Dear !ir. O'Reilly:
l
k'ith regard to Mr. C. E. Murphy's letter of August 10, 1978, which
transmitted IE Inspection Report 50-270/78-14, 50-287/78-14, Duke
,
-
Power Company does not consider the information to be proprietary.
,
,
Please find attached a response to the item of non-compliance.
Ve y truly yours,
'; ,
~~' O . /n
F.
,
I
k'illiam O. Parker, Jr Q
F1G:vr
Attachment
4
,
!
i
,
_
.
-
. . _ . _ . .
.- . , - ,
_
. .G,
.
-
DUKE POWER COMPANY
i
RESPONSE TO OIE INSPECTION REPORT
'
50-270/78-14, 50-287/78-14
Item
f
Based on the results of the NRC inspection conducted on June 26-20, 1978, it
appears that certain of your activities were not conducted in full co=pliance
with NRC regulations and License Conditions as indicated below. These items
have been categorized as described in our correspondence to you dated
December 31, 1974.
Criterion V, of Appendix B to 10CFR50 as implemented by commit-
'
ments set forth in the DPC Topical Report, Duke-1-A, Section
17, Paragraph 17.1.5 specifies in part that activities affecting
quality shall be accomplished in accordance with the require-
ments i= posed by instructions, procedures and drawings.
Oconee
Nuclear Station Directive 3.6.l(M), " Welding Program," paragraph
7.2.5.1 specifies that, "all material shall be consu=ed in the
weld process or shall be returned to the issue station..."
,
Contrary to the above requirement on June 27, 1978, the inspector
observed a substantial quantity of bare wire stainless steel
electrodes scattered on the floor of the low pressure cooler room.
Welding had been performed earlier in this area.
This is an infraction.
RESPONSE
The management of Oconee Nuclear Station has taken the following actions to
the immediate proble= with regard to welding material control and to
correct
prevent its recurrence in the future.
All personnel, including maintenance unit coordinators and supervisors,
'
quality assurance inspectors, welders and their immediate superviscrs have
been notified of the infraction and instructed to review Station Directive
'
3.6.1.
The appropriate personnel have been warned that disciplinary actions
will be taken for any future violation.
The actions that are considered te
be violations in this case have also been explained to these personnel.
_,
.
_
,
. _ _
1
,'
)
tb8 E80
UNIT ED sT ATEs
9
~ '[p
9[o
NUCLE AR REGULATORY COMMISSION
g
RE GloN il
2
g.(#
$
230 PE ACHTHEE STREET. N W sVITE 1217
/ e
0-
'"*
[
ATLANT A. GEORGI A 30303
o,x~p
InReplEReferTo:
AUG 10 SN
'
RII:NE
50-270/78-14
50-287/78-14
Duke Power Company
Attn:
Mr. William O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. N. Economos of this office on
June 26-29, 1978, of activities authorized by NRC Operating License Nos.
DPR-47 and DPR-55 for the Oconee 2 and 3 facilities, and to the discussion
of our findings held with Mr. J. E. Smith at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations. Section 2.201 requires you to submit
to this of fice, within 20 days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which
have been taken by you and the results achieved; (2) corrective steps which
will be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor)
.
.
.-
-
..
00927#
l
'
.
/ T.
ggG 101979 ~
Duke Power Company
-2-
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information from
public disclosure. Aay such application must include a full statement of
the reasons on the basis of which it is claimed that the information is
proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
?
i
-
,.
,
,
C. E. Murphy e.s
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-270/78-14
and 50-287/78-14