Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-270/78-14 & 50-287/78-14
ML19317D355
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/19/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19317D356 List:
References
NUDOCS 7911270574
Download: ML19317D355 (1)


See also: IR 05000270/1978014

Text

.

~.

T r,

s.

-*

"

//

a

g staGu

UNITED STATES

ff g[h .

g

g,

NUCLEAR REGULATORY COMMISSION

,g,

,

{ f . 9.([ g

REGloN 11

'

-

"A

E

101 M ARIETTA STREET, N.W.

,D

.-*

b

8

ATLANTA, GEORGI A 30303

e, .

e% .....*'s

SEP 191578

.

.

"

In Reply Refer To:

~ ~'~~'{f$j ' b4,gS;/)

RII:NE

t

8 L1&-1L

y

50-287/78-14

Duke Power Co=pany

ATTN:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentle =en:

Thank you for your letter Septe=ber 1, 1978, infor=ing us of steps

you have taken to correct the ite= of noncompliance concerning

activities under NP,C Operating License No. DPR-55 brought to your

attention in our letter of August 10, 1978. We vill exa=ine your

corrective actions and plans during subsequent inspections.

-

We appreciate your cooperation with us.

Sincerely,

-y

.

-

Charles E. Murphy, A ief

Reactor Construction and Engineering

Support Branch

cc:

Mr. J. E. S=tth, Station Manager

Oconee Nucicar Plant

-

P. O. Box 1175

Seneca, South Carolina

29678

7911270 T7

J 9

.

- -

.

i

.

-.

A.

DUKE PowEn COMP.OTY

Powro Brit.pixo

i

422 Sorrn Curucu Srnrrr, CilAR1.oTTE, N. C. 2e242

w l .Lt A W O paasta,g R.

40f #et t+0 ta t

'E.Ce=0ht aeta704

s.t.

acco 0 ,o-

272-40 2

i

'

September 1, 1978

1

!

Mr. Janes P. O'Reilly, Director

U. S. Nuclear Regulatory Com=ission

Region II

101 Marietta Stree.t, Suite 3100

l

Atlanta, Georgia 30303

i

Re: R11:NE

50-270/78-14

'

50-287/78-14

Dear !ir. O'Reilly:

l

k'ith regard to Mr. C. E. Murphy's letter of August 10, 1978, which

transmitted IE Inspection Report 50-270/78-14, 50-287/78-14, Duke

,

-

Power Company does not consider the information to be proprietary.

,

,

Please find attached a response to the item of non-compliance.

Ve y truly yours,

'; ,

~~' O . /n

F.

,

I

k'illiam O. Parker, Jr Q

F1G:vr

Attachment

4

,

!

i

,

_

.

-

. . _ . _ . .

.- . , - ,

_

. .G,

.

-

DUKE POWER COMPANY

i

RESPONSE TO OIE INSPECTION REPORT

'

50-270/78-14, 50-287/78-14

Item

f

Based on the results of the NRC inspection conducted on June 26-20, 1978, it

appears that certain of your activities were not conducted in full co=pliance

with NRC regulations and License Conditions as indicated below. These items

have been categorized as described in our correspondence to you dated

December 31, 1974.

Criterion V, of Appendix B to 10CFR50 as implemented by commit-

'

ments set forth in the DPC Topical Report, Duke-1-A, Section

17, Paragraph 17.1.5 specifies in part that activities affecting

quality shall be accomplished in accordance with the require-

ments i= posed by instructions, procedures and drawings.

Oconee

Nuclear Station Directive 3.6.l(M), " Welding Program," paragraph

7.2.5.1 specifies that, "all material shall be consu=ed in the

weld process or shall be returned to the issue station..."

,

Contrary to the above requirement on June 27, 1978, the inspector

observed a substantial quantity of bare wire stainless steel

electrodes scattered on the floor of the low pressure cooler room.

Welding had been performed earlier in this area.

This is an infraction.

RESPONSE

The management of Oconee Nuclear Station has taken the following actions to

the immediate proble= with regard to welding material control and to

correct

prevent its recurrence in the future.

All personnel, including maintenance unit coordinators and supervisors,

'

quality assurance inspectors, welders and their immediate superviscrs have

been notified of the infraction and instructed to review Station Directive

'

3.6.1.

The appropriate personnel have been warned that disciplinary actions

will be taken for any future violation.

The actions that are considered te

be violations in this case have also been explained to these personnel.

_,

.

_

,

. _ _

1

,'

)

tb8 E80

UNIT ED sT ATEs

9

~ '[p

9[o

NUCLE AR REGULATORY COMMISSION

g

RE GloN il

2

g.(#

$

230 PE ACHTHEE STREET. N W sVITE 1217

/ e

0-

'"*

[

ATLANT A. GEORGI A 30303

o,x~p

InReplEReferTo:

AUG 10 SN

'

RII:NE

50-270/78-14

50-287/78-14

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. N. Economos of this office on

June 26-29, 1978, of activities authorized by NRC Operating License Nos.

DPR-47 and DPR-55 for the Oconee 2 and 3 facilities, and to the discussion

of our findings held with Mr. J. E. Smith at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations. Section 2.201 requires you to submit

to this of fice, within 20 days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which

have been taken by you and the results achieved; (2) corrective steps which

will be taken to avoid further noncompliance; and (3) the date when full

compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor)

.

.

.-

-

..

00927#

l

'

.

/ T.

ggG 101979 ~

Duke Power Company

-2-

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information from

public disclosure. Aay such application must include a full statement of

the reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

?

i

-

,.

,

,

C. E. Murphy e.s

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-270/78-14

and 50-287/78-14

i

cc w/ enclosures:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

'

Seneca, South Carolina

29678

.

e-s wn en