Discusses Insp Rept 50-270/73-11 on 730828-31.No Noncompliance Noted
ML19317D319
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/07/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19317D320 List:
References
NUDOCS 7911270549
Download: ML19317D319 (4)


See also: IR 05000270/1973011

Text

r

,

,

UNITED STATES

?g

ATOMIC ENERGY COMMISSION

g

)<-

,

!j,'7

- o<

DIRECTORATE OF E3ULATCRY CPERATICUS

t

aEcion o - suit E sie

j

e,

230 P C ACMT R E E ST R E ET. NCRT MwCST

tr,qg on

,,

,gy g

g

Art.AsrA,cgoncea 30303

I

In Reply Refer To:

RO:II:FJ

50-270/73-11

1

Duke Power Company

ATTN:

Mr. A. C. Thies, Senior Vice President

Production and Transmission

Power Building

422 Scuth Church Street

Charlotte, North Carolina

28201

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office

on August 28-31, 1973, of activities authori::ed by AEC Construction

Permit No. CPPR-34 for the Oconee 2 facility, and to the discussion

of our findings held by Mr. F. Jape with Mr. J. W. Hampton at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were disclosed.

Two new unresolved items resulted from this inspection and are

identified in Section III of the summary of the enclosed repprt.

These items wf11 be examined on subsequent inspections.

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the AEC's

-

Public Document Room.

If this report contains any information that

'

you believe to be proprietary, it is necessary that you submit a written

application to this office requesting that such information be

withheld from public disclosure.

If no proprietary information is

i

.

identified, a written statement to that effect should be submitted.

If an application is submitted, it must fully identify the bases

.

.

qg n 270~5 N % H

._

_ _ . . _ _ .

~ ~~ ~ ~

.

.

.

o

T

.

t

Duko Pswer Compeny

-2-

'

,

g{p 7

g73

for which information is claimed to be proprietary. The

application should be prepared so that information sought to be

withheld is incorporated in a separate paper and referenced in the

application since the application will be placed in the Public

Document Room. Your application, or written statement, should be

submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed

i

in the Public Document Room.

Should you have any questions concerning this letter, we will be

glad to discuss them with you.

Very truly yours,

1l

,sanci..,

,- f.A~ - ' j,,

,~

Norman C. Moseley

Director

Enclosure:

RO Inspection Report No.

50-270/73-11

i

e

em

e

1

-

-

- . . _

-.

-

. -

.

_.

M

__

_

-.

. . .

i

.

'

7

.

\\j

j.

3112 76

Ltr to Duke Power Company fm N. C. Moseley

1973

'

'

DISTRIBUTION:

H. D. Thornburg, PO

RO:HQ (4)

Directorate of Licensing (4)

-m

" Central Files

h

'

  • PDR
  • NSIC
  • State

.

1

  • To be dispatched at a later date.

i

t

O

=

a

s

'

$

i

1

i

'

_

-

__

-.

- _

. . _

... - .

_

,

..

, . ,

--i

, , .

_ . _ ,

-

-_

-

av--

!

'

,

-

.

.

,

O("

!

-

-

.

Ii

Duke Power Coupany

SEP 7

5 73

i

Oconee Unit 2

I

RO Inspection Report No. 50-270/73-11

cc w/ enc 1:

H. D. Thornburg, RO

RO:HQ (5)

3

,M._ Central Files

Rs gulatory Standards (3)

Directorate of Licensing (13)

cc encl. only:

  • PDR
  • NSIC
  • State

,

  • To be dispatched at a later date.

4

1

i

.,

9

J

em

.

>

e

$

. - - - - -

.

.

,_ _

--

._.

aO6

-r

--

-

- - .

y

r--

. .-

-

r-

6

--

a

~ .

e -

w--

-