Text
r
,
,
UNITED STATES
?g
ATOMIC ENERGY COMMISSION
g
)<-
,
!j,'7
- o<
DIRECTORATE OF E3ULATCRY CPERATICUS
t
aEcion o - suit E sie
j
e,
230 P C ACMT R E E ST R E ET. NCRT MwCST
tr,qg on
,,
,gy g
g
Art.AsrA,cgoncea 30303
I
In Reply Refer To:
RO:II:FJ
50-270/73-11
1
Duke Power Company
ATTN:
Mr. A. C. Thies, Senior Vice President
Production and Transmission
Power Building
422 Scuth Church Street
Charlotte, North Carolina
28201
Gentlemen:
This refers to the inspection conducted by Mr. F. Jape of this office
on August 28-31, 1973, of activities authori::ed by AEC Construction
Permit No. CPPR-34 for the Oconee 2 facility, and to the discussion
of our findings held by Mr. F. Jape with Mr. J. W. Hampton at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed
in the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
Two new unresolved items resulted from this inspection and are
identified in Section III of the summary of the enclosed repprt.
These items wf11 be examined on subsequent inspections.
In accordance with Section 2.790 of the AEC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the AEC's
-
Public Document Room.
If this report contains any information that
'
you believe to be proprietary, it is necessary that you submit a written
application to this office requesting that such information be
withheld from public disclosure.
If no proprietary information is
i
.
identified, a written statement to that effect should be submitted.
If an application is submitted, it must fully identify the bases
.
.
qg n 270~5 N % H
._
_ _ . . _ _ .
~ ~~ ~ ~
.
.
.
o
T
.
t
Duko Pswer Compeny
-2-
'
,
g{p 7
g73
for which information is claimed to be proprietary. The
application should be prepared so that information sought to be
withheld is incorporated in a separate paper and referenced in the
application since the application will be placed in the Public
Document Room. Your application, or written statement, should be
submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed
i
in the Public Document Room.
Should you have any questions concerning this letter, we will be
glad to discuss them with you.
Very truly yours,
1l
,sanci..,
,- f.A~ - ' j,,
,~
Norman C. Moseley
Director
Enclosure:
RO Inspection Report No.
50-270/73-11
i
e
em
e
1
-
-
- . . _
-.
-
. -
.
_.
M
__
_
-.
. . .
i
.
'
7
.
\\j
j.
3112 76
Ltr to Duke Power Company fm N. C. Moseley
- SEP 7
1973
'
'
DISTRIBUTION:
H. D. Thornburg, PO
RO:HQ (4)
Directorate of Licensing (4)
-m
" Central Files
h
'
- PDR
- Local PDR
- NSIC
- DTIE, OR
- State
.
1
- To be dispatched at a later date.
i
t
O
=
a
s
'
$
i
1
i
'
_
-
__
-.
- _
. . _
... - .
_
,
..
, . ,
--i
, , .
_ . _ ,
-
-_
-
av--
!
'
,
-
.
.
,
O("
!
-
-
.
Ii
Duke Power Coupany
SEP 7
5 73
i
Oconee Unit 2
I
RO Inspection Report No. 50-270/73-11
cc w/ enc 1:
H. D. Thornburg, RO
RO:HQ (5)
3
,M._ Central Files
Rs gulatory Standards (3)
Directorate of Licensing (13)
cc encl. only:
- PDR
- Local PDR
- NSIC
- DTIE, OR
- State
,
- To be dispatched at a later date.
4
1
i
.,
9
J
em
.
>
e
$
. - - - - -
.
.
,_ _
--
._.
aO6
-r
--
-
- - .
y
r--
. .-
-
r-
6
--
a
~ .
e -
w--
-