o
'f" " %
hij> f RIBU ilOi:
{ g%.. fr,?,i
'Nnlet.Iile(3)
-E, UNiil D M Alf:S gggg j
'4 c
o, }s,A
[
NUCl F.AR RFBULATORY CC'/.'.UF90N p { g g.,y WASH;?r3TO?J D C. 20ss5 p
'+***
I'ay 23,1979 Docket No. :
50-269/270/287 Docketing and Service Section Office of the Secretary of the Commission
SUBJECT:
CCOMEE MUCl.ET.R STATIO", inITS GOS.1, 2 Ai'D 3 Two signed origint's of the Federal RegistqNotice identified botow are enctosed for your transm3tal ta the Office of the FedcralRegister for pubEcation. Ad+tionalconfermed copics (12 )of the Notke are enciosed for your use.
O flotice of Rece pt of Application for Ccnstiuction Permit (s) and Operating 1 iconse(s).
i O Notice of Rece'pt of Partial Apptication for Construction Permit (s) and Facilh Ucense(s): Time for Submission of Views on Antitrust fdatters.
O Notice of Availabilty of / pplicant's Envir onmental Report.
O Notice of Preposed issuance of Arnendment to Facil;ty Operating Ucence.
O Notice of ikcoipt of AppUcation for Facit:ty 1icense(s); Notice of Avaibbinty of App!icant's En.aonmental Report; and Notice of Consideration of lasuance of Faci!ity t.icence(s) and Notice of Oppodunity for Hearing.
O Notice of Availability of NRC Draft, Final Environmental Statement.
O Notice of Limited Work Authorization.
1 l
O Notice of Availabrity of Safety Evaluation Report.
i O Notice of Issuance of Construction Permit (s).
O Notice of issuance of Facility Op rating License (s) or Amendment (s).
- 13. Other: l b ti ce_o f_/wtlw rl4atlan_ tales u~.a_Cperati on_ dtd. _5/10/79_ -_ _._ _
Ceforenced doctimnts_havelcen provided PDR..-.__ __
Divisinn of Operating RcTctors, OR Office of Nuc' car Reactor Regu!ation Enc'esure:
As Stated ORB!4:D0 y__
RIngram:rf 5A/,:)/79 79121 10 $30 [
9 i
63
/ b'J 0 - U l UNITED STATLS NUCLEAR REGULATORY COMMISSION DUKE POWER COMPANY DOCKETS fiOS. 50-269, 50-270, AND 50-287 fiOTICE OF AUTHORIZATION TO RESUME OPERATION The United States Nuclear Regulatory Cormission issued an Order to Duke Power Company on May 7,1979 (44 F.R. 27776, May 11,1979),
(the licensee), holder of Facility Operating Licenses Nos. DPR-38, DPR-47 and DPR-55 for Oconee Nuclear Station, Units Nos.1, 2 and 3, con-firming that the licensee accomplish a series of actions, both immediate and long term, to increase the capability and reliability of Oconee In addition, Units Nos.1, 2 and 3 to respond to various transient events.
the Order confinned that the licensee would shut down Oconee 3 on April 28, 1979, an additional Oconee unit on May 12, 1979, and remaining unit on May 19, 1979, unless, with respect to the latter two units, the following actions had been accomplished prior to the prescribed dates:
(a)
Install automatic starting of the interconnected emergency feedwater system so that all three pumps will receive a start signal from any affected unit, and test the system for stability.
The emergency feedwater pump discharge flow will be connected to the interconnection headers such that each or all of the emergency feedwater pumps can supply water to any unit. Until these modifications and tests are completed, operating personnel will be stationed at each emergency feedwater pump with a direct cocaunication link to that unit's control room.
In addition, the following procedural changes, put into effect on April 25, 1979 to enhance the reliability of the emergency feedwater system, will rcmain in force:
(1) The discharges of these pumps have been tied together by alignment of manual valves such that each and all of the pumps can supply emergency feedwater to any Oconee Unit requiring it.
/590-01 o (2) Administrative controls have been established so that in the event of loss of both main feedwater pumps on an affected unit, that unit's emergency feedwater pump will start automatically, backed up by remote manual start from the control room.
If the pump fails to start automatically, the operator stationed at that rep will start the pump locally, and has been trained to do so.
In addition, the other two available emergency feedwater pumps will be started remotely from their unit's control room or locally if required to provide two more sources of feedwater to the affected unit.
(3) Emergency feedwater flow to the steam generators will be assured by the control room operator who has been trained to maintain the necessary level.
(b) Develop and implement operating procedures for initiating and controlling emergency feedwater independent of Integrated Control System control.
(c)
Implement a hard-wired control-grade reactor trip on loss of main feedwater and/or turbine trip.
(d) Complete analyses for potential small breaks and develop and implement operating instructions to define operator action.
(e) All licensed reactor operators and senior reactor operators assigned to the Oconee Control rooms will have completed the Three liile Island Unit fio. 2 simulator training at Babcock & Wilcox.
By submittal of fiay 7,1979, as supplemented by two letters dated l'ay 9,1979, the licensee has documented the actions taken in response to the fiay 7 Order.
f'otice is hereby given that the Director of fluclear Reactor Regulation (the Director) has reviewed this submittal and has concluded that the licensee has satisfactorily completed the actions prescribed in items (a) through (e) of paragraph (1) of Section IV of the Order, that the specified analyses are acceptable and the specified implementing procedures are appropriate. Accordingly, by letter dated the Director has authorized the licensee to resume or continue liay 18,1973 operation of Oconee Units 1, 2 and 3.
The bases for the Director's conclusions are more fully set forth in a Safety Evaluation dated fiay 18, 1979.
a 7590-01 e Copies of (1) the licensee's letter dated May 7,1979, and two letters dated May 9,1979,(2) the Director's letter dated May 18, 1979 and 1
(3) the Safety Evaluation dated May 18, 1979 are available for inspection at the Commission's Public Document Room at 1717 H Street, N.W., Washington, D.C.
20555, and are being placed in the Commission's local public document room at the Oconee County Library, 201 South Spring, Walhalla, South Ca rolina 29691.
A copy of items (2) and (3) may be obtained upon re-quest addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Director, Division of Operating Reactors.
FOR THE NUCLEAR REACTOR REGULATION ohh s-
~ z, Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors Dated at Bethesda, Maryland this 18th day of May 1979.
I i