ML19316A177

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-269/78-09,50-270/78-09 & 50-287/78-09 on 780418 & R5-27.Noncompliance Noted
ML19316A177
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/04/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19316A176 List:
References
NUDOCS 7911280713
Download: ML19316A177 (2)


See also: IR 05000269/1978009

Text

l

_

_ _ _ _ _ -

_ - _ .

.

[o *

-

()

P E8Co

UNITED STATES

y(o

NUCLEAR REGULATORY COMMISSION

.

7, .

'

5 -)s ) + (' g g

REGloN ll

  • .g

230 PEACHTREE STREET. N.W. SUITE 1217

'

o

ATLANTA, GEORGI A 30303

g~/

2

  • * " *

liAY

4 1978

I

In Reply Refer To:

RII:FJ

50-269/78-9

50-270/78-9

50-287/78-9

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office

on April 18 and !.pril 25-27, 1978, of activities authorized by NRC

Operating License Nos. DPR-38, DpR-47 and DPR-55 for the Oconee Units 1,

2 and 3 facilities, and to the discussion of our findings held with

Messrs. J. E. Smith and R. M. Koehler at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to a previously

reported unresolved item.

The status of this item is discussed in the

enclosed report.

)

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

i

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

_

.o'

-

_,

./

pu 2** [lO

j

.

m.

~

..

. . - - - - .

- ..- -

..

- .: .

. . . ~ - - - _ . - _ =

.

IIAY

4 g/g

()

Duke Power Company

-2-

.

'

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

_

<mi

Y

f

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report Nos.

50-269/78-9, 50-270/78-9

and 50-287/78-9

cc w/ encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

Seneca, South Carolina 29678

i

l

.

[

el

.-e,