Text

"~

_ _ _ -

_ . - - - - - - - -

- - - ~

__

.-_.

--

-

'.

-

.

.

/jk8 K8 Gig \\

,

UNITED STATES

'

  • l

NUCLEAR REGULATORY COMMISSION

!

8

e'

se

REGION il

2

-

[

230 PEACHTREE STREET, N.W. sVITE 818

o,

[

ATLANTA, GEORGIA 30303

% . .<. * *d'

f56 2I%

In Reply Refer To:

RII:FJ

50-269/78-1

50-270/78-1

50-287/78-1

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office

on January 23-27, 1978, of activities authorized by NRC Operating License

Nos. DPR-38, "R-47 and DPR-55 for the Oconee Units 1, 2 and 3 facilities,

and to the discussion of our findings held with Mr. R. M. Koehler at the

conclusion of the inspection.

"

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items.

The status of these

items is discussed in the enclosed report.

Wfth regard to conducting the moderator temperature coefficient measurecents,

we understand that these measurements will be completed within fifteen

effective full power days following startup after refueling.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

491128 76s

0

__

- - -

..

. _ - _

.-

i

.

.

t

.

.

l

.(~)

3

Duke Power Company

-2-

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

,

l

include a full stateme-

of the reasons on the basis of which it is

claimed that the information is proprcatary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

'

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

'

I

? ' ' ~-

7

,.

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

RII Inspection Rpt. Nos.

50-269/78-1, 50-270/78-1

1.

and 50-287/78-1

cc w/ encl:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

Seneca, South Carolina 29676

i