ML19316A168
| ML19316A168 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/22/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19316A167 | List: |
| References | |
| NUDOCS 7911280706 | |
| Download: ML19316A168 (2) | |
See also: IR 05000269/1978001
Text
"~
_ _ _ -
_ . - - - - - - - -
- - - ~
__
.-_.
--
-
'.
-
.
.
/jk8 K8 Gig \\
,
UNITED STATES
'
- l
NUCLEAR REGULATORY COMMISSION
!
8
e'
se
REGION il
2
-
[
230 PEACHTREE STREET, N.W. sVITE 818
o,
[
ATLANTA, GEORGIA 30303
% . .<. * *d'
f56 2I%
In Reply Refer To:
RII:FJ
50-269/78-1
50-270/78-1
50-287/78-1
Duke Power Company
Attn:
Mr. William O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. F. Jape of this office
on January 23-27, 1978, of activities authorized by NRC Operating License
Nos. DPR-38, "R-47 and DPR-55 for the Oconee Units 1, 2 and 3 facilities,
and to the discussion of our findings held with Mr. R. M. Koehler at the
conclusion of the inspection.
"
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items.
The status of these
items is discussed in the enclosed report.
Wfth regard to conducting the moderator temperature coefficient measurecents,
we understand that these measurements will be completed within fifteen
effective full power days following startup after refueling.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
491128 76s
0
__
- - -
..
. _ - _
.-
i
.
.
t
.
.
l
.(~)
3
Duke Power Company
-2-
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
,
l
include a full stateme-
of the reasons on the basis of which it is
claimed that the information is proprcatary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
'
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'
I
? ' ' ~-
7
,.
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
RII Inspection Rpt. Nos.
50-269/78-1, 50-270/78-1
1.
and 50-287/78-1
cc w/ encl:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. O. Box 1175
Seneca, South Carolina 29676