ML19312E811

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/80-03 on 800327-0404.No Noncompliance Noted
ML19312E811
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/01/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19312E810 List:
References
NUDOCS 8006090561
Download: ML19312E811 (2)


See also: IR 05000369/1980003

Text

e

,

o

UNITED STATES

,NE

1

NUCLEAR REGULATORY COMMISSION

-

$

E

REGION 11

9

0,

101 MARIETTA ST., N.W SulTE 31CO

%

ATLANTA. GEORGIA 30303

MAY 011980

In Reply Refer To:

,

R!I:TJD

50-369/80-03

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by T. J. Donat and M. J. Graham of *.his

office on March 27 to April 4, 1980 of activitics authorized by NRC Construction

Permit No. CPPR-83 for the McGuire Nuclear Station facility, and to the discussion

of our findings held with M. D. McIntosh at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.-

S

1

-.

f. C. [e. &

R. C.

is, Acting Chief

,

Reactor operations and Nuclear

Support Branch

Enclosure:

See Page 2

.

8 0 0 6 0 9'0 66 h

.-

. _ - .

.. .-

- , _

-.

. . - . .

__

.

- .

. .

.

- . . - ,

.

.

.

,

.

'

Duke Power Company

-2-

MAY 011980

4

Enclosure:

Inspection Report No. 50-369/80-03

,

1

,

I

cc w/ encl:

'

M. D.' McIntosh, Plant Manager

P. O. Box 488

i

Cornelius, NC 28031

J. C. Rogers, Project Manager

P. O. Box 33189

i

Charlotte, NC 28242

1

,

4

E

l

1

.

!

4

M

.

b

?

.5-

~

-

,

'

.

+

6

.

.

.

4