Forwards IE Insp Rept 50-327/80-13 on 800301-31 & Notice of Violation
ML19312E771
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/28/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19312E772 List:
References
NUDOCS 8006090516
Download: ML19312E771 (2)


See also: IR 05000327/1980013

Text

. - - . .

-

-

[b

?

o

-

UNITED STATES

7

'

g

' -

!')

NUCLEAR REGULATORY COMMISSION

.

o

{

' '

.

.E

REGION 11

[

101 MARIETTA ST., N.W., SUITE 3100

g

ATLANTA, GEORGIA 3o303

In Reply Refer To:

RII:WIC

50-327/80-13

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by W. T. Cottle of this office on March 1

through 31, 1980 of activities authorized by NRC Operating License No. DPR-77

for the Sequoyah facility, and to the discussion of our findings held with J. M.

Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

,

personnel, and observations by the inspector.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

,

Should you have any questions concerning this letter, we will be glad to discuss

l

them with you.

'

Sincerely,

t

'

E c.

.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

i

Support Branch

Enclosures:

See Page 2

j

iT 80ocot05fb g

'

_

.

Tennesse- Valley Authority

'

-2-

APR 2 81930

.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-327/80-13

cc w/ encl:

.

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

'

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

M. J. Buczynski, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

T. B. Northern

Construction Engineer

Post Office Box 2000

Spring City, TN 37381