Text
. _ _ _
_
. _ _ _ .
/VSf C
>3KFQq
9
o
UNITED STATES
4
l'
3,
NUCLEAR REGULATORY COMMISSION
ff;
~ c. E
REGION V
Vo
1990 N. CALIFORNIA BOULEVARD
e
SUITE 202, WALNUT CREEK PLAZA
e,,,*
WALNUT CREE K, CALIFORNIA 9459G
pff 7
O!d
Docket Nos. 50-460
50-513
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Mr. N. O. Strand
Managing Director
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects 1 and 4
This refers to the inspection conducted by Mr. A. Toth of this office
during the period of January 1-31, 1980, of activities authorized by
NRC Construction Permit Nos. CPPR-134 and -174, and to the discussion
of our findings held by Mr. Toth with Mr. T. Houchins and other members
of your staff on January 14, 21 and 28 and February 4,1980.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of
your activities were not conducted in full compliance with NRC require-
ments, as set forth in the Notice of Violation, enclosed herewith as
Appendix A.
These items of noncompliance have been categorized into
a level as described in our correspondence to all NRC licensees dated
December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
within thirty (30) days of your receipt of this notice, a written
statement or explanation in reply including (1) corrective steps
which have been taken by you and the results achieved; (2) corrective
steps which will be taken to avoid further violations; and (3) the date
when full compliance will be achieved.
l
8006090
p'g
,
. _ _ _ _
_ _ - - _ _ _ _ _ . - _
_ _ _ _
-_. ___. . ._ _ _
___
_. _.
._
1
l
.
.
APR y
jg
.
l
N. O. Strand
-2-
l
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
'
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
!
the enclosed inspection report will be placed in the NRC's Public
'
i
Document Room.
If this report contains any information that you believe
to be proprietary, it is r. cessary that you submit a written application
l
to this of fice, within (30) days of the date of this letter, requesting
that such information be withheld from public disclosure. The application
>
must include a full statement of the reasons why it is claimed that the
infonnation is proprietary. The upplication should be prepared so that
J
any proprietary information identified is contained in an enclosure to
'
the application, since the @ plication without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
i
this regard within the specified period, the report will be placed in
the Public Document Room.
,
Should you have any questions concerning this inspection, we will be
!
glad to discuss them with you.
i
i
Sincerely,
bhiY
l
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branc5
Enclosures:
-
A.
B.
IE Inspection Reports
Nos. 50-460/80-01