ML19312E687
| ML19312E687 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 05/30/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19312E688 | List: |
| References | |
| NUDOCS 8006090406 | |
| Download: ML19312E687 (1) | |
See also: IR 05000460/1980001
Text
pntc oq'o
d
UNITED STATES
-
8 \\*
NUCLEAR REGULATORY COMMISSION
) y,
L i'
.j
REGION V
0,
-
1990 N. CALIFORNIA BOULEVARD
%,
,[
SUITE 202, WALNUT CREE K PLAZA
- e,,*
WALNUT CREEK, CALIFORNI A 94596
MAY 3 01980
Docket Nos. 50-460
50-513
Washington Public Power Supply System
P. 0. Box 968
Richland, Washington 99352
Attention: Mr. N. O. Strand
Managing Director
Gentlemen:
Thank you for your letter dated May 7,1980 informing us of the steps you have
taken to correct the items which we brought to your attention in our letter
dated April 7,1980. Your corrective actions will be verified during a future
inspection.
Your cooperation with us is appreciated.
Sincerely,
{
i
l'
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
.
I
B 00600 0 Td 6