ML19312D706
| ML19312D706 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/06/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19312D693 | List: |
| References | |
| NUDOCS 8003250219 | |
| Download: ML19312D706 (2) | |
See also: IR 05000348/1979037
Text
_
_
_
_
_
._
.
__
.
9"
f
I)
- pa acouq'o
m
UNITED STATES
g
^^'
8
NUCLEAR REGULATORY COMMISSION
o
g
a
REGION 11
0
101 MARIETTA ST
N.W.. SUITE 3100
o
ATLANTA, GEORGIA 30303
.....
D 979
1
EC0
'In Reply Refer To:
RII:WHB
50-348/79-37
50-364/79-17
/
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
-
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. H. Bradford of this office on
November 13-16, 1979 of activities aui.horized by NRC License No. NPF-2 and
Construction Permit No. CPPR-86 for the Farlc.y facilities, and to the discussion
of our findings held with W. G. Hairston at the conclusion of'the inspection.
Areas examined during.the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observationa by the inspectors.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or explan-
ation in reply including:
(1) corrective steps which have been taken by you and
'the results achieved; (2) corrective steps which will be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
In accordanca with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Ccde of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it-is. claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. .If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
80 0@ N
.
. .
~^'
..
,, -
,
- - - .
- .
6
L6
Alabama Power Company
-2-
DEC 0
1979
,
Should you have any-questions concerning this letter, we will be glad to discuss
them with you.
Since, rely,
s
' ' {L t-
(v
~
R. C. Lewis, Actin Chief
Reactor Operations and-
Nuclear. Support Branch
.
Enclosures:
.1.
Appendix A, Notice of Violation
2.
Inspection _ Report Nos. 50-348/79-37
and 50-364/79-17
cc w/ enc 1:
.
A. R. Barton
Executive Vice President
P.'O. Box 2641
Birmingham, AL 35291
J. T. Young
Vice President-Production
-Post Office Box 2614
. Birmingham, Alabama 35291
i
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
i
Birmingha.n, AL 35291
C. Biddinger, Jr.
Manager-Corporate Quality- Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager _
Drawer'470-
Ashford, AL 36312
R. E.LHo11 ands, Jr.
.QA Supervisor
P.=0. Box U
Ashford, AL' 36312
_
.
-
_
.- .