Text
fl.AEEW. TU "57'U-'t !'"7liTH O
e CLi.~.L.'l 2.[. 7..].i
- pn **ouq'o, 373yp UNITED STATES
'n NUCLEAR REGULATORY COMMISSION 9E REGION 11 o
101 MARIETTA ST., N.W., SulTE 3100 k
ATLANTA, GEORGIA 3o303 g*ess*
In Reply Refer To:
MAR -31980 RII:ELC 70-1151/80-04 Westinghouse Electric Corporation ATTN:
M. D'Amore, Manager Columbia Plant Nuclear Fuel Division Drawer R Columbia, SC 29205 Gentlemen:
This refers to the inspection conducted by E. L. Clay of this office on
)
February 11-15, 1980, of activities authorized by NRC License No. SNM-1107 at Westhinghouse Nuclear Fuel Division and to the discussions of our findings held with M. D'Amore at the conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material",
and specific license conditions. Within these areas, the inspection con-sisted of selective examinations of procedures and. representative records, interviews with personnel, performance tests, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
Two new unresolved items resulted'from this inspection and are discussed in the enclosed report. These items will be examined during subsequent inspections.
As agreed in your letter of February 15, 1980, a complete revision of each section of the Columbia Plant FNMC plan will be submitted to the Office of Nuclear Materials, Safety and Safeguards, Washington, D.C., for review and approval by April 30, 1980.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosed inspection report with the exception of the report cover page, which is an inspection summary, will not be placed in the Public Document Room.
?
MATEIA!. T"_'.'P'.T3 i'Mi"T!i 653 CONICS 2.EEE.r :.1 8003240
MATEU5.'. t.... a -. F:'*"!.TH C"1:!l.:FI I L...... n:3:1 a
'i Westinghouse Electric Corporation MR -S 1980
' Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, p. B. Kenna, Chief Safeguards Branch
Enclosures:
1.
Inspection Report No. 70-1151/80-04 (Exempt from Disclosure) 2.
Inspection Summary (Not Exempt) f f