Forwards IE Insp Rept 50-327/80-02 on 800116.No Noncompliance Noted
ML19312D096
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/06/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19312D097 List:
References
NUDOCS 8003210015
Download: ML19312D096 (2)


See also: IR 05000327/1980002

Text

.

, . .

-

._

e

..a

-

  1. o

' UNITED STATES

6&ss7

y

!

T

NUCLEAR REGULATORY COMMISSION

4

-

Y

.$

1-

REGION ll

. O,

L I'

'

101 MARIETTA ST

N.W., SUITE 3100

~

% *'. Q

ATLANTA, GEORGIA 30303

s-

        • '

FEB - 61980

.In Reply Refer To:

RII:PKV.

50-327/80-02

.

Tennessee Valley Authority

'

AITN:

H. G. Parris

-Manager of Power

500A~ Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by P. K. Van Doorn of this office.on

January 16, 1980 of activities authorized by NRC Construction Permit No. CPPR-72

for the Sequoyah Nuclear Plant facility, and to the discussion of our findings

held with R. M. Jessee at the conclusion of the inspection.

)

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

. personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance vere disclosed.

'In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title.10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

'*

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the'information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

,

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

>

f

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

ack

ryant,

ing Chief

.

Reactor Construction and

Engineering Support Branch

'

Enclosure:

(See Page 2)'

,

'

qD

sooa21o ois

j

.

.

.

F-

i

.

Tennessee Valley ~ Authority

-2-

FEB - 61980.

.

Enclosure:

Inspection Report No. 50-327/60-02

cc w/ enc 1:

G. G. Stack, Project Manager

.P. O.' Box 2000

' Daisy, TN 37319'

J. M. Ballentine

Plant Superintendent

,

P. O. Box 2000

Oaisy, TN 37319

'i

L. Lambert, Project Engineer

Chestnut Street Tower II

.

attanooga, TN 37401

s. F. Cox

400 Commerce Street

?

W10C131 C-K

Knoxville, TN 37902

E. G. Beasley

. .

Tennessee Valley Authority

-

'309 Grant's Building

Kncxville, TN 37902

\\