~i ATTACHMENT NO. 3
'.( *
(
l REQUEST FCR PROCUREMENT RFPA NO. RES-78-203 DE':
9 'is7:
- te:C?.ANDUM T0: Director, Division of Contracts
' F7.:':
' Director, Division qf_ Safeguards, Fuel Cycle & Environmental Research (jhis form is^ designed to accommodate varying kinds of procurement requests, including small purchases,. sole scu,rce actions and cc= pet,itive solicitations.
.r.::plicable items or tncse for which you have nct developed information srould be left blank.
In.such cases, pro.iect officer should contact Division cf Contracts personnel for accrocriate ouidance.)
Fart I - Project Data 1.
It is requested that'the Division of Contracts take the following action:
/_/
Issue a Request for Proposal
/_/
Executeakodificationto Contract No..
-!7 Issue Purchase Order with with Mr. C. Williams, NL Industries, tiame of Person or Fir:
Nuclear Division, P.O. Box 2046, Wilmington, Del.
19899'
/]/
Award 'a Sole Source Contract
/_/
Award a contract on basis of to our. acceptance of an-t!ame of Person or Firm Unsolicited Proposal 2.' The project'is entitled, '.
Quality Assurance Safety Analysis Report t
. [..' 5
[.' ! $'.'.t) 3.-
The estimated time requircj.T tp&petfpri th03Gork is -
' years 1
- v ronths.
!nse-send.-Rece%g Rems to-iferen T4...ar,.iiSG-55.
s tno 8002110
/
w
\\
/
(
a
(*
(
ARTICLE I - SCOPE OF HORK The contractor shall provide the necessary services to the "uclear Regulatory Ccmmission to review and ccmment on the follodina specified renort - Plutenium sections of a draft document entitled, " Safety Analysis Air Transportable Package," authored by Sandia Laboratories.
Section 7, Operating Prc,edures - contractor shall review and (1) c condense subsection 7.1,'"Precedures for Loading the FAT-1 Package," to a format consistent with subsection 7.2, " Procedures for Unicadino the Packaoe.".The remaining subsection 5 of 7.0 shall be reviewed for the purpose of condensation without detracting frera discussions necessary to assure proper packaae utilization. A
~
retyped edition of this section will be provided by the contractor to HRC' (5 man days).
(2).Section B, Acceptance Tests and Maintenance Program - contractor shall reorganize this section pursuant to guidance given by NRC to the centractor at a meeting-en November 30, 1977. Centractor shall. review this section for clarity and completeness and sunply
'a revised retyped edition to NRC.(5' can days).
(3) Section 9, Quality Assurance - contractor shall review this section,
. including Appendix 9.1, for clarity and completeness. Contractor shall review all references to military specifications with the int;nt s.
of recc mending where feasible, equivalent industry specificaticns in a tabular presentation.
Contractor shall a1sn review drawinns.
e 9
.4
~.~ _ )
. * *l
's
(-
(-
. and specifications providing preliminary " mark-ups", with the intent of establishing the scope of work required to minimize the drawing and-specification set and to relax those tolerances which do not affect the performance of the package as described in the sap.. A letter summarizing the pctentid[ scope of work involved in changing the drawings as suggested shall be submitted to flRC (10 man days).
Three trips between Willmington, Delaware are Silver Spring, Maryland will be required to ccmplete these tasks:
(1) to establish and trans'mit to the contractor guidance required for revisions to'se.ctions 7 and 8 - flovember 1977.
(2) to establish the unticipated extent of the changes required for the drawings and specifications -.Pecember 1977 (3) to present the marked-up drawings and specifications to the i
f1RC staff uith justification for the recommended changes -
i 6
December 30, 1977
..c,,..,
1 l
t i
e 1
j
?
b 5
I V
.t l
1
=
o t?.
(
's
- ~ [ '. '
'(
(-
p i
. D.irector, Division of Contracts 3
Part IV --Attachments Revised
. /j -
Statcr::t f Work (Attach =ent !!o.
)
Revi:ci C :,t Estimate
/_/
Evaluatic,n criteria and their numerical weight: iA:tachment tio.
)
./2/
List of firms to be invited to submit proposals in addition to general cublic notification (Attachment fio.
i
/_/
Copy of letter designating Scurce Evaluation F :i members
'(Attachment flo.
)
/_/
Sole Scurce Justification, if applicatie.
(Attachmentf;o.
)
/_/ ' Unsolicited Proposal Justification, if applicable. Approval and execution of a contract with en flame of Proposer the basis of an unsolicited proposal is recommended.
( Attachment flo.
)
w
/j Contract Review Board Certifications (Attachment No.
)
. /_/_ 'Special Requirements" '(Attachment ilo.
)
.i t t' wit,4 N
Frank J.
rsenault, Director, SAFER Signature uf Girice Di~ rector (Designating Official) 4 -
- This portains to' instructions ccncerning schcdules,'rescrts, data,
{
Government-furniched ecuipment,.or other special requirements.
'e.
~
.a e
y
.