ML19312C858
| ML19312C858 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/15/1973 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wells T DUKE POWER CO. |
| References | |
| NUDOCS 8001130013 | |
| Download: ML19312C858 (3) | |
Text
.s e^'" %<.,,
UNITED STATES I
q ATOMIC ENERGY COMMISSION p
l !(
e<
DIRECTOPATE OF REGULATCRY CPEPATICUS I
(\\dh[
accios n - soire eis 23o pe4carare sracer soarswest u i c5 At t.A ur 4. cecac] A 30303
,,,, m.
s n
In Reply Refer To:
AUG 15 E RO:II:Noi 50-270 50-287 Duke Power Company Atta:
J. R. Wells, Manager Construction Services Box 2178 Charlotte, North Carolina 28201 Gentlemen:
In accordance with our recent meeting, rel: tive to installing a program for gathering and reporting information on the current status of the construction / testing / core loading schedules on the Oconee 2 and 3 facilities, we are enclosing data sheets to assist you in submitting the desired information.
I have enclosed the following information:
1.
A revised network as developed in our meeting on July 26, 1973.
This network indicates the status of your activities as of that date.
2.
A summary instruction sheet, a single sheet report form, and a revised glossary for reporting changes in your construction schedule or progress.
3.
A listing of milestones and activities for your use and con-venience.
We request that you review this information as soon as possible and submit to this of fice, no later than September 14, 1973, any changes and additions required to reflect your current construction progress.
It is also requested that changes and additions be submitted in accord-ance with the enclosures no later than the 14th of each following month.
A negative report is desired where applicable.
- q 1
I i '\\
i
\\
i) 8001130 0 / 3 9
Duke Power Company AUG 151973 In accordance with paragraph 2.790(b) of 10 CFR 2, the enclosures are considered to be proprietary and, accordingly, will not be made available for,public inspection.
We sincerely appreciate your cooperation in this matter and reiterate our desire that this scheduling program be handled at the lowest I
practical organizational level.
Should you have any questions, we I
will be pleased to discuss th
.2 with you.
Very truly yours,
/
A P
Norman C. Moseley Director I
l
Enclosures:
1.
Revised Network l
2.
Summary Instruction Sheet, a Single Sheet i
Report Form, w/Re' ised Glossary 3.
Listing of Milestones and Activities l
1
?
i i
n n
.Y 4
i
(
Ltr to Duke Power Ccmpany 4td MG 15 ED ec w/o enc 1:
H. D. Thornburg, R0 RO:HQ
' ' DR Central Files PDR Local PDR NSIC DTIE, OR State 4
e,\\
"2 a
I