ML19312C529

From kanterella
Jump to navigation Jump to search
Amends 46,46 & 43 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Changing Tech Specs for Operation of Unit 3, Cycle 2 W/Cycle Length Extended to 282 Effective Full Power Days
ML19312C529
Person / Time
Site: Oconee  
Issue date: 09/09/1977
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19312C528 List:
References
NUDOCS 7912160089
Download: ML19312C529 (10)


Text

_

O 4$

UMTED STATES O.A A

uucts aaeout 1oavco issio-W ASHINGTON, D. C. 20666 g

%, ' w y DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT N0.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 46 License No. DPR-38 The Nuclear Regulatory Comission (the Comission) has found that:

1.

The application for amendments by Duke Power Ccmpany (the licensee)

A.

dated July 5,1977, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's r21es and regulations set forth in 10 CFR Chapter I; The facility will operate in confomity with the application, B.

the provisions of the Act, and the rules and regulations of the Comission; There is reasonable assurance (i) that the activities authorized C.

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public ; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is anended by a change to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility License No. DPR-38 is hereby amended to read as follows:

7912160087 m

J i

-2 "3 B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 46, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective within 10 days.after the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION I

f l:Nd&p A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications

' Date of Issuance:

September 9,1977

~

J O

e m

k UNITED STATES j

NUCLEAR REGULATORY COMMISSION y *-

p.

{

1, J WASHINGTON D. C. 20555

\\;%k.#

DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 46 License No. DPR 47 1.

The Nuclear Regulatory Comission (the Comission) has found that:

The application for amendments by Duke Power Company (the licensee)

A.

dated July 5,1977, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rule and regulations of the Comission; There is reasonable assurance (i) that the activities authorized C.

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public ; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by a change to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility License No. OPR-47 is hereby amended to read as follows:

0 f

9 i

2 "3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 46, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective within 10 days after the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION k?tWMd&&

A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: September 9, 1977

w q

%,L

/

UNITED STATES NUCLEAR REGULATORY COMMISSION y'

j l'. j W ASHINGTON. D. C. 20666 e

g S

J gv f DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NU7 TEAR STATION, UNIT NO. 3 AMENDMENT TO TACILITY OPERATING LICENSE Amendment No. 43 License No. DPR-55 1.

The Nuclear Regulatory ConTaission (the Comission) has found that:

A.

The application for amendments by Duke Power Company (the licensee) dated July 5,1977, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chancer I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense ano security or to the health and safety of the public ; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by a change to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Facility License No. DPR-55 is hereby amended to read as follows:

.s 3

/

2-

"3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.43

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective within 10 days after the date of issuance.

FOR THE NUCLEAR REGULATORY C051ISSION ML40G A. Si-hwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 9,1977

4

)

i i

i ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO.46 TO DPR-38 AMENDMENT N0.46 TO OPR-47 1

AMENDMENT NO.43 TO DPR-55 DOCKET NOS. 50-269, 50-270 AND 50-287_

Revise Appendix A as follows:

i Remove pages 3.5-17, 3.5-EJb and 3.5-23d and replace with identically numbered pages.

i i

l l

l l

l i

o i

s s

255.10:

154.ic:

100 CPERATICN IN THi5 70w!R LEyg.,

u t,...

... a. r. e.. ;e yui a

ai

,u.

00

~~~ "'

A L'.0 W E D

=0 R r e i n i c. i :n.

a d,w,..,. 4 P R E G l 06, ivv i 7n6 u.;rso a

. Tim.. J l i t

--t

        • a si-gsyg7 00,67

-=

.00

=

e::

e R

50 i.. 5:

=

LC

s. e..:.M..i. S 1 = i. :

30 0.cERATING = REGION 20 C.15 10 i e i i i i i i i g 0 20 40 50 5" 100 120 140 150 130 200 220 240 250 2:0 300 R00 InC!! L #:*ri ranr. a 3:

un

- =. 1 n.0 10,0 0 c; .v i: w i 1 I t t e i Gr. ;5 Graca 7 n =. c - a. ILn n. J 4 t i I i uf0Up a ..yg. i, v..e.:, - n r c. r.,.e - 6. m.n .4.s. rw s ,.v. ,s :. :- - :. .c. m. i :.:. 7;.:r. p/ e _w ..s_ EFFD Uni; 3 'entje*R CCONEE NUCLEAR STATION 1 C i -'J r e '.. :.. ? -l C" ,1 J.. 4/ Amendment-46, 46 & 43 1 I

7 I 233.la: 0?ER1 TION IN THi3 100 - .uG!ON IS N04 -n REs-+.l-t-r.:aivN -u FOR 3 PUW? E ALLongg OPERATION I 50 .....a, '"O* b 50 SHUTOC#N Y.iRGIN u a _ '.lYl.i E u 50 = _=., " 50 ?ERMIS315LE ~ u OPERATING E.,0 n. n:u l 0N, e

30

= 2nv e sa E C C i i i g 0 20 40 50 50 100 120 140 150 150 200 220 240 250 250 300 Roc Incex. 5 #itncrawn 0 25 50 75 100 0 25 50 75 100 i i i r i i j WIoUC 7 $70U0 3 1 0 25 50 75 100 t I i Group 5 i .,,s - ,7M -- -,s-e R n n.3 n. c.. .,v a., is.u in e-AGO THREE-PUMP OPERATION AFTER 225(-10) EFPD Uni: 3 %' b \\Q%, OCONEE NUC n aw Figure 3.5.2-2C3 3.5-20b Amendments 46, 46 & 43

s 3 .) P:s t r. # O f 2663 MII - e 3 K ! C *' :' D R ' *# l '* N - 16.7.10 M*4 100 .:5.5.10: [ 23.as.si

c. C.

.. 4... 91 50 ,0 e j PERMIS515'.E OPERATING REGION 30 30 20 1a i i l f l I I 50 40 30 20 10 0 10 20 30 40 50 t u Axtal P nst imcalan;!. '< OPE?.ATIONAL POWEF '.MEALANCE ENVELOPE FCR OPE:.aTION AFTEE 225(-10) EFFJ Unit 3 'sado if'. CCCNEE NUCLEAR STATION 'W'

v.... r a.....

3C.- ^ 4 :-G-Amendments 46, 46 & 43 .g -,}}