ML19312C456
| ML19312C456 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/20/1977 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19312C457 | List: |
| References | |
| NUDOCS 7912130987 | |
| Download: ML19312C456 (3) | |
Text
_ _.
l l
l May 20, 1977 r
l Docket Nos.J0-269
'50-270 and 50-287 Duke Power Company ATTN: Mr. William 0. Parker, Jr.
Vice President - Stoam Production Post Office Box 2178 422 South Church Street Charlotte, North Carolina 28242 Gentlenen:
In our meting on March 23, 1977, at the Jocassee Dam site near the Oconee Nuclear Station. We stated what we consider to be appropriate actions for Duke Power Company to take to allow us to evaluate the potential seismic hazard at the Jocassee Dam.
We outlined a threefold program:
(1) a short tem mport, (2) a monitoring program, and (3) a longer-tem report that will describe the findings of the mnitoring pmgram.
It is requested that the short tem report be submitted within 60 i
days of the date of this letter. The contents of this mport were discussed with.you at the meting cited above. Tne enclosure to this letter provides further details of what the short tem report should include.
The enclosure also addresses what we consider to be an adequate mnitoring and reporting pmgram. This pmgram includes (1) the installation of thme pemanent seismic mnitoring stations and two to four microsarthquake recorders to augment W pemanent stations, all which we request that you install b; August 1,1977, (2) reports of the results of the waitoring program submitted to the NRC quarterly, and (3) infoming NRC by telephone of any unusual seismic activity as soon as possible. The enclosure provides the details of this program.
The longer-tem mport should be submitted by January 1,1979, and sunnarize ano discuss the results of the mnitoring pmgram through Novenber 1978.
]
GS 7 9121307NP
Duke Power Company May 20, 1977 It is requested that you sthmit a request for a license amendment to your facility which would incorporate the requirements discussed herein for the monitoring program and the lonyer-term report. please respond within 45 days after receipt of this letter.
Sincerely.
A. Schwencer, Chief Operating Reacters Branch fl Division of Operating Reactors
Enclosure:
cc w/ enc 1:
See next page DISTRIBUTION Dockets NRC(3)
LCCAL PDR ORB #1 Reading KRGoller ASchwencer BXMIBMMen DNeighbors SMSheppard OELD 0!&E (3)
ACRS (16)
TBAberna thy JRBuchanan DEisenhut VStello orric s *
._DDRr0RR#1 00R:0RRdl.s summauc h
..O N nrtall A9ehwanc i
i
.5/ia/77 g/Ml7 DAts
- NRC FOR.M 318 (9 76) NRCM 0240
- u. s. movsanusme rainrima orricae sore - eae.es4
7m:,
'gr.
Duke Power Company May 20, 1977 cc: Mr. William L. Porter Duke Power Company P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28242 J. Michael McGarry, III, Esquire DeBevoise & Liberman 700 Siioreham Building 806-15th Street, NW.,
Washington, D.C.
20005 Oconee Public Library 201 South Spring Street Walhalla, South Carolina 29691 l