Requests Extension of Completion Date for Provisional CPPR-33 from 720131 to 720630
ML19312C373
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/20/1971
From: Thies A
DUKE POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19312C370 List:
References
NUDOCS 7912130903
Download: ML19312C373 (2)


Text

_

O '

DcxE POWEn CO31PANY Powr.se Desterwo 42e Soutit Cs Usecis STntrT. CatAntoTTr,N C 202o:

r. o. nox zare A e wit s
i. i r. u...u f.*,C t O ho s 4 % t. Tes%* an eg w Q(

December 20, 1971

/[

' ' 'r0 h s

~

Division of Reactor Licensing 9j b2C O S$$7N*"h.i Dr. Peter A. Mor-is, Director a

l Atomic Energy Commission U

At ','-7.Tn2 C

d

'/

Washington, D. C.

20545 u...fi

.?

V, b Oh Re: Oconee Nuclear Station - Unit 1 i 0)

Docket No. 50-269 Provisional Construction Permit No. CPPR-33 Application for Reneual of Construction Fernit

Dear Dr. Morris:

We ' ereby apply for an extension of time for completion of Oconce Nuclear Sta Lon Unit 1 as covered by Provisional Construction Permit No. CPPn-33.

The original permit called for completion of the facility by February 28, 1971. This date was extended first by your order dated February 27, 1971 to Septcnber 30, 1971 cnd again by your order dated August 27, 1971 to January 31, 1972. As centioncd in our letters of February 19 and August 6, 1971, delays produced by late delivery of major reactor system cen-ponents, the replacc:nent of the reactor coolant pumps, and completion of the preoperational test program have extended the original schedule considerably.

In addition to these delays, the reactor coolant pumps have recently experienced excessive vibration which has required their removal and return to the manufacturer for exnaination and necessary modifications. We expect that the f acility will be ready for fuel loading about March 15, 1972.

We hereby request that the latest completion date specified in Construction Permit No. CPPR-33 be extended f rom January 31, 1972 to June 30, 1972 to provide a suitable cargin.

Very truly yours,


4.

jf34$C 4

A. C. Thics M

0 t vr y 911B 13 u.x.B b

4

.i t

NORTH Cla0LIIM

)

l

)

MECK1.ENBURG COUNTY )

Senior Vice A. C. THIES, being duly sworn., states that he is d on the part of President of Duke Power Ccepany; that he is authorize Cor. mission thic t

said Company to sign and file with the Atomic Energy I

that he has read all of Application for Renewal of Construction Percit; nd that all such statements the statocents contained in such Application; a ct to the best of his made and matters set forth therein are true and corre knowledge, information and belief.

+

~.2,/l

%5f A. C. Thies d for Subscribed and sworn cu before te, c Notary Public in an day of December, 1971.

the State and County above named, this 20th E

Notary P'ubl'ic j

My Commission Expires:

G~y,,J 5 / 9 7G.

u r

f4>

o e

ATOMIC ENERGY COMMISSION DOCKET NO. 50-269_

DUKE POWER COMPANY Order Extending Provisional Construction Permit Completion Date By application dated December 20, 1971, Duke Power Company requested an extension of the latest completion date specified in Provisional Construction i

Permit No. CPPR-33.

The permit authorizes the construction of a pressurized

}

water nuclear reactor designated as the Oconr2 Nuclear Station Unit 1 at the applicant's site in Oconee County, South Carolina, approximately eight miles northeast of Seneca, South Carolina.

Good cause having been shown for this extension pursuant to Section 185 of the Atomic Energy Act of 1954, as amended, and Section 50.55(b) of 10 CFR Part 50 of the Commission's regulations, IT IS HEREBY ORDERED THAT the latest completion date specified in Provisional Construction Permit no. CPPR-33 is extended from January 31, 1972 to June 30, 1972.

FOR THE ATOMIC ENERGY COMMISSION Origird signedby Peter A tactris Peter A. Morris, Director Division of Reactor Licensing a

cate of Issuance: JAN 2 8 E72 ycy pt30 757 Y