ML19312B946

From kanterella
Jump to navigation Jump to search
Requests Deletion of Tech Spec 1.2.8 Defining Refueling Period as Time Between Normal Refuelings of Reactor,Not to Exceed 18 Months W/O Prior NRC Approval.Forwards Proposed Replacement Page W/Remaining Specs Renumbered
Date released: 11/22/2019 Download: ML19312B946


Proposed Replacement Page W/Original Tech Spec 1.2.8 Deleted Re Definition of Refueling Period as Time Between Normal Refuelings of Reactor,Not to Exceed 18 Months W/O Prior NRC Approval.Remaining Specs Renumbered
ML19312B952
Person / Time
Site: Oconee 
Issue date: 03/12/1975
From:
DUKE POWER CO.
To:
References
Download: ML19312B952 (2)
Requests Deletion of Tech Spec 1.2.8 Defining Refueling Period as Time Between Normal Refuelings of Reactor,Not to Exceed 18 Months W/O Prior NRC Approval.Forwards Proposed Replacement Page W/Remaining Specs Renumbered
ML19312B944
Person / Time
Site: Oconee 
Issue date: 03/12/1975
From: Thies A
DUKE POWER CO.
To: GIAMBUSSO A
Office of Nuclear Reactor Regulation
References
Download: ML19312B944 (3)