ML19312B944
| ML19312B944 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/12/1975 |
| From: | Thies A DUKE POWER CO. |
| To: | Anthony Giambusso Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19312B946 | List: |
| References | |
| NUDOCS 7911270732 | |
| Download: ML19312B944 (3) | |
Text
~
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
2971 FILE:
FROM:
Duke Power Co=pany DATE OF DOC DATE REC'D LTR TWX RPT OTHER Charl e, N. C.
28201 3-12-75 3-18-75 xx TO:
ORIG CC OTHER SENT AEC PDR XX Mr. A. Giambusso 3 signed 37 SENT LOCAL PDR W
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX 40 C0-26G370/287 DESCRIPTION:
Ltr notarized 3-32-75 request:.:@CLOSU R ES:
Replacement page 1-2 to that Tech Spec 1.2.8 be deleted & trans the following:
Cconee Tech Specs....
(ho cys encl ree'd) g-
..- m m..,
i.,w.w v-r s * ~
PLANT NAME:
Oconee Units 1-2-3 FOR ACTION /INFORMATION DHL
%10-75 BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)
VASSALLO (L)
KNIGHTON (E)
SPELS W/ Copies
,)V/ Copies W/ Copies W/ Copies KNIEL (L)
WURPLE (L)
YOUNGBLOOD (E)
W/ Copies W
opies W/ Copies W/ Copies INTERNAL DISTRIBUTION kG FILE $
TECH REVIEW DENTON LIC ASST A/T IND -
t run i al SCHROEDER GRIMES R. DIGGS (L)
B R AITM AN C, ROOM P 506A MACCARY GAMMILL H. GEARIN (L)
SALTZMAN OSSICK/ST AF F KNIGHT KASTN E R E. GOULBOURNE (L)
MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)
GI AM BUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD STELLO M. MAIGRET (L)
MCDONALD MOORE (L)
HOUSTON ENVIRO S. REED (E)
APMAN DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
BE (Ltr)
, f 0VHOLT (L)
ROSS DICKER edf. SH EPPARD (L)
. COUPE S
v;OLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO LLINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE LONG GAN S. TEETS (L)
KLECKER F}EG_OPR LAIN AS OJjCT LDR G. WILLI AMS (E)
EISENHUT WILE & REGION (2)
BENAROYA MM V. WILSON (L)
WIGGINTON T.R. WILSON VOLLMER HAR CESS R. INGRAM (L)
A/g 9/
STEELE EXTERNAL DISTRIBUTION
'/ '
/*
_d - LOCAL PDR
'in 1 hn 11 a, S.C.
WI -
(1J(2)(10) - N ATIONAL LABS 1 - PDR-SAN /LA/NY
/ TIC (ABERNATHY)
NSIC (BUCHAN AN) 1 - W. PENNINGTON, Rm E-201 GT 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. U LRIKSON, ORN L
_ j'- Newton Anderson N EWM ARK /BLUM E/AG B ABI AN 1 - AGMED (RUTH GUSSMAN)
F14 ACRS IMIEI:OCGSENT 'IO LIC. ASST. SHEPPARD 3-19-75 Rm B-127 GT 1 - J. D. RUNK LE'S, Rm E-201 GT V911270 3 7 g
,m
)
.. t.
6
{ '-
- 7. - G'3 IW DUKE POWER COMPANY 1
Powen Butt.orwo 4aa SouTu Cnuncu STazzT. CnAntoTTE, N. C. asaos A. C. Tn r zs P. O. Box ai7e St=ca wcs Pass.e<=e menowet.o= amo Tes=sm.sseo=
March 12, 1975 g
f
/x' '
i.i i
,cy r
C
/.,
Mr. Angelo Giambusso, Director g
.T,'
Division of Reactor Licensing 4
U. S. Nuclear Regulatory Commission J'
Washington, D. C.
20555 p jf _.
o
\\,/ ;x
..N 4
Re: Oconee Nuclear _ Station Docket Nos. g -270, -287
Dear Mr. Giambusso:
Section 1.2.8 of che Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, -47, and 55 defines the Refueling Period as the time between normal refuelings of the reactor, not to exceed 18 months without prior NRC approval. The basis for requiring prior NRC approval before exceeding an 18 month interval was that many surveillance tests were specified to be performed during a refueling outage. Recent amend.7ents to the Technical Specifications have revised these surveillance tests to a calendar basis with the exception of those which are directly as-j sociated with refueling.
Pursuant to 10 CFR 50.90, it is requested that Technical Specification 1.2.8 be deleted. The attached proposed replacement page shows this Technical Specification deletea and the remaining specifications renumbered.
Very truly yours, 4>
W
,i A. C. Thies g.,
4o I
ACT:vr i
,,2,,@c'/
Attachment
- q
.. p,.
k's
(/*
V
', i ~Us x.'
m1 u
n
)
J O,
Mr. Angelo Giambusso Page 2 March 12,~1975 A. C. THIES, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part of said Company to ed3n and file with the Atomic Energy Commission this request for amendmen. of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, DPR-47, and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
e VWiS A. C. Thies, Senior Vice President ATTEST:
A 2
hn C. Goodman,Tr.
sistant Secretary l
Subscribed and sworn to before me this 12th day of March, 1975.
1 Notary Public My Commission Expires:
~ & *- c -..
AJ l s '/ '7
.