u.0. NucLaAM REGuLATCAY CCMMISSI N m

it.~

y so h7o/287 NRC poru 195 N. RC DISTRIBUTION.=ca PART 50 DOCKET MATERIAL 3:*

FROM:

cATa CP QCCuMENT Duke Power Company 1/16/78 Mr. Edson G. Case Charlotte, North Carolina c4Ts macsiveo l

William O. Parker, Jr.

1/19/78 i

zgspan ONoTonizmo emer iseufnomu Nuusen ce copies asesiveo l

ZoaiciN AL 26NetAssineso Cccer p3g6pGQ ENCLoSURf

{ :esemPTICN Response to NRC request for additional info. concerning the fire protection program.....w/att set of drawings...

PT ANT NAME: Oconee Units 1-2-3

/A Tp [

[/7 y

I DISTRI3L7 ION OF FIRE PRUrICTION INFO PER S.SHEPPARD 9-22-76 FOR OPERATING REACTORS RJL 1/19/78 (1-P)

(10-P)+(12-P)

I EA.cl. /RGPRO 400y1 "Y'I26 l er-23aw ro nies ro 8%

be$1Nlt b-h ll/$l k

$W@l'A't?O Cu r 7D Jws.s Mss /Oy"-

5AFF.TY FOR ACTION /INFORMATION I BRANCH CHIEF:

(3I I 8CA4t> t'PA#M I

]

I I

I PEECT f.; NAGER:

1 I

i i

l l

I I I

I 1

I I

i f7 T INTERNAL OlSTRIBUTICN

/i R2G CTLD 44./ //22ts)b3

')D N M t'E W1'*0 6 U T 7 0 JA>9996.5 WA/N M r l l f i l i

! I I & E (2) l I I i i i t

i CELD I i i

l i l

i I 3ENAROYA (2) i l I

i EISE W L7 I

4 I i i i '4LT IR (5)

I i I

i

! ! '4AM3ACH i i l

i i l

R. c'URANAKA t

I i i i !

I i u.ANAUFR i i

! I I I I

i J,4,mpf him!w 7-t 1

I !

I I I

i l

l t i i

l i l I

i i ;

I I I l

1 I I l l 1

i l

1 I I l l 1 l

J l I 6 i i :

i I i l

i l i

EXTERN AL CISTRIBUTICN I

CONTRCL NUM3ER 1 LPDR: W 4 WC'4 J4.i i i l i TIC:

1 I I

t

! 4 NSIC.

I I i i 790190184 i ACRS 16 CTS ingqueessG/SE:fr 9perP-Cor"d I

! i i !

i[

.\\y 6r 4

i

. i 4

90 Fff Eb Nec FCmu 195 i2461

}

}

DUKE POWER COMPANY Powra Bt:st.nixo i

422 SocTn Cut:ncu StazzT, CiuntoTTr. N. C. 28242 wiwa= o Paa ara..aa.

January 16, 1978

/sct Pettictut ICLCp=ONCI AAE4 704

$ ? tau Peooyctiom 373-4083 b'

['( '(,1 P -

Mr. Edson G. Case, Acting Director Office of Nuclear Reactor Regulation dy h

9 WNISM* k !

U. S. Nuclear Regulatory Commission g

Washington, D. C.

20555 Attention:

Mr. A. Schwencer, Chief 9

Operating Reactors Branch #1 8

4

.-;,j I

Reference:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

In response to requests for additional information concerning the fire protection program transmitted at Oconee Nuclear Station by your letter of December 15, 1977, the attached information is provided.

Very truly yours, L>))i 0VA William O. Parker, Jr.

LJB:ge Attachment 780190184

~

RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION OCONEE UNITS 1, 2. AND 3 FIRE PROTECTION Question 15 Identify any provisions in turbine building drains, such as backflow prevention devices or drains entering below sump level, that prevent a fire from being transmitted from one area to the next.

Provide drawings showing piping and valving on the drain systems serving safety-related areas.

Response

This information will be provided by January 25, 1978.

Question 16 Describe whether any of the ventilation systems located at elevation 838 feet of the Auxiliary Building are required for safe shutdown functions, such as required room cooling for continued equipment operation.

Response

Ventilation systems located on elevation 838 are not required for unit shutdown.

Question 17 Provide information on the combustibility of the electrical cable used in Oconee and whether it meets the requirements of IEEE 383.

Response

The IEEE 383 Standard was developed after the Oconee cable had been installed.

However, this same cable construction has been used at a later plant where IEEE 383-1971 was imposed and construction was acceptable under IEEE 383-1971.

Question 18 Provide drawings of the turbine building which show the routing and separation of the power-feeds to the 4160 volt engineered safe guards switchgear including feeds in the blockhouse and those externa) in the building.

Response

This information was provided in Duke Power's November 22, 1977 submittal.

. Question 19 Provide drawings showing the piping and valving arrangement for the condenser Cooling Water System including the cross-connection header and HPSW pump connection.

h' h

Roepen*n

'The following drawings of the CCW System.are provided:

PO - 133 A Diagrammatic Layout PO 133 B Diagrammatic Layout 0 - 331 CCW General Layout 0 - 201 Turbine Building Substructure Concrete 0 - 202 Turbine Building Substructure Concrete 0 - 214 Turbine Building Substructure Concrete 0 - 215 Turbine Building Substructure Concrete 0 - 225 Turbine Building Substructure Concrete 0 - 226 Turbine Building Substructure Concrete These drawings are marked to show the CCW Piping,.the cross-connection header and HPSW pump connections.

Question 20 Verify that the Turbine Building deck is Factory Mutual Class 1 construction.

Response

Information regarding the Turbine Building roof deck will be furnished by January 25, 1978.

Question 21 Document plans to install water flow alarms to the Control Room on all wet pipe sprinkler systems.

Response

-Water flow alarms will be provided as indicated in Duke Power's November 22, 1977 submittal.

Question 22 Describe the water demands that could be placed on the HPSW system in addition to fire flow requirements.

Identify any other normal demands supplied by the HPSW system.

Response

The HPSW System.is also used to supply the following loads:

LOAD MAX. FLOW (gpm)

FREQ. OF USE

'CCW Pump Cooling & Sealing 90 Continuous HP.Inj. Pump

. Motor. Cooling 27 Continuous HPSW Motor Cooler

.106 Continuous 53 gpm Efor each.HPSW pump in use.

223 gpm

g i

HPSW Syntem C*preitv:

~

2 - HPSW Pumps @ 6,000 gpm 1 - HPSW Jockey Pump @ 500 gpm Question 23 Identify locations where the HPSW pumps can be started manually.

Response

With DC power available to B1T and B2T (HPSW) Switchgear, pumps can be started from the Control Room or at the switchgear.

If DC power is not available, the pumps can be started at the switchgear.

Question 24 Describe the potential for a single piping break to cause loss of automatic and normal fire suppression capabilities in each area, including the Turbine Building.

This review should also address the effects of isolating a hydrant if damaged.

Response

The single piping break is being reviewed and conclusions will be provided by February 1, 1978.

Question 25 Describe the effects of the loss of electrical buses running along the wall of the Turbine Building and resultant effects on safe shutdown capability.

Response

The Oconee 4KV power system is a double bus system with each bus normally energized and in service. The system has the ability to lose one bus completely and still operate satisfactorily with the remaining bus.

With reg:.rd to question 25, the following tabulation applies:

LOCATION OF LOSS EFFECT 1.

Loss of busses in (a) 7KV power would be lost to 7KV Swgr.

Area of Transf. IT ITA and 1TB; this would have no effect and CTl (See Dwg. 0-976) on safe shutdown of the station.

(b) 4KV power from Transf. IT and CT1 would no longer be available to 4KV Bus 1, Unit 1 and 4KV Bus 2, Unit 1.

Breakers BIT-1, BIT-3, B2T-13 and B2T-11 would be opened to clear the transformers from the switchgear busses.

As 4KV Bus 1, Unit 1 feeding the Unit 1 switchgear would also be involved in the fire, Breakers B1T-6, ITC-14, ITD-14 and ITE-14 must also be opened to clear this bus.

Power to 4KV Bus 2, Unit 1 would be available utilizing available power from standby bus No. 2 fed thru B2T-8.

All safe shutdown systems would be fully operational.

,)

..)

LOCATION OF LOSS EFFECT

'2.

Loss of busses in (a) 7KV power would be lost to 7KV Swgr.

Area of Transf's.

2TA and 2TB.

This would have no effect 2T and CT2 (See Dwg.

on safe shuidown of the system.

0-1976)

(b) 4KV power from Transf. 2T and CT2 would no longer be available to 4KV Bus 1, Unit 2 and 4KV Bus 2, Unit 2.

In addition, the 4KV bus installed between Swgr. B1T, Compt. 7 and Swgr. 3B1T, Compt. 3 would be affected by the fire and would no longer by available.

Breakers B1T-13, B1T-11, B2T-1, B2T-3, B1T-7, 3B1T-1, 3B1T-5, 3TC-1, 3TD-1 and 3TE-1 would be opened to clear the transformers and associated affected busses from the switchgear busses.

Power from Standby Bus No. I would not be available for 4KV Bus No. 1, Unit No. 2 or for 4KV Bus No. 1 Unit No. 3.

Breaket B1T-8, 2TC-1, 2TD-1 and 2TE-1 would be opened to clear 4KV Bus No. 1, Unit No. 2, Breakers B1T-7, 3B1T-1, 3B1T-5, 3TC-1, 3TD-1 and 3TE-1 would be opened to clear 4KV Bus No. 1, Unit No. 3.

Power to 4KV Bus No. 2, Unit No. 2 would be available to Unit No. 2 auxiliaries utilizing avail <

able power from Standby Bus No. 2 fed thru B2T-6.

As the 4KV Bus No. 2, Unit 3 running from Swgr. B2T to Swgr. 3B2T is run inside the Turbine Building this bus is not effected by the fire and is available to serve the Unit No. 3 auxiliaries.

Power to Unit No. 3 auxiliaries would be available utilizing 4KV Bus 2, Unit No. 3 fed from Startup Bus No. 2, Transformer 3T or Transformer CT3. All safe shutdown sys-tems for all units would be available.

3.

Loss of busses in (a) 7KV power to 7KV Swgr. 3TA and 3TB would Area of Transf. CT3 be unavailable from Transf. CT3, however, located near Col.

power would still be available from Transf ES-27 (See Dwg. 0-2976) 3T if Unit No. 3 was in operation.

In any case, loss of power to Swgr. 3TA and 3TB has no effect on safe shutdown of the station.

(b) 4KV power from Transf. CT3 would no longer be available to 4KV Bus 1, Unit 3 and 4KV Bus 2. Unit 3.

In addition, the 4KV bus installed between Swgr. B1T, Compt. 7 and Swgr. 3B1T, Compt. 3 would be affectee by the fire and would no longer be avail-able.

Breakers B1T-7, 3B1T-1, 3B1T-5, 332T-5, 3TC-1, 3TD-1 and 3TE-1 would be opened to clear the transformer and associated affected busses from the switch gear busses.

Power from Standby 3us No. 1

)

LOCATION OF LOSS EFFECT would not be available for 4KV Bus No. 1, Unit No. 3.

As the 4KV Bus No. 2, Unit No. 3 is run between Swgr. B2T-7 and Swgr. 3 BIT-2 inside the Turbine Building, this bus is not affected by the fire and is available.

Power to 4KV Bus 2, Unit 3 would be available from Transf. 3T if Unit 3 was in service or from Standby Bus No. 2 (thru Swgr. Bkr. B2T-7) if Unit No. 3 was not in service.

Because of the double-bus scheme used at Oconee, all safe shutdown systems on Unit No. 3 would be fully operational utilizing power from Standby Bus No. 2.

Power for Units 1 and 2 would be availabic from their normal power sources or from Standby Bus No. 1 and Standby Bus No. 2.

All safe shutdown systems would be operational.

4.

Loss of busses in (a) 7KV power to 7KV Swgr. 3TA and 3TB would Area of Transf. 3T unavailable from Transf. 3T.

Power would!

located near Col.

be available to this switchgear from CS4-36a-b (See Transf. CT3, however, it is possible Dwg. 0-2976A) that a fire in this area would involve the switchgear.

In any case, loss of of 7KV Swgr. 3TA and 3TB would have no effect upon safe shutdown of the station.

(b) 4KV power from Transf. 3T would no longer be available to 4KV Bus 1, Unit 3 and 4KV Bus 2, Unit 3.

Breakers 3B1T-5 and 3B2T-1 would be opened to clear Transformer 3T from the sveichgear busses.

In addition, 4KV Bus No. 1, Unit No. 3 installed be-tween Swgr. 3B1T, Compt. 3 and the Unit 3 indoor 4KV switchgear would be effected by the fire and would no longer be avail-:

able.

Breakers B1T-7, 3B1T-1, 3B1T-5, 3TC-1, 3TD-1 and 3TE-1 would be opened to clear this bus.

Power from Standby Bus No. I would not be available for 4KV Bus No. 1, Unit No. 3.

Power to the Unit No. 3 indoor swgr. would be avail-able via 4KV Bus.2, Unit No. 3.

4KV Bus 2, Unit No. 3 can be energized using Standby Bus No. 2 or Transf. CT3 power fed thru Swgr. Breaker-3B2T-5. All safe shutdown systems would be fully operat-ional.

8

.~

.)

.]

Qu,* tion 26 Identify the location of ventilation air intake and exhaust ope 61ngs and describe the potential for smoke being drawn into air intakes after being exhausted from another area.

Response

The closest ventilation air intake is approximately 12 feet horizontally and 145 feet vertically from the unit vent. All exhaust from the Auxiliary Building is routed to the unit vent. Any products of combus-tion from a fire would be well diluted by exhaust taken from other areas of the Auxiliary Building prior to reaching the unit vent.

The exit velocity from the unit vent is approximately 3900 fpm which would tend to make it unlikely that smoke would be drawn into the intake. Thus the separation and exit velocity combine to minimize the occurrence of such an event.

The proximity of turbine building exhaust to the nearest Auxiliary Building air intake is approximately 12 feet horizontally and 7 feet vertically. The turbine exhaust is above this intake and fans of the upblast type are utilized.

The fan exit velocity is approximately 2400 fpm, therefore, the location and the exit velocity would tend to preclude the potential for combustion products being drawn into the Auxiliary Building intake.

See attachment No. 1 for the auxiliary intake and exhaust arrangement.

Question 27 Provide drawings on the Turbine Building ventilation system showing location of dampers and capacities of fans. Describe the capability of this system to remove smoke and heat from the Turbine Building.

Response

See attachments 2, 3 & 4 depicting the Turbine Building Ventilation System.

The Turbine Building ventilation fans remain in an operable status at all times.

Should a fire occur, they would be available to remove smoke and heat from the Turbine Building.

Since a fire would most likely occur on the operating level, or below, the fans would be at least 57 feet above the fire and hence, the probability of a mechanical or electrical failure due to heat generation by the fire itself would be very low due to dilution with cooler air adjacent to the fire zone.

If a fire were to occur closer to a fan or fans and this fire rendered the local fans inoperable, the remainder of the Turbine Building ventilation fans would be available for smoke and heat venting. With two fans inoperable, the total system capacity would be rendered only 6.2% which is more than adequate for smoke and heat vcnting.

l l

l

) ;.

c -] !;

g a g!,1 s.

g l.

l I

i j

i 3.

6 t, i,i i i

.ii 11 I' !

l.l,jp = y 2i e

m-

,1 1

- -. f. ~,

til ee j

l' 4

l 3

Iil !!! !! !.lli!

101 iL 1

i b

~6) 40 1]Np J4 bk.p,, sane 4

'r iF U..

3 Ii d>,:

4

":E FE 9

i n i : t-

, &, ;,i - e

. f"t u n..,

2 T

it }j!!!! -

S i

D 1

[

/

I lr, Nhi l'

l o k.

l o

dh i;

.ll, 2

q3) i i

y' 7 ;<

i at;

.4y#e~T;'i 36 ci p

7 I

',8..]

t.

g

.en )

, 4_,_

i

,.g

, cgm q

u a

1 ll ' y

@(

\\e

. 'l - y+ -

e s

111.

.{

e i

o e

. y.,.4l.[

~,.%

9

\\ _--

I l

j

)

l jl, M.'l

, i a

i u

i D

l l'! '

l' b.

g L,'.'?

~

-4 4,,

/! Q-)

i<

'.. o<>..

.=

s.

4) i..e s.

.l.

y-S i-

~

11 1 it=a

.j i b

. id 7't - ]

'T

[

G:-4t g

..t s

g c

.~

[f,

~g s

.x.

=-- w 2

2 :: w:

k, I

'.'." Y, '

.R y

(! j 4 g.,.

s,.

a., e ii,

i x

,...y.

I

,,,f # :

~ '

~ ; \\g

. b{..:.

4 'i

,] ",

y S

s 1

'.- b' n

h 'b..,,' &,

3 g

n.;

ij[

i' 4

,l^

v

~

mll~y

' f *<.p e

g_

a, s

e s ;

8 :.

g 9,)

! k! D i

3 3l 3

I e

97 -

..*i ji, y i

a

's

. t, l,i11 l

ft-

, i p

epl

~-

. e-g ril 3

Qs ;

g g

3

.e@

l ss ni t

2 s

o 1

4

--l e

,. ass b.

b-@

f t

c'

.)

s Qu tion 28 Provide information on the location of charcoal filters in relation to safety-related systems and the quality of charcoal in each filter.

Also, provide details of the analysis that indicates 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> is avail-able after loss of cooling air flow before ignition.

Response

Redundant fans, cross connected piping, and locked open filter inlet valves render incredible a loss of cooling air flow to the filters. However, for the postulated case of loss of air flow through a filter, the heatup time until charcoal ignition temperature is reached was determined using the following conservative assumptions:

(a) MHA iodine release to Reactor Building (b)

Iodine input to Penetration Room filter based on Reactor Building leak rate of one-fourth percent per day for the first day and one-eighth percent per day thereaf ter.

Iodine evenly distributed over a single filter (120 lbs. charcoal)

(c) No heat loss from filter (d)

Peak heating rate of 2630 btu per hour (e)

Specific heat for charcoal equals 0.2 btu per pound F (f)

Initial charcoal temperature equals 104F; charcoal ignition tempera-ture equals 660F.

An analysis based on the following relationship shows that there is at least five hours between loss of air flow and the time at which charcoal ignition temperature is reached.

This is ample time to start the stand-by fan and restore air flow.

Q = W c AT Where: Q = Btu required to increase charcoal temperature by AT W = 120 lbs. charcoal c = 0.2 Btu per pound F AT = 660 F - 104 F = 556 F Question 29 Describe the quantity and type of portable lights available for the fire brigade.

Response

Eight sealed beam portable lights and nine flash lights are available for fire brigade use.

s

.)

)

Question 30 Describe the number and availability of portable radios for use by

- ~

fire fighters.

Response

The following portable radios are available:

Security -- 12 Operations - 1 I-E

-2 In addition, there are two mobile units.

Question 31 Describe the method used to seal pipe penetrations in fire barriers.

Response

Where necessary to restrict air flow, pipe penetrations are sealed with either Moni-kote and Armaflex, similar to electrical penetrations, or with Armaflex.

d Question 32 Provide data showing the adequacy of fire doors, such as laboratory certifications for unlabeled fire doors and frames in required fire barriers.

Response

Data on fire door penetrations will be provided February 1,1978.

Question 33 Identify the systems in each fire area, including the Turbine Building, which are required for safe shutdown.

This information need not duplicate.

that provided in the response to staff request number 3 previously provided.

Response

Discussions regarding the separate shutdown facility will be held January 18, 1978.

e T

1

Qu -tion 34 a

Clarify the combustible loading tables contained in the fire protection layout drawings submitted December 31, 1976.

The following itens are not clear:

(1)

Fire loadings are provided for some rooms containing combustibles, but not for other rooms;

.(2) Total c mbustibles are provided only for certain rooms; (3) The sum of the total combustibles or even the individual room combustibles do not equate or even approximate the totals for oil and cable insulation provided at the bottom of the chart; (4) What type and quantity of combustible material is located in each fire area.

Response

This information was provided in the response to question 4 of the November 22, 1977 submittal.

4 l

........