Forwards IE Insp Rept 50-461/80-08 on 800414-30 & Notice of Violation
ML19310A715
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/14/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML19310A716 List:
References
NUDOCS 8006230049
Download: ML19310A715 (2)


See also: IR 05000461/1980008

Text

.

  • 4

Setig}

.,.

[

UNITED STATES

F"

 %

NUCLEAR REGULATORY COMMISSION

lh,

i "i'

ai

REGION 111

799 ROOSEVELT ROAD

-

/

GLEN ELLYN,ILLINols 60137

WAY t 4 g

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Gerstner

Executive Vice President

500 South 27th~ Street

Decatur, IL 62525

Gentlemen:

This refers to the inspection conducted by Mr. H. H. Livermore of this

office on April 14-30, 1980, of activities at the Clinton Power Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the

discussion of our findings with Messrs. G. Brashear, J. Hampton, and

others of your staff at the conclusion of the -inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection concisted of

a selective examination of procedures and representative records, obser-

varions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

.

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

<

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

,

taken.and the results achieved; (2) corrective action to be taken to avoid

further' noncompliance; and (3) the date when full compliance'will be

i

achieved,

l

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

"2, Title 10, Code of Federal Regulations, a copy of~this letter, the en-

closures, and your response to this letter will be placed in the NRC's

Public Document Room, creept as follows.

If the enclosures contain in-

formation that you or your contractors believe to be proprietary, you

<

must apply in writing to this office, within twenty days of your receipt

_

of this letter, to withhold such information from public disclosure.

,

80 06280 o g

.

.

.

.

-

...

.

' '

Illinois Power Company

-2-

MAY ? ' 000

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

. &, , m_ sAFL *

'

-

--

-

G. Fiore11i, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-461/80-08

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC