Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20141C2841997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Monticello Nuclear Generating Plant ML20137W2621997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Monticello Nuclear Generating Plant ML20136H1671997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Monticello Nuclear Generating Plant ML20134M7071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Monticello Nuclear Generating Plant ML20133J1401996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Monticello Nuclear Generating Plant ML20132A8771996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Monticello Nuclear Generating Plant ML20134L2761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Monticello Nuclear Generating Plant ML20128Q7831996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant ML20117M8161996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant ML20116M2991996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Monticello Nuclear Generating Plant ML20115H5651996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Monticello Nuclear Generating Plant ML20112J1921996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Monticello Nuclear Generating Plant ML20112A3121996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Monticello Nuclear Generating Plant ML20107E9831996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Monticello Nuclear Generating Plant ML20106H0591996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Monticello Nuclear Generating Plant ML20100G5031996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Monticello Nuclear Generating Plant ML20096C8061995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Monticello Nuclear Plant ML20095G0231995-11-30030 November 1995 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20094L1921995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Monticello Nuclear Generating Plant ML20093E6241995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant ML20092F4121995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Monticello Nuclear Generating Plant ML20087H3011995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Monticello Nuclear Generating Plant ML20086K1731995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2061999-10-12012 October 1999 Safety Evaluation Supporting Amend 106 to License DPR-22 ML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-007, :on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With1999-07-0909 July 1999
- on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With
05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With1999-07-0202 July 1999
- on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With
ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-005, :on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With1999-06-0707 June 1999
- on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With
ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With 05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With1999-05-24024 May 1999
- on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With
05000263/LER-1999-003-01, :on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With1999-05-12012 May 1999
- on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With
05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With1999-05-11011 May 1999
- on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With
ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205C1651999-03-19019 March 1999 Safety Evaluation Supporting Amend 105 to License DPR-22 ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With1999-03-17017 March 1999
- on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With
ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198M8221998-12-24024 December 1998 Safety Evaluation Supporting Amend 104 to License DPR-22 ML20198M6901998-12-23023 December 1998 Safety Evaluation Supporting Amend 103 to License DPR-22 ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv 05000263/LER-1998-005-01, :on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve1998-10-21021 October 1998
- on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve
05000263/LER-1998-004-02, :on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked1998-10-0909 October 1998
- on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked
ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20151T0981998-08-28028 August 1998 Safety Evaluation Supporting Amend 101 to License DPR-22 ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced1998-05-14014 May 1998
- on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced
05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed1998-05-14014 May 1998
- on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed
ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-001-02, :on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment1998-04-22022 April 1998
- on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment
ML20217E9611998-04-20020 April 1998 Safety Evaluation Supporting Amend 100 to License DPR-22 ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant 1999-09-30
[Table view] |
Text
.
THIS DOCUMENT CONTAINS 800526067I O
gooa cuauTv enats j NARRATIVE SIM4ARY OF OPERATING EXPERIENG DOCKET NO.
50-263 INIT
, A nticello DATE 5-2-80 COMPLETED BY A. L. Myrabo TELEPHONE
'612/295-5151 f.0VIII April 4-1-80 to Continuation of 1980 refueling outage.
4-3-80 4-4-80 Reactor critical for physics testing and reactor heat-up.
4-5-80 Generator on-line prior to turbine overspeed test. Turbine overspeed test completed.
4-6-80 Power operation at essentially 100% of rated power except for weekend to surveillance testing and control rod adjustments.
4-18-80 4-19-80 Reactor scram on turbine trip due to reactor high level. Trip was received while attempting orderly shutdown because of failed recirc pump seals.
4-26-80 Scheduled outage to repair recirc pump seals-hUfE: Reactor was in a shutdown condition prior to the start of this outage.
4-28-80 Generator on-line for power operation.
4-29-80 Orderly shutdown due to failure of recirc pump seal, to 4-30-80
s MAY 1 3 1980 OPERATING DATA REPORT DOCKET NO.
50-263_______
DATE 5-2-80____
COMPLETED BY A.
L.
Myrabo TELEPHONE 612/295-5151 OPERATING STATUS l Notes l
1 Unii h o.io
__. __itonticelto l
l
'. '. Reportinq peitod: __._.
APRIL l
l
.5. L i c tmsed Therraa l Power (MWt): _ ____ _ __ 1670 l
l 4.
Naraepiate Ratang (Gioss Mue) 569 l
l S.
im s 9 n Electrical Rating (Net MWe)
_. ___545.4 l
l 6.
M a x iva.ua Dependable Copacity (Gross MWe)
__564 l
l 7.
tu rinnua Dependahle Capacity (Net hdGl
_S36 I.__.._.__.__.____-_--._----.-I
.l.
It Chan9es Occur in Capacity Ratings (Iterns Nurnber 3 1hrough 7) Since Last Repnr t, Give Rea<ons: _ _. N / A _...
Pow r> r ievel 1.6 Which i<estracted, 'i
__tUA________.__.__._..__
,(
R. m 3 0... For 1'
.tvicttons, If Any*
.tUA___.__________.___.____.______*_
-.L This Month Yr.-to-Date Curnulative i1. Hours In Reporting Period
_____719
____2903
___ 77440
- 12. N urnber Of Hours Reactor Was Critical
___415.5
__ 1639.1
__ 63170.0
- 13. Reactor Reserve Shutdown Hours 0.0
__0.0
_._._._ 9 4 0. 7
- 14. Hours Generator On-Line
___360.6
___i571.7
_. 61541.0
- 15. Unit Reserve Shutdown Hours
_____0.0
.___ _ 0.0
__0.0
- 16. Gross Therrna l Energy Generated (MWH)
._ 536251
_ 2090129
_101032991
- 17. Gross Electrical Energy Generated (MWH) _ 182410
__ 703560
_ 31681620
- 10. Net Electrical Energy Generated (MWH)
_ 173908
__ 668750
__30300954
- 19. Unit Service Factor
__ 50.2%
_._ 54.1%
__ _ 79.5%
- 20. Unit Availability Factor
__ 50.2%
___ 54.1%
____ 79.5%
- 21. Unit Capacity Factor (Using.MDC Net)
__ 45.1%
__ 43.0%
._. 73.0%
- 22. Unit Capacity Factor (Using DER Net) 44.3%
42.2%
_ __ 71.7%
- 23. Unit Forced Outage Rate 35.2%
__ 11.5%
6.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Ty' Date, and Duration of Each)
__ March 20, 1981 - Refueling Outage - 56 days ____ ___.___.________________ _
- 25. If Shut Down At End Of Report Period, Estirnated Date Of Startup:__05-16-80__
- 26. Units In Test Status (Prior to Corarnerc i a l Opera t lon). N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
__.___2_
=
\\
AVERAGE DAILY UNIT POWER LEVEL f
DOCKET NO.
50-263._.__
UNII MonticeLLo DATE 5-2-00_____
COMPLETED BY A.
L.
Myrabo TELEPHONE 612/295-5151 hfir4 l Il
....APhlL I> A Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.
1
( ttWe-Ne t >
(MWe-Net) 4 1
3..-
17 550_ - _ - _ __
."a
-~4____-
10
_- __546_
l
_.._._-5.._._..
19
_365__.__.
.{
l 4
_.__-5..~._.__.__.._
20
-5 S-79__ _
'i
-5__
6
_370..
22
_ _ -4 7
._506 23-
-3_
O
_ __...__...527._
24
_______-4_.________.
V
_ __ _5i9..
25
___._ ___ -4 _ _ __._ _.__
P i
2 10
_ _ _.. _._ _ S. i B -
26
- 4 7
11
_ 5 1 7.._._ _...._ _
27
-5._
i'
_ ___.. _ _508 __. __
28
_ _ _. 1 3 7 _ _
13
_473-_._____
29
_____._2i______.__._
'14
._ __.____ _547...__._
30
___.._ _ -4 3
15
_ 551 _._ _____.___.
31 16
__________547____________
t INSTRUCTIONS-On this format, tist~the average daily unit power level in MWe-Net for e-Och ddy in.the, reporting-Month.
Compute to the nearest whole megawatt.
1 0,
y.
UNIT SIIUTDOWNS \\ND POhER REDUCliONS
. DOCKET NO.
50-263 UNIT N etE Moriticello DATE 5-Z-80 REPORT \\10NTil April CO%1PLETED BY A. L. Myrabo TELEPHONE 612/295-5151 I
"w 1,
5 I'2 g
cause a coneciise N...
DJie
~
y a
e-=
1.5 4.-
A..en...
R e ort :
v: s 32g
,} -
Present Recurrence
==
-z
- 5 4'
4-1-80 S
101.6 C
4 N/A ZZ ZZZZZZ Continuation of 1980 Refueling Outage.
5 4-5-80 S
3.2 B
1 N/A IIA
'IURBIN Turbine overspeed test 6
4-19-80 F
151.2 A
3 N/A CB PtNPXX Turbine' trip on high level while re-ducing power after recirc pump seal failure. Seals on both recirc pumps replaced.
17,
.4-26-80 S-57.5 A
4 N/A CB IWIPXX Outage taken to repair recirc punp seal.
N0lI: Reactor was in s shutdown con dition prior tothe start of this outage.
i 8
4-29-80 F
44.8 A
1 N/A CB PtNPXX Plant shutdown to repair recirc punp seal.
I 2
3 4
F: Forced Reason:
Method:
Edubii G - Inst ructions S Schedulet!
A Equ;pment Failure (Explain)
!-Manual
' for Preparation of Data B. Maintenance or Test 2 Manual Scram.
Entry Sheets fer Licensee
- C Refueling 3 Automatic Scram.
Esent Report (LER) File t NUREG.
D Regulator) Restriction 4 Other (Explaini 0161)
E-Operator Training & License Examination.
F-Administrati.e 5
G. Operational Error (Explain t Exhibit I - Same Source 19/77)
Il Other (Explaint