ML19309H796

From kanterella
Jump to navigation Jump to search
Advises That IE Info Notice 80-20, Loss of Decay Heat Removal Capability at Davis-Besse Unit 1 While in Refueling Mode, Was Sent to Listed Utils in 800508
ML19309H796
Person / Time
Site: Dresden 
Issue date: 05/12/1980
From: Pappas H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8005190728
Download: ML19309H796 (3)


Text

'

TIC 8005190 anog

/

o UNITED STATES E'

',g NUCLEAR REGULATORY COMMISSION ir REGION lil o,,

[

799 ROOSEVELT ROAD

%.....[

GLEN ELLYN,ILLINOls 60137 MY I 2 W MEMORANDUM FOR: Those on Attached List FROM:

Helen Pappas, Chief, Administrative Branch

SUBJECT:

IE INFORMATION NOTICE 80-20 The attached IE Information Notice 80-20 titled " Loss of Decay Heat Removal Capability at Davis-Besse Unit 1 While in a Refueling Mode" was sent to the licensees listed below on May 8, 1980:

American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)

Cincinnati Gas & Electric Company Zimmer (50-358) 1 Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)

Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)

Byron 1, 2 (50-454, 50-455)

Dresden 1, 2, 3 (50-10, 50-237, 50-249)

L Salle 1, 2 (50-373, 50-374)

Quad-Cities 1, 2 (50-254, 50-265)

Zion 1, 2 (50-295, 50-304)

Consumers Power Company Big Rock Point (50-155)

Midland I, 2 (50-329, 50-330)

Palisades (50-255)

Dairyland Power Cooperative LACBWR (50-409)

Detroit Edison Company Fermi 2 (50-341)

Illinois Power Company Clinton 1, 2 (50-461, 50-462)

I

\\

1 Those on Attached List -

Iowa Electric Light & Power Company Duane Arnold (50-331)

Northern Indiana Public Service Company Bailly (50-367)

Northern States Power Company Monticello (50-263) 1 Prairie Island 1, 2 (50-282, 50-306)

Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)

Toledo Edison Company Davis-Besse 1 (50-346) 3 Union Electric Power Company Callaway 1, 2 (50-483, 50-486) l Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301) 1 Wisconsin Public Service Corporation i

Kewaunee (50-305) 2

[

Helen Pappas, Chief Administrative Branch 1

Enclosure:

IE Information Notice No. 80-20 4

s Addressees - Memorandum dated May 9, 1980 Central Files Reproduction Unit NRC 20b l

1 l

5

SSINS No.:

6870 UNITED STATES Accession No.:

NUCLEAR REGULATORY COMMISSION 8002280671 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 May 8, 1980 IE Information Notice 80-20 LOSS OF DECAY HEAT REMOVAL CAPABILITY AT DAVIS-BESSE UNIT 1 WHILE IN A REFUELING MODE Description of Circumstances:

On April 19, 1980, decay heat removal capability was lost at Davis-Besse Unit 1 for approximately two and one-half hours.

At the time of the event, the unit was in a refueling moda (e.g., RCS temperature was 90F; decay heat was being removed by Decay Heat Loop No. 2; the vessel head was detensioned with bolts in place; the reactor coolant level was slightly below the vessel head flanges; and the manway covers on top of the once through steam generators were removed).

(See Enclosure A, Status of Davis-Besse 1 Prior to Loss of Power to Busses E-2 and F-2 for additional details regarding this event.)

Since the plant was in a refueling mcde, many systems or components were out of service for, maintenance or testing purposes.

In addition, other systems and components were deactivated to preclude their inadvertent actuation while in a refueling mode.

Systems and components that were not in service or deactivated included:

Containment Spray System; High Pressure Injection System; Source Range Channel 2; Decay Heat Loop No. 1; Station Battery IP and 1N; Emergency Diesel-Generator No. 1; 4.16 KV Essential Switchgear Bus C1; and 13.8 KV Switchgear Bus A (this bus was energized but not aligned).

In brief, the event was due to the tripping of a non-safeguards feeder breaker in 13.8 KV Switchgear Bus B. Because of the extensive maintenance and testing activities being conducted at the time, Channels 1 and 3 of the Reactor Protec-tion System (RPS) and Safety Features Actuation System (SFAS) were being ener-gized from only one source, the source emanating from the tripped breaker.

Since the SFAS logic used at Davis-Besse is a two-out-of-four input scheme in which the loss (or actuation) of any two input signals results in the actuation of all four output channels (i.e., Channels 1 and 3, and Channels 2 and 4), the loss of power to Channels 1 and 3 bistables also racn N d "-^"*

~"

Channels 2 and 4.

The actuation Decay Heat Loop No. 2, the opera Since the initiating event was a DUPLICATE DOCUMENT were actuated (i.e., Level 1 - Hi tion; Level 3 - Low Pressure Inj Entire document previously entered into system under:

ANO O

No. Of es-

- -..