UNITED STATES
T10'
J 005130 W7
[(p"%'o
.
'
.
NUCLEAR REGULATORY COMMISSION
'
>7
g
"f,
c
REGION lli
% . . . . g*[
799 ROOSEVELT ROAD
e
o,
.
GLE N E LLYN, ILLINols 60137
,
80Ut21 360
.
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plante
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the inspection conducted by Mr. J. D. Smith of this office
on February 19 and 20, 1980, of activities at the Point Beach Nuclear
Plant, Units 1 and 2 authorized by NRC Operating License No. DPR-24 and
DPR-27 and to the discussion of our findings with Mr. G. A. Reed at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspe< tion. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
Because of the nature of the noncompliance, we consider it important that
we discuss the results of the inspection directly with you and with appro-
priate members of your staff. Accordingly, such a meeting has been sche-
duled for April 8 , 1980 at the Point Beach site.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office within twenty
days of your receipt of this notice a written statement or explanation in
reply, including for each item of noncompliance:
(1) corrective action
taken and the results achieved; (2) corrective action to be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the en-
closures, and your response to this letter will be placed in the NEC's
Public Document Room, except as follows.
If the enclosures contain in-
formation that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
.
Wisconsin Electric Power
-2-
.
Company
M 21 M
of this letter, to withhold such information from public disclosure.
The application must include a full statement of the reasons for,which
the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained
in an enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. F. Heishman, Chief
' Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-266/80-04;
and No. 50-301/80-03
cc w/ enc 1:
Mr. G. A. Reed
Plant Manager
Central Files
Reproduction Unit NRC 20b
Local PDR
Sandra A Bast, Lakeshore
Citizens for Safe Energy
Mr. John J. Duffy, Chief
'
Boiler Inspector, Labor and
Human Relations
i
.
l
-
,