Forwards IE Insp Rept 50-483/80-05 on 800201-29 & Notice of Violation
ML19309H322
Person / Time
Site: Callaway 
Issue date: 03/24/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19309H323 List:
References
NUDOCS 8005130046
Download: ML19309H322 (2)


See also: IR 05000483/1980005

Text

.

',

' p'"%

8 0 0513 y cyg

  1. 'o

UNITED STATES

+

!'

'n

NUCLEAR REGULATORY COMMISSION

IlC -

'

, . , . ,

'" '

E

REGION ill

$'

'

[

799 ROOSEVELT ROAD

O,

.

[

GLEN ELLYN,ILLINols 60137

  • ....

NAR 2 4 neo

.

Docket No. 50-483

.

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. W. A. Hansen of this

office during the period of February 1-29, 1930, of activities at the

Callaway, Unit 1, construction site authorized by NRC Construction

Permit No. CPPR-139 and to the discussion of our findings with Mr. Weber

and others of the Callaway staff at the contlusion of the inspection.

The enclosed copy of our inspection report identifiec areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office with-

in thirty days of your receipt of this notice a written statement or

explanation in reply, including for each item of noncompliance: (1) cor-

rective action taken and the results achieved; (2) corrective action to

be taken to avoid further noncompliance; and (3) the date when full com-

pliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures contain in-

formation that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

THIS DOCUMENT CONTAINS

P00R QUALnY PAGES

-

-

.

_

.

,

,

.

Union Electric Company

-2-

MAR 2 4 E80

.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

e

G. Fiore11i, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-483/80-05

cc w/ enc 1:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

'

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

i

TIC

Regions I & IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

Division, Missouri Public

Service Commission