Forwards IE Insp Rept 50-269/80-06 on 800123-30.No Noncompliance Noted
ML19309G973
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/20/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19309G974 List:
References
NUDOCS 8005080076
Download: ML19309G973 (2)


See also: IR 05000269/1980006

Text

pg76

8005

0

nu g

UNITED STATES

,j

4, .

8

NUCLEAR REGULATORY COMMISSION

o

e

REGION 11

.

o

101 MA91ETTA ST., N.W SUITE 3100

o

ATi.ANTA, G EORGIA 30301

MAR 2 01980

In Reply Refer To:

.

RII:HLW

50-269/80-06

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by H. L. Whitener of this office on

January 23-30, 1980 of activities authorized by NRC Operating License No. DPR-38

for the Oconee facility, and to the discussion of our findings held with J. E. Smith

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

,

document. If we do not hear from you in this regard within the specified period,

,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

p.c.

'

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

,

Enclosure:

See Page 2

-

.

9

.

_ _ _ _ _ _ _ _ _ - _ _ _ _ _

_ - - . . .

- _ . - . . .

.

- - - - . - -

- - - - . - - - - - - -

. - . - - . . . - .

, .

'

MAR 2 01980

Duke Power Company

-2-

.

Enclosure:

Inspection Report No. 50-269/80-06

'

'

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box 1175

Seneca, SC 29678

i

tr