ML19309G893
| ML19309G893 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 03/24/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML19309G894 | List: |
| References | |
| NUDOCS 8005070743 | |
| Download: ML19309G893 (2) | |
See also: IR 05000339/1980010
Text
8 0 05 070 7 %g
'
,
,,
/
- o
UNITED STATES
8
1
NUCLEAR REGULATORY COMMISSION
5"U7
g
,e
REGION il
'
'#
o
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
.....
.
MR 2 41980
In Reply Refer To:
RII:PJK
50-339/80-10
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by P. J. Kellogg of this office on
February 20-22, 1980 to verify the status of implementation of the Three Mile
Island Action Plan items concerning management for operations and technical
competence and to the discussion of our findings held with C. M. Stallings at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) celieve to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
nation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
,
'
Should you have any questions concerning this letter, we will be glad to discuss
- j
them with you.
Sincerely,
!
f.C.
R. C.
was, Acting Chigf
Reactor Operations and Nuclear
Support Branch
-
e
Enclosure:
See Page 2
l
- - .
.
. . . - .
. . - _ _ -
-
.
,.
_
._
. -
. . ~
_
..---... ... . -. .........-... -
. - . . . . . . - . . - . .
-
- , . .
-.
.
,
.
Virginia Electric and Power Company
-2-
.
i
f
i
Enclosure:
Inspection Report No. 50-339/80-10
,
_
,
cc w/ enc 1:
,
W. R. Cartwright, Station Manager
,
Box 402
Mineral, VA 23117
P. G. Perry
Senior Resident Engineer
P. O. Box 38
Mineral, VA 23117
.