Forwards IE Insp Repts 50-491/80-04,50-492/80-04 & 50-493/80-04 on 800304-07.No Noncompliance Noted
ML19309G218
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 03/27/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19309G216 List:
References
NUDOCS 8005050148
Download: ML19309G218 (2)


See also: IR 05000491/1980004

Text

,

.

f %'o,,

,

8

NUCLEAR REGULATORY COMMISSION

O 005 e roNf

UNITED STATES

n

$

aE

REGION 11

v'

o

101 MARIETTA ST

N.W., SulTE 3100

ATLANTA, GEORGIA 30303

%

o

M 27 g

In Reply Refer To:

RII:NE

50-491/80-04

50-492/80-04

50-493/80-04

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by N. Economos of this office on March 4-7,

1980 of activities authorized by NRC Construction Permit Nos. CPPR-167, CPPR-168

and CPPR-169 for the Cherokee facility, and to the discussion of our findings

held with C. B. Aycock at the conclusion of the inspection.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this Id ter, we will be glad to discuss

,

them with you.

,

Sincerely,

1

l*f

M

C. E. Murphy, Chief

Reactor Construction and

,

Engineering Support Branch

l

Enclosures:

(See Page 2)

l

.

_

,w

_- + --, .-.-

-.w.m-=

+w

= = ~ -

= **

-- ..x

.

. = . .

.

_ . =

... a..:.

-

-

--

-

_

- - - - -

- - = - -

.-

.

--

.

.

!

!

I

,

~$

Duke Power Company

-2-

MAR 2 71980

i

.

Enclosures:

Inspection Report Nos. 50-491/80-04,

50-492/80-04 and 50-493/80-04

,

,

I

l

cc w/ encl:

'

J. T. Moore, Project Manager

,

P. O. Box 422

!

'

Gaffney, SC 29340