f %'o,,
,
8
NUCLEAR REGULATORY COMMISSION
O 005 e roNf
UNITED STATES
n
$
aE
REGION 11
v'
o
101 MARIETTA ST
N.W., SulTE 3100
ATLANTA, GEORGIA 30303
%
o
M 27 g
In Reply Refer To:
RII:NE
50-491/80-04
50-492/80-04
50-493/80-04
Duke Power Company
ATTN:
L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by N. Economos of this office on March 4-7,
1980 of activities authorized by NRC Construction Permit Nos. CPPR-167, CPPR-168
and CPPR-169 for the Cherokee facility, and to the discussion of our findings
held with C. B. Aycock at the conclusion of the inspection.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this Id ter, we will be glad to discuss
,
them with you.
,
Sincerely,
1
l*f
M
C. E. Murphy, Chief
Reactor Construction and
,
Engineering Support Branch
l
Enclosures:
(See Page 2)
l
.
_
,w
_- + --, .-.-
-.w.m-=
+w
= = ~ -
= **
-- ..x
.
. = . .
.
_ . =
... a..:.
-
-
--
-
_
- - - - -
- - = - -
.-
.
--
.
.
!
!
I
,
~$
Duke Power Company
-2-
MAR 2 71980
i
.
Enclosures:
Inspection Report Nos. 50-491/80-04,
50-492/80-04 and 50-493/80-04
,
,
I
l
cc w/ encl:
'
J. T. Moore, Project Manager
,
P. O. Box 422
!
'
Gaffney, SC 29340