UNITED STATES
4
800 0 Mop
5
j
Y ,, 4'h
o
e-
'
.
NUCLEAR REGULATORY COMMISSION
REGION 111
e
199 ROOSEVELT ROAD
k
O[
GLEN E LLYN, ILLINols 60137
'%
.
MAR 21580
.
Docket No. 50-483
Union Electric Company
ATTN:
Mr. John K. Byron
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Messrs. H. M. Wescott, K. Naidu,
and E. W. K. Lee of this office on February 12-15, 1980, of activities at
Callaway Unit 1 authorized by NRC Construction Permit No. CPPR-139 and to
the discussion of our findings with Mr. Weber and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection.
Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence.
Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary in-
formation identified in the application is contained in an enclosure
to the application.
.
.
i
Union Electric Company
-2-
,
MAR 21.560
We will gladly discuss any questions you have concerning this
inspection.
.-
Sincerely,
,s
d.'Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-483/80-04
cc w/ enc 1:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
Region I and IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
.