Forwards IE Insp Rept 50-483/80-04 on 800212-15 & Notice of Violation
ML19309G181
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/21/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Byron J
UNION ELECTRIC CO.
Shared Package
ML19309G182 List:
References
NUDOCS 8005050099
Download: ML19309G181 (2)


See also: IR 05000483/1980004

Text

_ _.

[

%,

UNITED STATES

4

800 0 Mop

5

j

Y ,, 4'h

o

e-

'

.

NUCLEAR REGULATORY COMMISSION

REGION 111

e

199 ROOSEVELT ROAD

k

O[

GLEN E LLYN, ILLINols 60137

'%

.

MAR 21580

.

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Byron

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Messrs. H. M. Wescott, K. Naidu,

and E. W. K. Lee of this office on February 12-15, 1980, of activities at

Callaway Unit 1 authorized by NRC Construction Permit No. CPPR-139 and to

the discussion of our findings with Mr. Weber and others of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence.

Consequently, no reply to this

noncompliance is required and we have no further questions regarding this

matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure

to the application.

.

.

i

Union Electric Company

-2-

,

MAR 21.560

We will gladly discuss any questions you have concerning this

inspection.

.-

Sincerely,

,s

d.'Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-483/80-04

cc w/ enc 1:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Region I and IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

.