Text
(
8005050 DT/
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING B0ARD In the matter of
)
)
Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
et a1
)
(Control Building Proceeding)
')
(Trojan Nuclear Plant)
)
LICENSEE'S SUPPLEMENTAL RESPONSES DATED FEBRUARY 29, 1980 TO INTERROGATORIES FROM THE INTERVENORS The following are Licensee's supplemental responses dated February 29, 1980 to Interrogatories received from the Coalition for Safe Power and the Consolidated Intervenors (Intervenors).
]
Persons responding to each Interrogatory are indicated by their ini ials t
as follows:
Ronald W. Johnson, PCE (RWJ)
Lief W. Erickson, PGE (LWE)
Richard C. Anderson, Bechtel (RCA)
I.
COALITION FOR SAFE POWER'S INTERROGATORIES DATED SEPTEMBER 6,1978 Interrogatory 3
" Provide all minutes of Board of Directors meetings at which the matter of the Trojan control building was discussed or issues related to Trojan shut down."
Supplemental Response to Interrogatory 3 Provided as Attachment 3-1 hereto are relevant portions of Board
~
of Directors' meeting minutes since the last supplemental response dated August 20, 1979.
(RWJ)
II.
INTERROGATORIES DATED JANUARY 29, 1979 FROM NINA BELL OF CONSOLIDATED INTERVENORS Interrogatory 8
" Explain hoc and when reviews will be made to confirm the seimie (sic] quiaification (sic] of safety related equipment following the modifications to the Control Building."
Supplemental Response to Interrogatory 8 Due to changes in the response speccra widening as described in Licensee's response dated December 21, 1979 to NRC Questions 20 and 21 of October 2,1979, the analyses referred to in our previous response dated August 20, 1979 to this Interrogatory are no longer complete. Any additional changes in response spectra may require further reviews of equipment seismic qualification.
(RCA)
III.
CONSOLIDATED INTERVENORS' INTERROGATORIES DATED FEBRUARY 9, 1979 Interrogatory 1 "What contractor (s) and subcontractor (s) will be responsible for the design modifications?"
Interrogatory 2 "For the modifications themselves?"
l l
- l
ATTAC1DiENT 3-1 LICENSEE'S SUPPLEMENTAL RESPONSES 2/29/80 TO INTERV7.NORS' INTERROGATOI PAGE 1 0F 1 p
ia. o-suer se c***"'
8.
~ ~ - - ~
Augus t 1,19 79 Mr. Broehl reported that Company representatives had met with Bechtel and the NRC in San Francisco to answer the last s ignif icant list of questions raised by the NRC over the proposed design to repair the Trojan control room wall.
A hearing on the repair design had been scheduled to commence on Cetoter 10, 1979.
If the currently proposed design is approved, very little extra shutdown time will be required to implement it.
r
t Supplemental Response to Interrogatory 2 The only subcontractor chosen to date is Pettijohn Engineering, Portland, Oregon, to perform surveying work.
(RCA)
Interrogatory 41 "What existing structures will be removed?"
Supplemental Response to Interrogatory 41 Licensee's response dated March 1,1979 to this Interrogatory incorrectly described the ladder with safety cage and steel plat-form as providing access to the Turbine Building roof.
The subject ladder and platform do not lead to the roof but do serve the Turbine Building crane.
(LWE)
Interrogatory 44 "Where will excavation go through floor slab and to rock foundation?"
Supplemental Response to Interrogatory 44 Item (2) of Licensee's response dated March 1, 1979 to this Inter-rogatory should be corrected to read "On column line N' between lines 41 and 46."
(RCA)
IV.
INTERROGATORIES DATED JUNE 30, 1979 FROM EUGENE ROSOLIE AND COALITION FOR SAFE POWER Interrogatory 9 "In response to Consolidated Ini.arvenors Interrogatory 7 Licensee states, 'They will be given training...'
How long will this training last? Who will do the Training?
Provide a copy of Trojan Administrative Order Ao-9-1." l
i Supplemental Response to Interrogatory 9 Supplied herewith as Attachment 9-1 is the current Revision of A0-9-1 which supersedes the revision supplied with the July 19, 1979 response to this Interrogatory.
(LWE)
V.
INTERVENORS' INTERROGATORIES DATED AUGUST 27, 1979 i
Interrogatory 19
" Provide timelines for performance of the following tasks 1-2 outlined in PGE 1020.
Include seperate [ sic] time-line for installation of steel plates as outlined in Responses to NRC Questions Raised During the June 13-14 Visit."
Supplemental Response to Interrogatory 19 The attached time line chart (Figure 19-2) provides our current esti-mate of time for various activities within the modification program.
As stated in Licensee's previous response dated September 17, 1979 to this Interrogatory and as indicated in PGE-1020, the construction sequence may be altered.
This time lines chart does not reflect all of the conditions proposed by the NRC Staff in the February 14, 1980 Safety Evaluation Report.
(RCA)
Interrogatory 21 "At the prehearing conference on March 29, 1979, the ASLB admitted CFSP contention #3 which states that ' Plant Staff review of proposed modification is inadequate to assure no violations of Technical Specifications will occur.'
Provide all LERs that have occured [ sic] since December 1978 that were due to Technical Specifications violations.
Also provide a review of those LERs by Plant Staff and Nuclear Operations Board." _
vnuuninULLD CD'oy NOT UP9p p PORTLAND GENERAL ELECTRIC COMPANY ATTACHMENT 9-1 LICENSEE'S SUPPLEMENTAL IROJAN NUCLEAR PLANT M SPONSES 2/29/80 TO INTERVENORS' INTERROGATORIES September 17, 1979 SAFETY-RELATED PAGE 1 0F 4 Revision 6 ADMINISTRATIVE ORDER - A0-9-1 PERSONNEL INDOCTRINATION APPROVED BY
>t /
DATE ' II 7 O
d PURPOSE All individuals requiring unescorted access to the Trojan Plant will receive training in the following areas:
Radiation Protection, Prenatal Radiation Exposure, Security, Safety, Emergency Plan Response, Quality Assurance and Fire Protection.
This order details the specific training to be received in each area as well as the frequency of retraining.
In addition, a section on new Trojan PGE employee training is included.
ORDERS All individuals will receive training as described below:
I.
RADIATION PROTECTION A.
All individuals whose job requires access to controlled areas will participate in radiation protection training.
The training will be conducted in two parts.
The first part will consist of a live lecture and/or a video tape presentation.
A written examination will be administered to all persons receiving this training.
A grade of less than 70% will be cause for the employee to receive addi-tional training.
The Training Supervisor will determine the extent and nature of any additional training which is required g.e second part of this training will include the donding and removal of anti-contamination clothing, exiting from a controlled area, personnel frisking techniques, reading dosimeters, recording information on radiation work permits and control of contaminated gear.
A0-9-1 Page 1 of a Revision 6
B.
All individuals working in or frequenting any portion of a radiologically restricted area will be instructed in the biological risks to embryos or fetuses resulting from prenatal radiation exposure.
The instructions will be presented both orally and in written form.
Each individual will be given an opportunity to ask questions.
C.
Radiation Protection retraining will be conducted yearly for all personnel.
Plant radiation protection and chemistry personnel may be exempted from this training at the discretion of the Radiation Protection Supervisor.
II.
' SECURITY A.
All individuals will participate in a training session on plant security.
A live lecture and/or a video tape presentation may be used for this training.
A written quiz will be administered following the training session.
A grade of less than 70% will be cause for additional instruculon.
The nature and extent of this additional training will be determined by the Training Supervisor.
B.
Security retraining will be conducted yearly.
III.
SAFETY TRAINING All individuals will participate in a training session on plant safety.
A live lecture and/or a video tape presentation may be used for this training.
A written quiz will be ad-ministered following the training session.
A grade of less chan 70% will be cause for additional instruction.
The nature and extent of this additional training will be determined by the Training Supervisor.
Continuing bimonthly safety-related lectures vill be made available to all Trojan PGE employees.
The topics for these lectures will be determined by the plant Safety Coordinator.
IV.
RADIOLOGICAL EMERGENCY RESPONSE PLAN A.
All individuals will participate in a training session on the Trojan Radiological Emergency Response Plan.
A live lecture and/or a video tape presentation may be used for this training.
The training received will stress recogni-tion of alarms and potential problems as well as the individual action for various emergency conditions.
B.
Radiological Emergency Response Plan retraining will be conducted every two years.
A0-9-1 Page 2 of 4
- 4 Re-ision 6 ATTACHMENT 9-1 LICENSEE'S SUPPLEMENTAL M:SPONSES 2/29/80 TO INTERVENORS' INTERROGATORI PAGE 2 OE 4
.4 V.
QUALITY ASSURANCE A.
All individuals will participate in a Quality Assurance 4
Training Program.
A live lecture and/or a video tape presentation may be used for this training.
The Quality Assurance Supervisor will be responsible for establishing and maintaining the content of this training program.
B.
Quality Assurance retraining will be conducted every two years.
VI.
FIRE PROTECTION TRAINING A.
All individuals will participate in a training session on fire protection.
Instruction will be provided in the proper procedures for fire prevention, for bringing fires under control and in the use of proper evacuation routes.
A live lecture and/or video tape presentation may be used for this training.
B.
Fire protection retraining will be conducted annually.
VII.
NEW TROJAN PCE EMPLOYEE INDOCTRINATION AND TRAINING A.
All full time employees will be trained to the levels described in Sections I through VI of this order.
The Training Section will arrange with the other sections involved to schedule this training.
Completion of the initial training will be recorded on the New Employee Indoctrination Form and in the individual's training record.
This training shall be completed within 120 days of the employee's starting date.
The employee will not be permitted unescorted access to radiological controlled areas until the training described in Sections I,
II and IV have been completed.
B.
In addition to the initial general employee training, each new employee will participate in an indoctrination program.
The intent of this program is to familiarize the employee with the Trojan organization and basic policies.
I Employee Indoctrination Program 1.
The new employee will be instructed to report to Trojan Administrative Supervisor's office.
Upon arrival he will be escorted to meet with his im-mediate supervisor.
A0-9-1 Page 3 of 4
.g Revision 6 ATTACHMENT 9-1 LICENSEE'S SUPPLEMENTAL EESPONSES 2/29/80 TO INTERVENORS' INTERROGATORI PAGE 3 0F 4
.. c--
s 2.
Tho Administrative Supervisor will give the employee a "New Employee's Indoctrination Form".
This form lists the various plant personnel who may partici-pate in the employee's indoctrination as well as listing training requirements.
The employee's supervisor should indicate on the form which person-nel the new employee should meet with as part of his indoctrination.
VIII. EXEMPTIONS A.
Employees who hold a current operator's license and who are participating in a retraining program may be exempted from the retraining in Sections I through V of this order.
B.
Individuals who are members of the fire brigade may be exempted from the retraining in Section VI of this order.
IX.
RECORDS A.
The "New Employee's Indoctrination Form" is a working record and will not be retained.
B.
Those' individuals who receive the training listed in Sections I through VI of this order will be issued a blue card certifying the training received.
The card will te signed by a member of the training staff and will litt the individual's name, social security number and. che expiration date.
C.
Those individuals who receive only training listed in Sections II, III, V and VI of this order will be issued a yellow certification card.
D.
A record of the radiological control training will be retained for the life of the facility.
E.
A record of the other training received will be retained for the period of employment of the individual.
This l
record will list the employee's name, social security number, expiration date and will be color-coded as to the color of the certification card issued.
l l
l l
DFK A0-9-1 Page 4 of 4 Revision 6 ATTACHMENT 9-1 LICENSEE'S SUPPLEMENTAL M:SPONSF.S 2/29/80 TO INTERVENORS' INTERROGATORIE mA
MONT!!S O
1 2
3 4
5 6
7 I
I I
I I
I I
I TASK I l
l l
l l
l l
l 1.
Excav. & Place N' Wall Fdn.
l l
l l
l l
l l
2.
Prepare Wall Interfaces l
l l
l l
l l
l 3.
Form & Place Concrete Wall l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l TASK II l
l l
l l
l l
l 1.
Remove Existing Wall Surfaces l
l l
l l
l l
l 2.
Excav. & Place Wall Pdn.
l l
l l
l l
l l
3.
Drill Bolt lloles in "R" Wall l
l l
l l
l l
l 4.
Perform Wall Interface Work l
l l
l l
l l
l S.
Form & Place "R" Wall up to l
l l
l l
l l
l el.
59'-3" l
l l
l l
l l
l 6.
Set Plate "1"
& Place Conc.
l l
l l
l l
l l
7.
Set Plate "2"
& Place Conc.
l l
l l
l l
l l
8.
Set Plate "3"
& Place Conc.
l l
l l
l l
l 9.
Set Plate "4" & Place Grout l
l l
l l
l l
l 10.
Set Plate "5" & Place Grout l
l l
l l
l l
11.
Set Plate "6" & Place Grout l
l l
l l
l l
l 12.
Set Plate "7" & Place Grout l
l l
l l
l l
13.
Set Plate "B" & Place Grout l
l l
l l
l l
14.
Tension Bolts l
l l
l 1
l l
l l
l l
l l
l l
l T0 8 V2 l
l l
l l
l l
l TASK III l
l l
l l
l l
l go*
1.
Excavate & Place N Wall Fdn.
l l
l l
l l
l 2.
Form & Place Concrete to el. 60' l
l l
l l
l l
l 3.
Perform N Wall Interface Work l
l l
l l
l l
4.
Form & Place Concrete to el. 65' l
l l
l l
l l
S.
Drill lloles in Existing Wall l
l l
l l
l l
l Above el. 65' l
l l
l l
l l
6.
Form & Place Concrete to el. 77' l
l l
}
l l
l 7.
Form & Place Concrete to el. 95' l
l l
l l
l l
8.
Tension Bolts l
l l
l l
l l
Note [1] - Installation of Plate 7 will not commence until the concrete adjacent to Plates 1 through 3 has achieved its design strength.
[2] - Installation of Plate 8 will not commence until the first cold shutdown of the Plant following completion of the necessary preceding steps.
Supplemental Response to Interrogatory 21 In addition to the LERs and Reportable Occurrences supplied with Licensee's response dated September 17, 1979 to this Interrogatory, LER 79-15 (supplied to all parties by the NRC Staff on November 9, 1979) describing the " wall problem" involved a violation of Technical Specifications.
. 1-1 provides relevant portions of NOB minutes of the meetings "where LERs 79-02, 79-04, 79-09, 79-10 (all supplied with our previous response) and 79-15 were reviewed.
(LWE) l
-.a
/En@91%Lotr7Bf-DJ; LICENSEE'S SUPPLEMENTAL RESPONSES 2/29/80 TO INTERVENORS' INTERROGATO.'
NOB Masting No. 85 AGE 1 0F 4 October 15, 1979 Service Building - Bridge Level Conference Room The meeting was called to order by C. Goodwin, Chairman, at 1:30 p.m. in the Service Building Bridge Level Conference Room.
^
3.
Review of Licensee Event Reports - C. P. Yundt The NOB members indicated that they have reviewed the LER's as listed on the agenda.
Gary Zimmerman suggested that the NOB send a memorandum to Paul Yundt suggesting improvements to operator inspection for hangers in improper position and training to recognize defficiency similar to LER 79-13.
ATTACHMENT 21-1 LICENSEE'S SUPPLEMENTAL RESPONSES 2/29/80 NUCLEAR OPERATIONS BOARD MEETING No. 85 PAGE O
MONDAY, OCTOBER 15, 1979 SERVICE BUILDING BRIDGE LEVEL CONFERENCE ROOM 1.
Review and Approve Previous NOB Meeting Minutes (C. Goodwin, Jr.)
a.
April 2, 1979 - No. 77 b.
April 12, 1979 - No. 78 c.
April 24, 1979 - No. 79 d.
April 27, 1979 - No. 80 Corrections to Minutes No. 80 - dated July 3, 1979 (HRS-4T-79M) e.
June 4, 1979 - No. 81 f.
June 19, 1979 - No. 82 g.
July 6, 1979 - No. 83 h.
August 10, 1979 - No. 84 2.
Review Plant Review Board Meeting Minutes (C. Goodwin, Jr.)
a.
April 11, 1979 b.
April 16, 1979 c.
April 23, 1979 d.
April 25, 1979 e.
April 30, 1979 f.
May 1, 1979 g.
May 15, 1979 h.
May 31, 1979 1.
June 8, 1979
~
j.
June 22, 1979 k.
June 26, 1979 1.
July 17, 1979 3.
Review of Licensee Event Reports (C. P. Yundt) a.
79-02 b.
79-03 c.
79-04 d.
79-05 e.
79-06 f.
79-07 g.
79-08 h.
79-09 1.
79-10 j.
79-11 k.
79-12 1.
79-13 4
Review and Discuss License Change Requests (J. W. Lentsch) a.
LCR TNP-77-14 (Revision) b.
LCR TNP-79-03 c.
LCR TNP-79-12 5.
Review of Quality Assurance Audits and Responses (F. C. Gaidos) a.
License Audits (1) T-10 (GAI-42T-79M)
(2) T-12 (GAI-95T-79M)
A"TACHMENT 21-1 LICENSEE'S SUPPLEMENTAL RESPONSES 2/29/60 TO INTERVENORS' INTERROGAT01 MINUTES PAGE 3 0F 4 NOB Meeting No. 89 Februarv 13, 1980 i
- w=**************************************************
The =eeting was called to order by Chuck Goodwin at 9:30 a.m.
3.
Review of Licensee Event Reports (C. Goodwin)
The NOB reviewed and disc ussed the LER's and Special Reports as listed on the agenda.
9 4
A2T&d110@8ST 21-1 LICENSEE'S SUPPLEMENTAL RESPONSES 2/29/80 TO INTERVENORS' INTERROGATO PAGE 4 0F 4 NUCLEAR OPERATIONS BOARD MEETING NO. 39 SERVICE BUILDING PIRST FLOOR C0hs.AENCE ROOM 1.
Review and Approve Previous NOB Meeting Minu:es (C. Goodwin, Jr.)
a.
October 15, 1979 - No. 85 b.
Oc cber 19, 1979 - No. 86 c.
December 4,1979 - No. 87 d.
December 27, 1979 - No. 88 2.
Review Plant Review Board Meeting Minutes (C. Goodwin, Jr.)
a.
August 15, 1979 b.
September 4, 1979 c.
September 26, 1979 d.
Oc:cber 23, 1979 e.
Oc:ober 24, 1979 (2:30 p.m.)
f.
October 24, 1979 (5:00 p.m.)
g.
November 2, 1979 h.
November 7, 1979 1.
November 30, 1979 j.
Decenber 7, 1979 k.
December 26, 1979 1.
January 11, 1980 3.
Review of Licensee Even: Reports (C. Goodwin, 'Jr.)
a.
79-14 o.
79-15 79-15, Supplement 1 (D. J. 3roehl letter to NRC, November 19, 1979) c.
d.
79-15, Supplement 1 (D. J. 3rcehl letter to NRC, November 21, 1979) 79-15, Supplement 2 (D. J. 3,roehl letter to NRC, December 4, 1979) e.
f.
79-16 g.
Special Repor: (7-edia:e No:1fication, C?Y-447-79, and De: ailed Repo rt, C?Y-455-79) 4 Review and Discuss License Change Reques:s (J. W. Lentsch) a.
LCR TNP-79-16 b.
LCR TNP-79-18 5.
Review of Quality Assurance Audits and Responses (F. C. Gaidos) a.
License Audits (1) T-12 (C?Y-590-79)
(2) I-12 (GAI-4I-80M)
(3) I-13 (GAI-6T-80M) b.
LOOP I: ems and QAFR's (1) Verification and Closecut of LOOP I:e=s 615 and 620 (GAI-92T-79M l
(2) Verification of Resident Engineer's Correc:ive Ac: ion (GAI-lCOT-79M) l (3) Evaluation of Response :o QAFR 95/LCOP 702 (GAI-246NP-79M)
(4) 10 CFR 21 Evaluation of QAFR 95/LCOP 702 (GAI-213NP-79M)
(3) 10 CFR 21 Ivaluacion of QAFR 95/ LOO? 700 (JWL-04-80M)
(6) Evaluation of QAFR QA3-26-12 (GAI-204NP-79M, Rev. 1) 1
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
et al
)
(Control Building Procccding)
)
(Trojan Nuclear Plant)
)
STATE OF OREGON
)) ss County of Multncmah )
AFFIDAVIT OF LIEF W. ERICKSON Lief W. Erickson, being duly sworn according to law, deposes and says that he is Trojan Licensing Supervisor, Portland General Electric Company, and that the answers associated with his name and contained in Licensee's Supplemental Respotises dated February 29, 1980 to Interrogatories are true and correct to the best of his knowledge and belief.
).
~
~ Lief W. Erickson Subscribed and sworn to before me this 29th day of February 1930.
dede w
l Notary Public of4Dregon My Commission Expires
(,ce g [ /[/d
/
LWE/4sa10B1
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
et al
)
(Control Building Proceeding)
)
(Trojan Nuclear Plant)
)
STATE OF OREGON
)) ss County of Multnomah )
AFFIDAVIT OF RONALD W. JOHNSON Ronald W. Johnson, being duly sworn according to law, deposes and says that he is Assistant General Counsel, Portland General Electric Company, and that the answers associated with his name and contained in Licensee's Supplemental Responses dated February 29, 1980 to Interrogatories are true and correct to the best of his knowledge and belief.
)
k
^
l
-r Ronald W Johnson Subscribed and sworn to before me this 29th day of February 1980.
.dC
<h w
Notary Public of Oregon i
My Commission Expires te_,_ff /[dd
/
UIE/4sa10B2
UE4ITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
)
In the Matter of
)
4
)
PORTLAND GENERAL ELECTRIC COMPANY,)
Docket 50-344 et al.
)
)
(Control Building Procedure)
(Trojan Nuclear Flant)
)
)
STATE OF CALIFORNIA
)
)
ss County of San Francisco)
AFFIDAVIT OF R.
C. ANDERSON R. C, Anderson, being duly sworn accoring to law, deposes and says that he is Engineering Manager, Bechtel Power Corporation, and that the answers associated with his name and contained in Licensee's Responses dated February 29, 1980 to Interrogatories are true and correct to the best of his knowledge and belief.
(
n,n R.
C.
ANDERSON Subscribed and sworn to before me this 28th day of February 1980 gr,neeeereenwaran=ser.
y SHEPHERD M. !c.NKS s
NOTARY PUBLIC CALIFORNIA
" s M h. [d CITY ANO COUNTY OF g
SAN FiiANCISCO Notary Public of California y My Commission Expires Oct. 7,1980 Me8?B?heBdeb^ :iEE3 irs?d8BBPM-r