ML19309F801

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-338/80-05 & 50-339/80-04
ML19309F801
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/08/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19309F802 List:
References
NUDOCS 8005010244
Download: ML19309F801 (1)


See also: IR 05000338/1980005

Text

,8

'o,,

UNITED STATES

e*

e

NUCLEAR REGULATORY COMMISSifN

/

-

o

a

CE! ION 11

.

"o,

101 MARIETTA ST., N.W SUITE 3100

d"M8

-

%

e*

ATLANTA, GEORGIA 30303

8006010244

APR 0 81980

In Reply Refer To:

RII:PTB

50-338/80-05

.

Virginia Electric and Power Company

Attn:

J. H. Ferguson

Executive Vice President-Power

Post Office Box 26666

Richmond, VA 23261

Gentlemen:

Thank you for your letter of March 31, 1980, informing us of steps you

have taken to correct the item of noncompliance concerning activities

under NRC License No. NPF-4 brought to your attention in our letter of

March 14, 1980. We will examine your corrective actions and plans

during subsequent inspections.

We appreciate your cooperation with us.

Sincerely,

0&

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

cc:

W. R. Cartwright

Station Manager

Box 402

.

i

Mineral, VA 23117

P

P. G. Perry

Senior Resident Engineer

,

Post Office Box 38

Mineral, VA 23117

i

l

l

!-

. . . - . - . . - . . .

-

-.

.

L

[Q

h

VINGINIA ELECTRIC AND Powna Cox.rANY

Rrcunsono,VamorwzA 2026:

e,

..

March 31, 1980

.

.-

-=

=

-:

.s

..

-t'7

'-

. . .

^.',

h

Mr. James P. O'Reilly, Director

Serial No. 254/0314863

  • *

Of fice of Inspection and Enforcement

P0/RNT:baw

N

U. S. Nuclear Regulatory Commission

Docket Nos. 50-338

o

Region II

50-339

101 Marietta Street, Suite 3100

License No.

NPF-4

Atlanta, Georgia

30303

Permit No. CPPR-78

"

_

Dear Mr. O'Reilly:

We have reviewed your letter of March 14, 1980, in reference to the

inspection conducted at North Anna Power Station on February 11-15, 1980,

and reported in IE Inspection Report Nos. 50-338/80-05 and 50-338/80-04.

Our response to the specific infraction is attached.

We have determined that no proprietary information is contained in the

reports. Accordingly, the Virginia Electric and Power Company has no

objection to these inspection reports being made a matter of public

disclosure.

Very truly yours,

L :-

C. N.

Stallings

Vice President Power Supply

and Production Operations

Attachment

ec: Mr. Albert Schwencer

.

!

{

-!

<

    • T

-

~

..

-

-

-

.

'

.

.

.

Attachment

pig 1 1 of 1

.

Response to Notice of Violation

.

Items Reported in IE Inspection Report 50-338/80-05

NRC Comment

As required by Technical Specification 6.10.1.d. records of surveillance

activities required by Technical Specifications shall be retained for five

years.

Further, Technical Specification 4.1.1.2 requires that an overall

reactivity balance shall be compared to predicted values every 31 effective

full power days.

.

Contrary to the above, the records of Procedure 1-PT-11, " Core Reactivi-

ity Balance", performed in the period June 1978 to September 1979 showed a

complete lack of correlation between the dates and core exposures entered

on the data sheets. Other information available at the station and from

station personnel provide confidence that equivalent surveillances were per-

formed at the required frequency and with acceptable results.

This is a deficiency.

Response

The above deficiency is correct as stated.

Specifically, pursuant to

Section 2.201 of the NRC's " Rules of Practice" Part 2, title 10 Code of

!

Federal Regulstions, the following information is submitted:

1.

Corrective steps taken and results achieved:

To correct the condition as stated above, the Procedure (1-PT-11) has

been revised such that normal surveillance is based on dnta from current

plant status, instead of using the monthly Fuel Performance Characteristics

Report provided to the station by Vepco Fuel Resources Dept.

This eliminates

delays associated with interdepartmental correspondence since all calcula-

tions are performed at the site.

2.

Corrective steps which will be taken to avoid further non-compliance:

Wb believe that the above listed corrective action will be sufficient.

,

t

3.

Date when full compliance will be achieved:

Full compliance was achieved on 2/25/80.

.